有关风力发电机发电电压问题
|
|
|
For grid connected systems, there must be a reliable power grid/transmission network near the site so that the wind generated power can be fed into the grid. Normally, the wind turbine generates power at 400 V, which is stepped up to 11-110 kV, depending upon the power capacity of the wind system. If the wind power capacity is up to 6 MW, the voltage level is stepped up to 11/22 kV; for capacity of 6-10 MW, the voltage level is increased up to 33 kV; and for capacity higher than 10 MW, it is preferred to locate a 66 or 110 kV substation at the wind farm site [9]. Nonavailability of a reliable grid may have the following problems: |
» 猜你喜欢
售一区SCI文章T0P,我:8O.551.O54,科目全,可十急
已经有5人回复
时间戳又变了8-15
已经有11人回复
售SCI一区文章,我:8O5.5.1.O5.4,科目全,可伽急
已经有5人回复
售SCI一区文章,我:8O5.5.1.O5.4,科目全,可伽急
已经有3人回复
售SCI一区T0P文章,我:8.O55.1.O.54,科目全,可十急
已经有8人回复
欢迎发来filecode的Mz6后的代码验证其规律
已经有57人回复
有时候,自然基金真的不能太认真 (我的申报经验)
已经有9人回复
售SCI文章,我:8O.5.5.1O.54,科目全,可十急
已经有3人回复
售一区SCI文章T0P,我:8O.551.O54,科目全,可十急
已经有3人回复
关于Filecode分析方法
已经有13人回复

2楼2011-11-23 19:19:21
wangshingo
木虫 (著名写手)
- 应助: 1 (幼儿园)
- 金币: 7750.6
- 散金: 786
- 红花: 3
- 帖子: 1577
- 在线: 250.6小时
- 虫号: 412998
- 注册: 2007-06-26
- 性别: MM
- 专业: 可再生与替代能源利用中的
3楼2011-11-24 09:54:44
wangshingo
木虫 (著名写手)
- 应助: 1 (幼儿园)
- 金币: 7750.6
- 散金: 786
- 红花: 3
- 帖子: 1577
- 在线: 250.6小时
- 虫号: 412998
- 注册: 2007-06-26
- 性别: MM
- 专业: 可再生与替代能源利用中的
4楼2011-11-24 09:56:14










回复此楼