| 查看: 1043 | 回复: 3 | ||
| 本帖产生 1 个 翻译EPI ,点击这里进行查看 | ||
wangshingo木虫 (著名写手)
|
[求助]
有关风力发电机发电电压问题
|
|
|
For grid connected systems, there must be a reliable power grid/transmission network near the site so that the wind generated power can be fed into the grid. Normally, the wind turbine generates power at 400 V, which is stepped up to 11-110 kV, depending upon the power capacity of the wind system. If the wind power capacity is up to 6 MW, the voltage level is stepped up to 11/22 kV; for capacity of 6-10 MW, the voltage level is increased up to 33 kV; and for capacity higher than 10 MW, it is preferred to locate a 66 or 110 kV substation at the wind farm site [9]. Nonavailability of a reliable grid may have the following problems: |
» 猜你喜欢
有时候,自然基金真的不能太认真 (我的申报经验)
已经有10人回复
filecode
已经有12人回复
filecode=后面第一个是大写字母
已经有4人回复
时间戳又变了8-15
已经有20人回复
小木虫上这么多卖论文的,真有人买论文么?感觉没必要啊
已经有13人回复
欢迎发来filecode的Mz6后的代码验证其规律
已经有58人回复
哪位老哥知道今年的国自然具体哪一天放榜?
已经有7人回复
关于Filecode分析方法
已经有13人回复
各位道友,我要去昆明玩几天,回来见。
已经有8人回复
咱们一起用铁证分析2026国家社科基金中标与否
已经有22人回复

2楼2011-11-23 19:19:21
wangshingo
木虫 (著名写手)
- 应助: 1 (幼儿园)
- 金币: 7750.6
- 散金: 786
- 红花: 3
- 帖子: 1577
- 在线: 250.6小时
- 虫号: 412998
- 注册: 2007-06-26
- 性别: MM
- 专业: 可再生与替代能源利用中的
3楼2011-11-24 09:54:44
wangshingo
木虫 (著名写手)
- 应助: 1 (幼儿园)
- 金币: 7750.6
- 散金: 786
- 红花: 3
- 帖子: 1577
- 在线: 250.6小时
- 虫号: 412998
- 注册: 2007-06-26
- 性别: MM
- 专业: 可再生与替代能源利用中的
4楼2011-11-24 09:56:14










回复此楼