[求助] 帮我翻译几句话,谢谢

2. CAVITY WALL CONSTRUCTION
Cavity wall construction to be executed in the following areas, as per drawings: Production building, technical/ energy building.
The cavity wall construction for the exterior walls has to be executed in aluminum-trapezoidal sheet metal, thickness= 1mm. The wave profile dimensions can be requested via the Project Management and measured on a sample sheet metal during clarification meeting.
Brand/ product for Aluminum Panels/ Boards/ Metal Sheeting:
(please refer to Technical Schedule-Architecture for further details):
Corus or Thyssen Krupp
Brand/ product for Mechanical screws, anchors and curtain wall fixation:
(please refer to Technical Schedule-Architecture for further details):
Fischer
Insulation material to be executed as: pressed panels, thickness = according to heat-insulation-calculation, but has to fulfill minimum thermal resistance of 0.40, meaning = minimum thickness 14cm, rigid material, with moisture proof layer.
Brand/ product for Insulation material:
(please refer to Technical Schedule-Architecture for further details):
Rockwool (Roxul)
Insulation material to be screwed on to distance-profiles, including all fittings, weather groove/ plate with lug pattern/ window drip, corner angle-metal sheets/ corner-surrounding metal-sheets, window- and door-corner metal-sheets. All corner sheeting has to be without butt joints. The aluminum-trapezoidal sheet metal has to have a finished top-coating, color: RAL 1002 – sand yellow. PVDF coated (thickness =min 45 μm). All visible elements with PVDF coating.
The external sun-louvers have to be considered when mounting the external façade panels.
The internal horizontal steel panels to be continuously galvanized on both sides, thickness= 1mm, including a PVDF plastic-coating RAL 9002 (thickness =min 25 μm), mounted on continuously galvanized Z-shaped distance-profiles of a minimum thickness= 1,25mm, including a vapor-permeable foil layer which has to be applied over the total insulation area.
Façade panels to be executed as cross joints (overlapping), the building corners to be executed positive.
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

zeng-haochen

至尊木虫 (知名作家)

晕,太多了!!至少30个金币会有人帮你的!!
2楼2007-06-30 15:04:23
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

guojinming

金虫 (正式写手)

我一点也看不懂,估计专业人士会认为很简单,我会加金币,老师要偶翻译,其实和我们专业一点也不相关
3楼2007-06-30 15:15:23
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

trixaypm

木虫 (职业作家)

枯藤老树昏虫兼小木虫清洁工

编辑............

[ Last edited by trixaypm on 2007-6-30 at 15:21 ]
4楼2007-06-30 15:19:13
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
相关版块跳转 我要订阅楼主 guojinming 的主题更新
不应助 确定回帖应助 (注意:应助才可能被奖励,但不允许灌水,必须填写15个字符以上)
信息提示
请填处理意见