24小时热门版块排行榜    

查看: 482  |  回复: 3
本帖产生 1 个 ,点击这里进行查看
当前只显示满足指定条件的回帖,点击这里查看本话题的所有回帖

水象星座

新虫 (初入文坛)

[求助] 求助查询一篇文章是否被EI检索

论文名称:schedule management of airport flying area construction based on bim
作者姓名:zhang yonzi,cai liangcai,fan min
会议名称:the 4th international conference on civil engineering,architecture and building material

[ 发自手机版 https://muchong.com/3g ]
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

水象星座

新虫 (初入文坛)

如果检索麻烦把检索号给我

[ 发自手机版 https://muchong.com/3g ]
3楼2015-07-06 23:29:44
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
查看全部 4 个回答

水象星座

新虫 (初入文坛)

时间:2014

[ 发自手机版 https://muchong.com/3g ]
2楼2015-07-06 23:28:14
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

心静_依然

版主 (知名作家)

命中※注定

优秀版主优秀版主

【答案】应助回帖

★ ★ ★ ★ ★ ★ ★ ★
感谢参与,应助指数 +1
sunshan4379: 金币+8, LS-EPI+1, 感谢应助! 2015-07-11 11:08:32
Accession number:       
20143218035152
        Title:        Schedule management of airport flying area construction based on BIM
        Authors:        Zhang, Yin Zi1 Email author zhangyinzi@hotmail.com; Cai, Liang Cai1; Fan, Min1 Email author minnfa@163.com
        Author affiliation:        1 Department of Airport Construction, Air Force Engineering University, 710038, China
        Source title:        Applied Mechanics and Materials
        Abbreviated source title:        Appl. Mech. Mater.
        Volume:        584-586
        Monograph title:        Architecture, Building Materials and Engineering Management IV
        Issue date:        2014
        Publication year:        2014
        Pages:        2653-2658
        Language:        English
        ISSN:        16609336
        E-ISSN:        16627482
        ISBN-13:        9783038351665
        Document type:        Conference article (CA)
        Conference name:        4th International Conference on Civil Engineering, Architecture and Building Materials, CEABM 2014
        Conference date:        May 24, 2014 - May 25, 2014
        Conference location:        Haikou, China
        Conference code:        106661
        Publisher:        Trans Tech Publications Ltd
        Abstract:        Airport flying area construction is a complex dynamic process. Its typical features including: complex construction process, large construction area, underground pipe trench interwoven and so on. Traditional construction schedule management of airport flying area is based on Gantt charts and network diagrams, which is generated before the construction, not supporting real-time updates. A preliminary exploration of BIM-based schedule management in airport flying area engineering is conducted. Using Civil3D, Revit, Navisworks and MS Project software, the construction image progress model can be established. Manager also can achieve laying on the type of runway, the number of layers, daily progress charts and updates, and to achieve global control so as to improve management efficiency and management quality. © (2014) Trans Tech Publications, Switzerland.
        Number of references:        5
        Main heading:        Airports
        Controlled terms:        Architectural design  -  Building materials  -  Complex networks  -  Network architecture  -  Trenching
        Uncontrolled terms:        BIM technologies  -  Complex construction  -  Management efficiency  -  Management quality  -  Real-time updates  -  Schedule management  -  Traditional constructions  -  Underground pipes
        Classification code:        402 Buildings and Towers -  411 Bituminous Materials -  412 Concrete -  413 Insulating Materials -  414 Masonry Materials -  415 Metals, Plastics, Wood and Other Structural Materials -  431.4 Airports -  619.1 Pipe, Piping and Pipelines -  722 Computer Systems and Equipment
        DOI:        10.4028/www.scientific.net/AMM.584-586.2653
        Database:        Compendex
                Compilation and indexing terms, © 2015 Elsevier Inc.
不忘初心......
4楼2015-07-07 09:22:56
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
最具人气热帖推荐 [查看全部] 作者 回/看 最后发表
[基金申请] 面上合作单位盖章 +4 ssyjh 2026-08-27 4/200 2026-08-27 20:01 by hitsdu
[基金申请] 投票:  有多少人是今天查系统知道结果的? +15 爱看书的可乐 2026-08-26 17/850 2026-08-27 19:59 by xxniao123
[基金申请] 为什么资助数各大高校都创新高,自己申请怎么就这么难 +8 Kittylucky 2026-08-27 8/400 2026-08-27 18:33 by raiy123
[基金申请] 青基如何破局 +6 lyz123lyz 2026-08-27 7/350 2026-08-27 17:31 by 宁静致远sy
[基金申请] 国自然面上复盘~欢迎讨论 (金币+5) +10 晴天加油 2026-08-26 11/550 2026-08-27 16:35 by msuhlx
[基金申请] 基金未中,这种答复是模板吗? +5 zhaosm1982 2026-08-27 6/300 2026-08-27 16:00 by lfy8008
[基金申请] 怎么看青基中了没有啊 +5 叶九微 2026-08-26 5/250 2026-08-27 10:35 by l_zh2008
[基金申请] 为什么 国际(地区)合作与交流项目 没有放榜? 10+3 majunge000 2026-08-26 11/550 2026-08-27 08:42 by 北京莱茵编辑
[教师之家] 售SCI一区文章,我:8.O.551.O.5.4,科目全,可伽急 +3 LIbGuocjEEYw 2026-08-26 4/200 2026-08-27 04:33 by Ie9AyIAvGbvs
[基金申请] 范进中举一文的中心思想 +9 炎黄贵胄 2026-08-22 10/500 2026-08-26 15:40 by semaglutide
[基金申请] 2026国自然函评费到账 +22 羊腰板 2026-08-21 25/1250 2026-08-26 15:00 by zuocuiping
[基金申请] 出来了 +9 trojank 2026-08-26 9/450 2026-08-26 14:25 by 宝贝虫子
[基金申请] 国际合作可查了,中了面上 (EPI+1)(金币+50) +18 Ldrop2023 2026-08-26 18/900 2026-08-26 11:15 by cmrandy
[基金申请] 牛来!米来!面来! +8 beefly 2026-08-26 8/400 2026-08-26 08:37 by xuzhipiao
[基金申请] 明天应该可查了!? +6 chengyan1220 2026-08-23 6/300 2026-08-25 19:45 by zfd97
[基金申请] 没有任何消息-是不是就凉了 +9 图啦图啦 2026-08-24 10/500 2026-08-25 11:59 by 南海小哥
[基金申请] 建议基金发布提前给出明确的时间点 +13 kulium 2026-08-21 16/800 2026-08-24 16:27 by superceng
[基金申请] 时间戳今天,20号变了 +5 archvillain 2026-08-20 5/250 2026-08-22 06:12 by hui_daxiao
[基金申请] 看来今天不会放榜了? +8 chengyan1220 2026-08-21 11/550 2026-08-21 17:52 by dcqxinyang
[基金申请] 应该是下周三26日公布了吧? +4 哈哈蛤? 2026-08-21 4/200 2026-08-21 10:58 by Vivilian
信息提示
请填处理意见