| 查看: 1090 | 回复: 3 | ||
| 本帖产生 1 个 翻译EPI ,点击这里进行查看 | ||
| 当前只显示满足指定条件的回帖,点击这里查看本话题的所有回帖 | ||
wangshingo木虫 (著名写手)
|
[求助]
有关风力发电机发电电压问题
|
|
|
For grid connected systems, there must be a reliable power grid/transmission network near the site so that the wind generated power can be fed into the grid. Normally, the wind turbine generates power at 400 V, which is stepped up to 11-110 kV, depending upon the power capacity of the wind system. If the wind power capacity is up to 6 MW, the voltage level is stepped up to 11/22 kV; for capacity of 6-10 MW, the voltage level is increased up to 33 kV; and for capacity higher than 10 MW, it is preferred to locate a 66 or 110 kV substation at the wind farm site [9]. Nonavailability of a reliable grid may have the following problems: |
» 猜你喜欢
两块石头
已经有10人回复
大佬帮着分析今年的评审意见?该课题连续申请了三年了,明年要不要换个方向。
已经有10人回复
售SCI一区T0P文章,我:8O.55.1.O.5.4,科目齐全,可+急
已经有4人回复
售SCI一区T0P文章,我:8O.55.1.O.54,科目全,可伽急
已经有6人回复
售SCI文章,我:8O.5.5.1O.54,科目全,可十急
已经有6人回复
售SCI一区T0P文章,我:8.O.55.1.O54,科目全,可伽急
已经有4人回复
售SCI一区T0P文章,我:8.O55.1.O.54,科目全,可十急
已经有6人回复
售SCI文章,我:8O5.5.1.O.54,科目齐全,可+急
已经有6人回复
售一区SCI文章T0P,我:8O.551.O54,科目全,可十急
已经有8人回复
售SCI一区T0P文章,我:8.O.55.1.O.5.4,科目全,可+急
已经有6人回复
wangshingo
木虫 (著名写手)
- 应助: 1 (幼儿园)
- 金币: 7750.6
- 散金: 786
- 红花: 3
- 帖子: 1577
- 在线: 250.6小时
- 虫号: 412998
- 注册: 2007-06-26
- 性别: MM
- 专业: 可再生与替代能源利用中的
4楼2011-11-24 09:56:14

2楼2011-11-23 19:19:21
wangshingo
木虫 (著名写手)
- 应助: 1 (幼儿园)
- 金币: 7750.6
- 散金: 786
- 红花: 3
- 帖子: 1577
- 在线: 250.6小时
- 虫号: 412998
- 注册: 2007-06-26
- 性别: MM
- 专业: 可再生与替代能源利用中的
3楼2011-11-24 09:54:44










回复此楼
100