24小时热门版块排行榜    

查看: 1673  |  回复: 13

alick.net

木虫 (小有名气)


[交流] 【Activity】who can help me to translate the words below?

forewords: for job sake, i need to fully understand the words. however, i can just get a general  ideas for lack of reading skills .so can any of u help me?       

According to local administration of work safety’s requirement, the safety assessment of major hazard installations identified for dangerous chemicals shall be conducted by a qualified institution which issue a “Major safety hazards assessment report”. If the existing safety assessment report for the whole facility, includes the contents of major hazard installations for dangerous chemicals, the existing safety assessment report may substitute the safety assessment report of major hazard installations. The control and supervision of major hazard of installations for dangerous chemicals shall meet to requirement of administration of work safety.
回复此楼

» 猜你喜欢

» 抢金币啦!回帖就可以得到:

查看全部散金贴

已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
★ ★ ★ ★ ★
xia_chong(金币+5):Good job! I'll try.:D 2011-01-06 20:28:04
According to local administration of work safety’s requirement, the safety assessment of major hazard installations identified for dangerous chemicals shall be conducted by a qualified institution which issue a “Major safety hazards assessment report”. If the existing safety assessment report for the whole facility, includes the contents of major hazard installations for dangerous chemicals, the existing safety assessment report may substitute the safety assessment report of major hazard installations. The control and supervision of major hazard of installations for dangerous chemicals shall meet to requirement of administration of work safety.
根据当地政府安全生产的要求,关于生产危险化学品的主要装置的鉴定应该按照资格机构制定的“安全性方面的危害评估报告”。如果现有的安全评估报告是关于整个设备的,其中包括生产危险化学品的主要装置,那么现有的安全评估报告可以代替那个关于主要装置的安全评估。主要危险装置的控制和管理应符合管理机关工作安全要求。

仅仅是我自己理解的,因为对此专业不了解,仅供参考~~
6楼2011-01-06 13:44:24
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

yanglinast

铜虫 (正式写手)


★ ★ ★ ★ ★
xia_chong(金币+5):Great! I'll have a try by myself. :D 2011-01-06 20:28:27
按照当地政府安全部门的相关规定,一些被划定为危险化学品的反应装置安装是要由具备Major safety hazards assessment report资格认证的专门人员管理。如果现有的评估报告是针对所有设备的,包括主要危险化学品的装置目录,则现有安全评估报告可以取代主要危险装置安全报告。一些主要危险化学品装置的管理和监控必须符合政府安全管理要求。

不太确定是不是这样子!
7楼2011-01-06 13:53:14
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

yb716

金虫 (正式写手)


差不多吧
8楼2011-01-06 13:55:52
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

alick.net

木虫 (小有名气)


引用回帖:
Originally posted by 三更雨~ at 2011-01-06 13:44:24:
According to local administration of work safety’s requirement, the safety assessment of major hazard installations identified for dangerous chemicals shall be conducted by a qualified institution ...

thanks very much. it reads nice and can surely help me master the whole documents where it located.
9楼2011-01-06 14:16:05
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

alick.net

木虫 (小有名气)


引用回帖:
Originally posted by yanglinast at 2011-01-06 13:53:14:
按照当地政府安全部门的相关规定,一些被划定为危险化学品的反应装置安装是要由具备Major safety hazards assessment report资格认证的专门人员管理。如果现有的评估报告是针对所有设备的,包括主要危险化学品的装 ...

thanks ,but myself donot get the correct answers . it is surely wihout much deviation at least.
10楼2011-01-06 14:19:35
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
引用回帖:
Originally posted by alick.net at 2011-01-06 14:16:05:


thanks very much. it reads nice and can surely help me master the whole documents where it located.

You are welcome~
11楼2011-01-06 14:22:47
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
let the moderators help you
12楼2011-01-06 19:40:08
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
引用回帖:
Originally posted by 三更雨~ at 2011-01-06 13:44:24:
According to local administration of work safety’s requirement, the safety assessment of major hazard installations identified for dangerous chemicals shall be conducted by a qualified institution ...

I think it is very good!
13楼2011-01-06 20:36:24
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
引用回帖:
Originally posted by xia_chong at 2011-01-06 20:36:24:



I think it is very good!

O(∩_∩)O~
14楼2011-01-06 20:57:22
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
简单回复
2011-01-06 13:22   回复  
alick.net(金币+1):谢谢参与
alick.net(金币+1): 2011-01-06 13:33:47
2011-01-06 13:25   回复  
alick.net(金币+1):谢谢参与
zlongz1204楼
2011-01-06 13:30   回复  
alick.net(金币+1):谢谢参与
2011-01-06 13:31   回复  
alick.net(金币+1):谢谢参与
相关版块跳转 我要订阅楼主 alick.net 的主题更新
普通表情 高级回复 (可上传附件)
最具人气热帖推荐 [查看全部] 作者 回/看 最后发表
[考研] 环境工程调剂 +5 大可digkids 2026-03-16 5/250 2026-03-16 16:45 by houyaoxu
[考研] 285求调剂 +6 ytter 2026-03-12 6/300 2026-03-16 15:05 by njzyff
[考研] 化学调剂0703 +7 啊我我的 2026-03-11 7/350 2026-03-15 23:03 by 凌千颂111
[考研] 【0703化学调剂】-一志愿华中师范大学-六级475 +5 Becho359 2026-03-11 5/250 2026-03-14 11:35 by 哦哦123
[考研] 328,0703考生求调剂,一志愿为东北师范大学 +4 观素律 2026-03-09 5/250 2026-03-14 01:24 by JourneyLucky
[考研] b区环境工程求调剂 +4 Maps1 2026-03-10 6/300 2026-03-14 00:23 by JourneyLucky
[考研] 279求调剂 +3 抓着星星的女孩 2026-03-10 3/150 2026-03-13 23:47 by userper
[考研] 341求调剂 +3 番茄头--- 2026-03-10 3/150 2026-03-13 23:07 by JourneyLucky
[考研] 材料专硕288分求调剂 一志愿211 +4 在家想你 2026-03-11 4/200 2026-03-13 22:49 by JourneyLucky
[考研] 304求调剂 +6 Mochaaaa 2026-03-12 7/350 2026-03-13 22:18 by 星空星月
[考研] 26调剂/材料/英一数二/总分289/已过A区线 +6 步川酷紫123 2026-03-13 6/300 2026-03-13 21:59 by 星空星月
[考研] 一志愿西南交大,材料专硕317求调剂 +5 lx8568 2026-03-11 5/250 2026-03-13 21:43 by peike
[考研] (081700)化学工程与技术-298分求调剂 +12 11啦啦啦 2026-03-11 35/1750 2026-03-13 21:25 by JourneyLucky
[考研] 285化工学硕求调剂(081700) +6 柴郡猫_ 2026-03-12 6/300 2026-03-13 20:46 by hmn_wj
[考研] 【0856】化学工程(085602)313 分,本科学科评估A类院校化学工程与工艺,诚求调剂 +7 小刘快快上岸 2026-03-11 7/350 2026-03-13 16:06 by ruiyingmiao
[考研] 307求调剂 +5 超级伊昂大王 2026-03-12 5/250 2026-03-13 15:56 by 棒棒球手
[考研] 工科278分求调剂 +5 周慢热啊 2026-03-12 7/350 2026-03-13 15:49 by JourneyLucky
[考研] 求调剂 +3 程雨杭 2026-03-12 3/150 2026-03-13 15:06 by JourneyLucky
[考研] 328化工专硕求调剂 +4 。,。,。,。i 2026-03-12 4/200 2026-03-13 14:44 by JourneyLucky
[考研] 290求调剂 +3 ADT 2026-03-13 3/150 2026-03-13 10:19 by peike
信息提示
请填处理意见