24小时热门版块排行榜    

查看: 347  |  回复: 3
本帖产生 1 个 ,点击这里进行查看

水象星座

新虫 (初入文坛)

[求助] 求助查询一篇文章是否被EI检索

论文名称:schedule management of airport flying area construction based on bim
作者姓名:zhang yonzi,cai liangcai,fan min
会议名称:the 4th international conference on civil engineering,architecture and building material

[ 发自手机版 https://muchong.com/3g ]

» 猜你喜欢

已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

水象星座

新虫 (初入文坛)

时间:2014

[ 发自手机版 https://muchong.com/3g ]
2楼2015-07-06 23:28:14
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

水象星座

新虫 (初入文坛)

如果检索麻烦把检索号给我

[ 发自手机版 https://muchong.com/3g ]
3楼2015-07-06 23:29:44
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

心静_依然

版主 (知名作家)

命中※注定

优秀版主优秀版主

【答案】应助回帖

★ ★ ★ ★ ★ ★ ★ ★
感谢参与,应助指数 +1
sunshan4379: 金币+8, LS-EPI+1, 感谢应助! 2015-07-11 11:08:32
Accession number:       
20143218035152
        Title:        Schedule management of airport flying area construction based on BIM
        Authors:        Zhang, Yin Zi1 Email author zhangyinzi@hotmail.com; Cai, Liang Cai1; Fan, Min1 Email author minnfa@163.com
        Author affiliation:        1 Department of Airport Construction, Air Force Engineering University, 710038, China
        Source title:        Applied Mechanics and Materials
        Abbreviated source title:        Appl. Mech. Mater.
        Volume:        584-586
        Monograph title:        Architecture, Building Materials and Engineering Management IV
        Issue date:        2014
        Publication year:        2014
        Pages:        2653-2658
        Language:        English
        ISSN:        16609336
        E-ISSN:        16627482
        ISBN-13:        9783038351665
        Document type:        Conference article (CA)
        Conference name:        4th International Conference on Civil Engineering, Architecture and Building Materials, CEABM 2014
        Conference date:        May 24, 2014 - May 25, 2014
        Conference location:        Haikou, China
        Conference code:        106661
        Publisher:        Trans Tech Publications Ltd
        Abstract:        Airport flying area construction is a complex dynamic process. Its typical features including: complex construction process, large construction area, underground pipe trench interwoven and so on. Traditional construction schedule management of airport flying area is based on Gantt charts and network diagrams, which is generated before the construction, not supporting real-time updates. A preliminary exploration of BIM-based schedule management in airport flying area engineering is conducted. Using Civil3D, Revit, Navisworks and MS Project software, the construction image progress model can be established. Manager also can achieve laying on the type of runway, the number of layers, daily progress charts and updates, and to achieve global control so as to improve management efficiency and management quality. © (2014) Trans Tech Publications, Switzerland.
        Number of references:        5
        Main heading:        Airports
        Controlled terms:        Architectural design  -  Building materials  -  Complex networks  -  Network architecture  -  Trenching
        Uncontrolled terms:        BIM technologies  -  Complex construction  -  Management efficiency  -  Management quality  -  Real-time updates  -  Schedule management  -  Traditional constructions  -  Underground pipes
        Classification code:        402 Buildings and Towers -  411 Bituminous Materials -  412 Concrete -  413 Insulating Materials -  414 Masonry Materials -  415 Metals, Plastics, Wood and Other Structural Materials -  431.4 Airports -  619.1 Pipe, Piping and Pipelines -  722 Computer Systems and Equipment
        DOI:        10.4028/www.scientific.net/AMM.584-586.2653
        Database:        Compendex
                Compilation and indexing terms, © 2015 Elsevier Inc.
不忘初心......
4楼2015-07-07 09:22:56
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
相关版块跳转 我要订阅楼主 水象星座 的主题更新
信息提示
请填处理意见