| 查看: 129 | 回复: 3 | |||
| 当前主题已经存档。 | |||
| 【悬赏金币】回答本帖问题,作者guojinming将赠送您 5 个金币 | |||
guojinming金虫 (正式写手)
|
[求助]
帮我翻译几句话,谢谢
|
||
|
2. CAVITY WALL CONSTRUCTION Cavity wall construction to be executed in the following areas, as per drawings: Production building, technical/ energy building. The cavity wall construction for the exterior walls has to be executed in aluminum-trapezoidal sheet metal, thickness= 1mm. The wave profile dimensions can be requested via the Project Management and measured on a sample sheet metal during clarification meeting. Brand/ product for Aluminum Panels/ Boards/ Metal Sheeting: (please refer to Technical Schedule-Architecture for further details): Corus or Thyssen Krupp Brand/ product for Mechanical screws, anchors and curtain wall fixation: (please refer to Technical Schedule-Architecture for further details): Fischer Insulation material to be executed as: pressed panels, thickness = according to heat-insulation-calculation, but has to fulfill minimum thermal resistance of 0.40, meaning = minimum thickness 14cm, rigid material, with moisture proof layer. Brand/ product for Insulation material: (please refer to Technical Schedule-Architecture for further details): Rockwool (Roxul) Insulation material to be screwed on to distance-profiles, including all fittings, weather groove/ plate with lug pattern/ window drip, corner angle-metal sheets/ corner-surrounding metal-sheets, window- and door-corner metal-sheets. All corner sheeting has to be without butt joints. The aluminum-trapezoidal sheet metal has to have a finished top-coating, color: RAL 1002 – sand yellow. PVDF coated (thickness =min 45 μm). All visible elements with PVDF coating. The external sun-louvers have to be considered when mounting the external façade panels. The internal horizontal steel panels to be continuously galvanized on both sides, thickness= 1mm, including a PVDF plastic-coating RAL 9002 (thickness =min 25 μm), mounted on continuously galvanized Z-shaped distance-profiles of a minimum thickness= 1,25mm, including a vapor-permeable foil layer which has to be applied over the total insulation area. Façade panels to be executed as cross joints (overlapping), the building corners to be executed positive. |
» 猜你喜欢
拟解决的关键科学问题还要不要写
已经有8人回复
求推荐博导
已经有4人回复
为什么nbs上溴 没有产物点出现呢
已经有5人回复
存款400万可以在学校里躺平吗
已经有34人回复
求助一下有机合成大神
已经有4人回复
最失望的一年
已经有16人回复
求推荐英文EI期刊
已经有5人回复
26申博
已经有3人回复
基金委咋了?2026年的指南还没有出来?
已经有10人回复
疑惑?
已经有5人回复
zeng-haochen
至尊木虫 (知名作家)
- 应助: 33 (小学生)
- 贵宾: 0.095
- 金币: 24448.4
- 散金: 6000
- 红花: 12
- 帖子: 5955
- 在线: 308.2小时
- 虫号: 288084
- 注册: 2006-10-21
- 性别: GG
- 专业: 高分子合成化学
2楼2007-06-30 15:04:23
guojinming
金虫 (正式写手)
- 应助: 1 (幼儿园)
- 金币: 971.7
- 散金: 130
- 红花: 3
- 帖子: 467
- 在线: 136.8小时
- 虫号: 48426
- 注册: 2004-06-19
- 性别: GG
- 专业: 有机高分子材料
3楼2007-06-30 15:15:23
trixaypm
木虫 (职业作家)
枯藤老树昏虫兼小木虫清洁工
- 应助: 0 (幼儿园)
- 贵宾: 0.02
- 金币: 4160.2
- 红花: 3
- 帖子: 3522
- 在线: 14.2小时
- 虫号: 238318
- 注册: 2006-04-05
- 性别: GG
- 专业: 高分子物理与高分子物理化
4楼2007-06-30 15:19:13













回复此楼