[求助]
有关风力发电机发电电压问题
|
|
|
For grid connected systems, there must be a reliable power grid/transmission network near the site so that the wind generated power can be fed into the grid. Normally, the wind turbine generates power at 400 V, which is stepped up to 11-110 kV, depending upon the power capacity of the wind system. If the wind power capacity is up to 6 MW, the voltage level is stepped up to 11/22 kV; for capacity of 6-10 MW, the voltage level is increased up to 33 kV; and for capacity higher than 10 MW, it is preferred to locate a 66 or 110 kV substation at the wind farm site [9]. Nonavailability of a reliable grid may have the following problems: |
» 猜你喜欢
322求调剂
已经有12人回复
电子信息270求调剂
已经有16人回复
272分材料子求调剂
已经有50人回复
295分求调剂
已经有13人回复
339求调剂
已经有9人回复
一志愿哈工大 085600 277 12材科基求调剂
已经有28人回复
调剂求收留
已经有28人回复
290调剂生物0860
已经有26人回复
2本,初试303,0860求调剂
已经有7人回复
材料工程281还有调剂机会吗
已经有28人回复

2楼2011-11-23 19:19:21
wangshingo
木虫 (著名写手)
- 应助: 1 (幼儿园)
- 金币: 7750.6
- 散金: 786
- 红花: 3
- 帖子: 1577
- 在线: 250.6小时
- 虫号: 412998
- 注册: 2007-06-26
- 性别: MM
- 专业: 可再生与替代能源利用中的
3楼2011-11-24 09:54:44
wangshingo
木虫 (著名写手)
- 应助: 1 (幼儿园)
- 金币: 7750.6
- 散金: 786
- 红花: 3
- 帖子: 1577
- 在线: 250.6小时
- 虫号: 412998
- 注册: 2007-06-26
- 性别: MM
- 专业: 可再生与替代能源利用中的
4楼2011-11-24 09:56:14













回复此楼