| 查看: 347 | 回复: 3 | ||
| 本帖产生 1 个 ,点击这里进行查看 | ||
[求助]
求助查询一篇文章是否被EI检索
|
||
|
论文名称:schedule management of airport flying area construction based on bim 作者姓名:zhang yonzi,cai liangcai,fan min 会议名称:the 4th international conference on civil engineering,architecture and building material [ 发自手机版 https://muchong.com/3g ] |
» 猜你喜欢
计算机、0854电子信息(085401-058412)调剂
已经有4人回复
基金申报
已经有3人回复
国自然申请面上模板最新2026版出了吗?
已经有9人回复
溴的反应液脱色
已经有6人回复
纳米粒子粒径的测量
已经有7人回复
常年博士招收(双一流,工科)
已经有4人回复
推荐一本书
已经有10人回复
参与限项
已经有5人回复
有没有人能给点建议
已经有5人回复
假如你的研究生提出不合理要求
已经有12人回复
2楼2015-07-06 23:28:14
3楼2015-07-06 23:29:44
心静_依然
版主 (知名作家)
命中※注定
- 应助: 327 (大学生)
- 贵宾: 2.396
- 金币: 77406.9
- 散金: 13395
- 红花: 211
- 沙发: 98
- 帖子: 8367
- 在线: 2109.5小时
- 虫号: 3472728
- 注册: 2014-10-13
- 性别: GG
- 专业: 资源化工
- 管辖: 检索知识
【答案】应助回帖
★ ★ ★ ★ ★ ★ ★ ★
感谢参与,应助指数 +1
sunshan4379: 金币+8, LS-EPI+1, 感谢应助! 2015-07-11 11:08:32
感谢参与,应助指数 +1
sunshan4379: 金币+8, LS-EPI+1, 感谢应助! 2015-07-11 11:08:32
|
Accession number: 20143218035152 Title: Schedule management of airport flying area construction based on BIM Authors: Zhang, Yin Zi1 Email author zhangyinzi@hotmail.com; Cai, Liang Cai1; Fan, Min1 Email author minnfa@163.com Author affiliation: 1 Department of Airport Construction, Air Force Engineering University, 710038, China Source title: Applied Mechanics and Materials Abbreviated source title: Appl. Mech. Mater. Volume: 584-586 Monograph title: Architecture, Building Materials and Engineering Management IV Issue date: 2014 Publication year: 2014 Pages: 2653-2658 Language: English ISSN: 16609336 E-ISSN: 16627482 ISBN-13: 9783038351665 Document type: Conference article (CA) Conference name: 4th International Conference on Civil Engineering, Architecture and Building Materials, CEABM 2014 Conference date: May 24, 2014 - May 25, 2014 Conference location: Haikou, China Conference code: 106661 Publisher: Trans Tech Publications Ltd Abstract: Airport flying area construction is a complex dynamic process. Its typical features including: complex construction process, large construction area, underground pipe trench interwoven and so on. Traditional construction schedule management of airport flying area is based on Gantt charts and network diagrams, which is generated before the construction, not supporting real-time updates. A preliminary exploration of BIM-based schedule management in airport flying area engineering is conducted. Using Civil3D, Revit, Navisworks and MS Project software, the construction image progress model can be established. Manager also can achieve laying on the type of runway, the number of layers, daily progress charts and updates, and to achieve global control so as to improve management efficiency and management quality. © (2014) Trans Tech Publications, Switzerland. Number of references: 5 Main heading: Airports Controlled terms: Architectural design - Building materials - Complex networks - Network architecture - Trenching Uncontrolled terms: BIM technologies - Complex construction - Management efficiency - Management quality - Real-time updates - Schedule management - Traditional constructions - Underground pipes Classification code: 402 Buildings and Towers - 411 Bituminous Materials - 412 Concrete - 413 Insulating Materials - 414 Masonry Materials - 415 Metals, Plastics, Wood and Other Structural Materials - 431.4 Airports - 619.1 Pipe, Piping and Pipelines - 722 Computer Systems and Equipment DOI: 10.4028/www.scientific.net/AMM.584-586.2653 Database: Compendex Compilation and indexing terms, © 2015 Elsevier Inc. |

4楼2015-07-07 09:22:56












回复此楼