| 查看: 876 | 回复: 3 | |||
| 本帖产生 1 个 翻译EPI ,点击这里进行查看 | |||
wangshingo木虫 (著名写手)
|
[求助]
有关风力发电机发电电压问题
|
||
|
For grid connected systems, there must be a reliable power grid/transmission network near the site so that the wind generated power can be fed into the grid. Normally, the wind turbine generates power at 400 V, which is stepped up to 11-110 kV, depending upon the power capacity of the wind system. If the wind power capacity is up to 6 MW, the voltage level is stepped up to 11/22 kV; for capacity of 6-10 MW, the voltage level is increased up to 33 kV; and for capacity higher than 10 MW, it is preferred to locate a 66 or 110 kV substation at the wind farm site [9]. Nonavailability of a reliable grid may have the following problems: |
» 猜你喜欢
论文终于录用啦!满足毕业条件了
已经有12人回复
2025年遐想
已经有4人回复
投稿Elsevier的杂志(返修),总是在选择OA和subscription界面被踢皮球
已经有8人回复
求个博导看看
已经有18人回复

2楼2011-11-23 19:19:21
wangshingo
木虫 (著名写手)
- 应助: 1 (幼儿园)
- 金币: 7750.6
- 散金: 786
- 红花: 3
- 帖子: 1577
- 在线: 250.6小时
- 虫号: 412998
- 注册: 2007-06-26
- 性别: MM
- 专业: 可再生与替代能源利用中的
3楼2011-11-24 09:54:44
wangshingo
木虫 (著名写手)
- 应助: 1 (幼儿园)
- 金币: 7750.6
- 散金: 786
- 红花: 3
- 帖子: 1577
- 在线: 250.6小时
- 虫号: 412998
- 注册: 2007-06-26
- 性别: MM
- 专业: 可再生与替代能源利用中的
4楼2011-11-24 09:56:14







回复此楼