| 查看: 911 | 回复: 3 | ||
| 本帖产生 1 个 翻译EPI ,点击这里进行查看 | ||
wangshingo木虫 (著名写手)
|
[求助]
有关风力发电机发电电压问题
|
|
|
For grid connected systems, there must be a reliable power grid/transmission network near the site so that the wind generated power can be fed into the grid. Normally, the wind turbine generates power at 400 V, which is stepped up to 11-110 kV, depending upon the power capacity of the wind system. If the wind power capacity is up to 6 MW, the voltage level is stepped up to 11/22 kV; for capacity of 6-10 MW, the voltage level is increased up to 33 kV; and for capacity higher than 10 MW, it is preferred to locate a 66 or 110 kV substation at the wind farm site [9]. Nonavailability of a reliable grid may have the following problems: |
» 猜你喜欢
依托企业入选了国家启明计划青年人才。有无高校可以引进的。
已经有9人回复
有时候真觉得大城市人没有县城人甚至个体户幸福
已经有11人回复
表哥与省会女结婚,父母去帮带孩子被省会女气回家生重病了
已经有7人回复
同年申请2项不同项目,第1个项目里不写第2个项目的信息,可以吗
已经有8人回复
依托企业入选了国家启明计划青年人才。有无高校可以引进的。
已经有10人回复
天津大学招2026.09的博士生,欢迎大家推荐交流(博导是本人)
已经有9人回复
有院领导为了换新车,用横向课题经费买了俩车
已经有10人回复
AI 太可怕了,写基金时,提出想法,直接生成的文字比自己想得深远,还有科学性
已经有6人回复

2楼2011-11-23 19:19:21
wangshingo
木虫 (著名写手)
- 应助: 1 (幼儿园)
- 金币: 7750.6
- 散金: 786
- 红花: 3
- 帖子: 1577
- 在线: 250.6小时
- 虫号: 412998
- 注册: 2007-06-26
- 性别: MM
- 专业: 可再生与替代能源利用中的
3楼2011-11-24 09:54:44
wangshingo
木虫 (著名写手)
- 应助: 1 (幼儿园)
- 金币: 7750.6
- 散金: 786
- 红花: 3
- 帖子: 1577
- 在线: 250.6小时
- 虫号: 412998
- 注册: 2007-06-26
- 性别: MM
- 专业: 可再生与替代能源利用中的
4楼2011-11-24 09:56:14













回复此楼