| 查看: 1673 | 回复: 13 | |||
[交流]
【Activity】who can help me to translate the words below?
|
|||
forewords: for job sake, i need to fully understand the words. however, i can just get a general ideas for lack of reading skills .so can any of u help me? According to local administration of work safety’s requirement, the safety assessment of major hazard installations identified for dangerous chemicals shall be conducted by a qualified institution which issue a “Major safety hazards assessment report”. If the existing safety assessment report for the whole facility, includes the contents of major hazard installations for dangerous chemicals, the existing safety assessment report may substitute the safety assessment report of major hazard installations. The control and supervision of major hazard of installations for dangerous chemicals shall meet to requirement of administration of work safety. |
» 猜你喜欢
304求调剂
已经有4人回复
326求调剂
已经有4人回复
一志愿苏州大学材料工程(085601)专硕有科研经历三项国奖两个实用型专利一项省级立项
已经有4人回复
环境工程调剂
已经有5人回复
本人考085602 化学工程 专硕
已经有14人回复
一志愿211 0703方向310分求调剂
已经有3人回复
0703化学336分求调剂
已经有3人回复
318求调剂
已经有3人回复
化学工程321分求调剂
已经有9人回复
0703化学调剂
已经有9人回复
» 抢金币啦!回帖就可以得到:
物理学 调剂
+1/80
福建师范大学招收2026年化学、材料硕士3-4名
+1/78
南开大学罗景山教授课题组招聘博士后(光/电催化、钙钛矿光伏方向)
+2/34
新疆大学招收学硕调剂
+1/24
厦门大学航空航天学院智能制造课题组招2026年申请审核制博士生1名
+1/22
论文投出,祈福,求好运
+1/20
南京林业大学-国家级青年人才团队 招2026级申请考核制博士(合成化学、植物化学方向)
+1/19
北京理工大学-化学与化工学院-招收2026级博士生 [申请-考核制]
+1/17
上海科技大学招收有机化学方向招收2026级工程博士
+1/8
福州大学国家级人才汤育欣教授课题组2026年招收”申请考核制“储能电池方向博士研究生
+1/8
哈尔滨理工大学材料与化学工程学院 纳米功能材料与光电催化团队 招收硕士研究生
+1/7
重庆大学药学院闫海龙课题组拟招收2026年申请考核制博士研究生
+1/5
发paper
+1/5
上海第二工业大学-朱大海课题组招生(过线就能调剂)
+1/5
新加坡国立大学刘小钢课题组招聘博士后
+1/5
西交利物浦大学/氮化镓基 CMOS 技术的物理驱动与人工智能增强方法/招博士研究生
+1/4
复旦大学集成电路学院程增光课题组急聘科研助理
+1/3
福建师范大学国家级人才团队招收2026年调剂的硕士研究生若干名
+1/2
欢迎报考浙江工业大学埃克塞特联合学院硕士研究生
+1/1
澳大利亚科学院院士Prof.Gordon Wallace, University of Wollongong 全奖博士机会
+1/1
★ ★ ★ ★ ★
xia_chong(金币+5):Good job! I'll try.:D 2011-01-06 20:28:04
xia_chong(金币+5):Good job! I'll try.:D 2011-01-06 20:28:04
|
According to local administration of work safety’s requirement, the safety assessment of major hazard installations identified for dangerous chemicals shall be conducted by a qualified institution which issue a “Major safety hazards assessment report”. If the existing safety assessment report for the whole facility, includes the contents of major hazard installations for dangerous chemicals, the existing safety assessment report may substitute the safety assessment report of major hazard installations. The control and supervision of major hazard of installations for dangerous chemicals shall meet to requirement of administration of work safety. 根据当地政府安全生产的要求,关于生产危险化学品的主要装置的鉴定应该按照资格机构制定的“安全性方面的危害评估报告”。如果现有的安全评估报告是关于整个设备的,其中包括生产危险化学品的主要装置,那么现有的安全评估报告可以代替那个关于主要装置的安全评估。主要危险装置的控制和管理应符合管理机关工作安全要求。 仅仅是我自己理解的,因为对此专业不了解,仅供参考~~ |
6楼2011-01-06 13:44:24
7楼2011-01-06 13:53:14
8楼2011-01-06 13:55:52
9楼2011-01-06 14:16:05
10楼2011-01-06 14:19:35
11楼2011-01-06 14:22:47
12楼2011-01-06 19:40:08
13楼2011-01-06 20:36:24
14楼2011-01-06 20:57:22
简单回复
三更雨~2楼
2011-01-06 13:22
回复
alick.net(金币+1):谢谢参与
alick.net(金币+1): 2011-01-06 13:33:47
alick.net(金币+1): 2011-01-06 13:33:47
打瞌睡的糖3楼
2011-01-06 13:25
回复
alick.net(金币+1):谢谢参与
2011-01-06 13:30
回复
alick.net(金币+1):谢谢参与
2011-01-06 13:31
回复
alick.net(金币+1):谢谢参与













回复此楼
O(∩_∩)O~