【答案】应助回帖

怒江州位于云南省西北部,与缅甸接壤。整个怒江电网处于云南电网的末端,甚至是整个南方电网的末端。由于受地理位置限制及区域经济发展条件制约等各方面的影响,怒江电网110kV及以上电压等级的网架结构非常薄弱,与省网电气联络较弱,多为单线单变运行。
The power grid of Nujiang Prefecture, which is located in the northwestern part of Chinas Yunnan Province and  borders Burma, is the tail end of the  Yunnan Power Grid so far as to the whole China Southern Power Grid. Due to the influence of various aspects such as the  geographical restrictions and  restriction of regional economic development condition, the grid structures of  Nujiang power grid with 110kv or more voltage classes are very weak and less contacted with Province power grid with coil of single change.

» 本帖已获得的红花(最新10朵)

执此一生,只为一人,天涯海角,惟愿君安
2楼2015-07-07 16:21:05
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

灿灿妹

至尊木虫 (著名写手)

【答案】应助回帖

By June 2015, the total installed capacity for small hydropower stations in Nujiang Prefecture has attained 1305.5MW, the normal electrical load during the monsoon( May to October per annum) general was 250MW-330MW
执此一生,只为一人,天涯海角,惟愿君安
3楼2015-07-07 16:30:50
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

king特工87

金虫 (小有名气)

送红花一朵
引用回帖:
2楼: Originally posted by 灿灿妹 at 2015-07-07 16:21:05
怒江州位于云南省西北部,与缅甸接壤。整个怒江电网处于云南电网的末端,甚至是整个南方电网的末端。由于受地理位置限制及区域经济发展条件制约等各方面的影响,怒江电网110kV及以上电压等级的网架结构非常薄弱,与 ...

大侠!再帮着小弟翻译些吧!你翻译的比我好多了!专业多了 !金币不是问题啊!
坚持就是胜利
4楼2015-07-08 18:22:37
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
相关版块跳转 我要订阅楼主 king特工87 的主题更新
不应助 确定回帖应助 (注意:应助才可能被奖励,但不允许灌水,必须填写15个字符以上)
信息提示
请填处理意见