[½»Á÷] ÇóÖú»¯¹¤É豸˵Ã÷Ê麺ÒëӢһƪ

Ò».¹¤×÷Ô­Àí
Ë«½°Ò¶¸ÉÔï»úÖ÷ÒªÓÉ´«¶¯»ú¹¹¡¢ÏäÌå¡¢Ö÷Öá½Á°è¡¢Öá³ÐÌå¡¢³öÁϵ÷½Ú»ú¹¹¡¢Ðýת½ÓÍ·µÈ²¿¼þ×é³É¡£
¶¯Á¦´«Ê䲿·Ö£ºÖ÷ÒªÓɵ綯»ú¡¢¼õËÙ»ú¡¢ Ö÷¶¯³ÝÂÖ ¡¢´Ó¶¯³ÝÂÖ ¡¢Öá¼ä³ÝÂÖµÈ×é³É¡£ËüµÄÖ÷Òª×÷ÓÃÊǰѵç»úµÄ¶¯Á¦´«Ê䏸Ö÷Öá½Á°è²¿·Ö,ʹÆäÔڶתËÙ·¶Î§ÄÚÔËת,Ò²¿É¸ù¾ÝÓû§ÒªÇóÑ¡ÓÃ±äÆµµ÷ËÙ»òµç´Åµ÷ËÙÅäÖýøÐбäËÙÔËÐС£
Ö÷Öá½Á°è²¿·Ö£ºÖ÷ÒªÓÉÁ½¸ù¿ÕÐÄÖáºÍÆä±íÃæÈô¸É¸öШÐοÕÐĽ°Ò¶µÈ×é³É¡£¿ÕÐÄÖáÄÚÉèÖô«ÈÈ(¼ÓÈÈ»òÀäÈ´)½éÖÊ(ÕôÆû¡¢Ë®¡¢Ó͵È)»ØÁ÷¹Ü£¬Á½¶Ë»òµ¥¶ËÅäÖõÄÐýת½ÓÍ·ÊÇÕâЩ½éÖʽø³öµÄ½Ó¿Ú¡£ÔËÐÐʱÖ÷Öá½Á°è²¿·Ö¶ÔÎïÁϽÁ°è¡¢ÍƼ·²¢½øÐмÓÈÈ»òÀäÈ´¡£
Öá³ÐÌ岿·Ö£ºÔÚÖ÷ÖáµÄÁ½¶Ë,¹²ÅäÖÃÁËÈý¸ö»òÁ½¸öÖá³ÐÌ壬ÓÉÖá³Ð¡¢Öá³Ð×ù¡¢Öá³Ð¸Ç¡¢ÃÜ·âÌîÁÏ¡¢ÌîÁÏѹ¸Ç¡¢¼ìÐ޸ǵÈ×é³É¡£¶¯Á¦¶ËÅäÖÃÁËÖ÷¸¨Á½¸öÖá³ÐÌ壬Ö÷Öá³ÐÌåÊÇÖ÷ÖáÖ÷ÒªÖ§³ÅµãÇÒ×÷ΪÖáÏòÒÆ¶¯µÄ¶¨Î»µã£¬¸¨ÖúÖá³ÐÌåÊÇΪ×èÖ¹ÖáÍ·¹ý´ó±äÐζøÉèÖõġ£·Ç¶¯Á¦¶ËÖá³ÐÌå³ýÌṩÖ÷ÖáµÄ³ÐÁ¦µãÍ⣬Ö÷Öá¿ÉÒÔ×ÔÓÉÉìËõ¡£¸÷Öá³ÐÌå¾ùÉèÖÃÁËÖá³ÐµÄÀäÈ´½á¹¹¡£
³öÁϵ÷½Ú»ú¹¹Ö÷ÒªÓɵ÷½Ú°å¡¢×ªÖá¡¢¶¨Î»¼þµÈ×é³É¡£
¶þ.°²×°µ÷ÊÔ
°²×°Ç°Ó¦Ïȼì²é¸÷²¿¼þÊÇ·ñÍêºÃÎÞËð,²¢ÇåÀí¸É¾»ÄÚ²¿¡£
°²×°¾Íλºóµ÷ÊÔǰӦ¼ì²éÖá³Ð×ùÄÚÊÇ·ñÒÑ×¢ÈëÈó»¬Ö¬£¬·ñÔòÓ¦¼Ó×¢ÊÊÁ¿Èó»¬Ö¬,Ò»°ãÑ¡ÓÃ2ºÅ¶þÁò»¯î⸴ºÏ¸Æ»ùÖ¬»òÆäËüÄ͸ßεÈÊÊÓÃÈó»¬Ö¬¡£
°²×°Ðýת½Óͷǰ£¬ÒªÈÏÕæÔĶÁÐýת½ÓÍ·¡¶Ê¹ÓÃ˵Ã÷Êé¡·£¬ÕýÈ·°²×°£¬ÒÔ·ÀÖ¹ÃÜ·âµæµÄË𻵡£
¼ÓÈÈ»òÀäÈ´½éÖÊÈë¿Ú¹Ü·ÉÏÐè¼ÓװѹÁ¦±í¼°ÎÈѹװÖá£Èë¿Úǰ±ØÐë°²×°°²È«·§£¬·ÀÖ¹É豸³¬Ñ¹¹¤×÷¡£¼ÓÈȽéÖÊζȲ»µÃ³¬¹ý¶î¶¨Ê¹ÓÃζȡ£
¶ÔÖá¶Ë²¿µ¥¶ËÅäÖõÄÐýת½ÓÍ·ÔÚ°²×°Ê±Ó¦×¢Òâ,ÉìÈëÆäÄÚÇ»µÄ½Ó¹Ü¶Ë²¿200ºÁÃ×ÄڵıíÃæÓ¦¹â»¬ÎÞ¿×,ÎÞÐâÎÞÔüÎÞ°Ì,ÄÜ´ïµ½¶Ô¼ÓÈÈ(»òÀäÈ´)½éÖʵÄÃÜ·âÒªÇó,ÇҳߴçºÏÊÊ¡£Í¬Ë«¶Ë°²×°Ðýת½ÓÍ·Ò»Ñù,Ðë¾­ÊÔѹ²»Â©ºó·½¿É½øÐÐÕû»úµ÷ÊÔ¡£
¶Ô³ÝÂÖ´«¶¯»òÁ´´«¶¯½øÐмì²éºÍµ÷ÊÔ,ʹÆä·ûºÏ»úе´«¶¯ÒªÇó¡£
¶Ôµç¶¯»úºÍµçÆ÷½øÐа²È«¼ì²é¡£µã´¥µç»úµçÔ´¿ª¹Ø,µç»ú¼°´«¶¯¼þ¾ùÓ¦ÎÞ¿¨×èÏÖÏó,²¢È·¶¨Ö÷ÖáµÄתÏòÕýÈ·(½°Ò¶×ª¶¯Ê±Ó¦¼âÍ·³¯Ç°)¡£
Æô¶¯µç»ú,ʹÉ豸¿ÕÔØÔËת,ÔËתӦƽÎÈ,²»µÃ³öÏÖ²»Õý³£µÄÔëÉù¡£¶ÔÓÚ´øµ÷ËÙ×°ÖõÄÓ¦Ôڿɵ÷½Ú·¶Î§ÄÚ½øÐе÷ËÙ,¼ÓËÙʱӦ»ºÂý½øÐÐÒÔ¼ì²éµ÷ËÙÌØÐÔÊÇ·ñ·ûºÏÒªÇ󡣿ÕÔØÔËת²»µÃÉÙÓÚ30·ÖÖÓ¡£
Öð½¥¼ÓÈÈ»òÀäÈ´£¬¹Û²ìÔËתÇé¿ö£¬Ê¹ÈÈÔ´»òÀäÔ´´ïµ½Ê¹ÓòÎÊý¡£´øÀäÈ´±£»¤×°ÖõÄÉ豸±ØÐëÔÚͨÕôÆûǰ´ò¿ªÀäÈ´Ë®·§ÃÅ¡£
Öð½¥¼ÓÈëÎïÁÏ,¹Û²ìºÍ¼ì²éÎïÁϵĸÉÔïÇé¿ö,²¢²»¶Ï¸ù¾ÝÐèÒª¶Ô¼ÓÁÏÁ¿¡¢ÈÈ(Àä)Ô´Á¿¡¢³öÁÏÁ¿¼°×ªËÙ½øÐе÷Õû,´ïµ½Éè¼ÆÒªÇóºó¼´¿ÉͶÈëÕý³£ÔËת¡£
Èý.ÔËתÖеIJÙ×÷×¢ÒâÊÂÏî
×¢Òâ¹Û²ìµçÁ÷ÊÇ·ñÔÚµç»ú¶î¶¨ÖµÄÚ,·ñÔòÓ¦Á¢¼´ÕÒ³öÔ­Òò²¢ÓèÒÔ½â¾ö¡£
¶Ô²»Í¬µÄÎïÁÏ,ӦעÒâ¿ØÖÆ½øÁÏËÙ¶È,ÒÔÈ·±£ÔËÐÐÆ½ÎÈ,ÓÈÆäÊDz»¿ÉÇ¿ÖÆ´ó´óÁ¿¼ÓÈëÎïÁÏ¡£
ÎïÁÏ×°ÌîÁ¿¼´³öÁÏÁÏλ¸ß¶È¿ÉÀûÓóöÁϵ÷½Ú»ú¹¹½øÐе÷½Ú¡£µ÷ºÃºó£¬Ò»°ã²»µÃËæÒâ±ä¶¯Î»Öá£
×¢ÒâÖá³ÐÌåµÄζȲ»¿É¸ßÓÚ70ºC,Ó¦ÊÊʱ¼Ó×¢¸ßÖÊÁ¿Èó»¬Ö¬¡£¼°Ê±µ÷ÕûÖá³ÐÌåºÍÖá·âÌîÁÏ´¦ÀäÈ´×°ÖõÄÀäÈ´Ë®Á¿¡£
´ò¿ªÖá³ÐÌåÉϵÄÊӿ׸Ç,¹Û²ì¸÷´¦ÃÜ·âÊÇ·ñÓÐй©¡£ÌîÁÏÃÜ·â´¦ÈçÓÐй©¿Éѹ½ôÌîÁÏѹ¸Ç»ò¸ü»»ÌîÁÏ¡£
³ÝÂÖÄöºÏ²¿Î»Ó¦¼°Ê±Í¿Ä¨Èó»¬Ö¬,²¢×¢Òâ·À³¾ºÍ¼Ó¸Ç·À³¾ÕÖ¡£
²»ÔÊÐí³¬Ñ¹»ò³¬¸ººÉÔËÐС£
É豸Ê×´ÎʹÓÃÒ»Öܺ󣬽«¼õËÙ»úÄÚÈó»¬Óͷž¡£¬ÖØÐ¸ü»»Í¬ÐͺÅÐÂÓÍ¡£
Í£»úʱҪ½«»úÄÚÎïÁÏÇåÀí¸É¾»¡£
±±·½µØÇø¶¬¼¾Í£³µÊ±£¬Ðè·Å¾»»úÄÚ´æË®¡£

» ²ÂÄãϲ»¶

ÎÞ±¾Ö®Ä¾
ÒÑÔÄ   ¹Ø×¢TA ¸øTA·¢ÏûÏ¢ ËÍTAºì»¨ TAµÄ»ØÌû

sytu_wyh

Í­³æ (СÓÐÃûÆø)

¡ï
telomerase(½ð±Ò-1,VIP+0):¾¯¸æ£¡£¡£¡ 6-12 11:24
1. The working principle
Dryer leaves sculls by transmission, tank, stirring spindle, bearing body, a material adjustment body components such as rotary joints.
Power transmission parts: the main by the motor, reducer, gear, driven gear, shaft between the gear and so on. Its main role is to electric power transmission to the main axis of the mixing part of its rated speed range of operation can also be selected according to user requirements or electromagnetic VVVF speed governor running configuration.
Mixing spindle parts: the main by two hollow shaft and a number of its surface composed of wedge-shaped hollow blades. Heat transfer inside the hollow shaft set (heating or cooling) medium (steam, water, oil, etc.) back to tubes, or single-ended configuration at both ends of the rotary joint is the interface into and out of these media. Mixing part of the spindle run-time mixing of materials, pushing and heating or cooling.
Bearing body parts: the two ends of the spindle, a total allocation of three or two bearing body by bearings, bearing blocks, bearing caps, sealing packing, gland packing, maintenance, etc. covered. The main driving force for secondary-side configuration two bearing body, the main bearing body is mainly supported by the main axis and axial movement as the anchor, auxiliary bearing body axis in order to prevent excessive deformation of the first set up. Body-side bearings of non-power addition to the main axis of the load-bearing points, the spindle can freely scalable. Body of the bearings are set up bearing cooling structure.
Adjust the material mainly by the regulation board, shaft, positioning component parts.
II. Installation
Before installation to check whether the parts intact, and clean up the internal.
In place before commissioning the installation should be checked after the bearing has been injected with grease, or grease should be added amount, generally on the 2nd choice of composite molybdenum disulfide or other calcium-based resin, such as the application of high temperature grease.
Before the installation of rotary joints, rotary joints should carefully read the "Manual", the correct installation to prevent damage to gasket.
Heating or cooling medium tubes on the road entrance to the installation of pressure gauges and regulators to be installed. Safety valve must be installed before the entrance to prevent over-pressure of work equipment. Heating medium temperature should not exceed the rated temperature.
Department of the shaft end single-ended configuration of the rotary joint in the installation should pay attention to, into the cavity of the end to take over 200 millimeters of the surface should be smooth and non-porous, non-rust-free residue no scar can be reached on the heating (or cooling) sealing medium, and also the right size. Double-end with the installation of rotary joints as not subject to pressure test for leakage before testing machine.
Of gear drive or chain drive to carry out inspection and testing to meet the requirements of mechanical transmission.
On the motor and electrical safety checks. Point of electric shock machine power switch, electrical and transmission pieces of card should be no resistance phenomenon and to determine the correct steering spindle (rotating blades should be pointed forward).
Start motor, so that no-load operation of equipment, operation should be smooth not unusual noise. Speed control device for the belt should be carried out within the framework adjustable speed, speed up should be slow to carry out to check whether it meets the requirements governing characteristic. No-load operation shall not be less than 30 minutes.
The gradual heating or cooling, to observe the functioning of, so that the source of heat or cold to achieve the use of parameters. Protection device with the cooling equipment must pass before the steam valve to open the cooling water.
Gradually adding materials, observation and inspection of the dry materials, and will need to increase the basis of charge, thermal (cold) the source of the amount of the charge and the speed adjusted to meet the design requirements into the normal operation immediately after.
III. Running in the operation of Note
To observe whether the electrical current within the rating, or else find out the reasons and shall immediately be resolved.
Of different materials, care should be taken to control the feed rate, in order to ensure smooth operation, in particular, is not mandatory to join a large number of materials.
The volume of material that is filled with the expected high level of material can be used to regulate body conditioning. After transfer, are not free to change the general location.
Note Bearing temperature should not exceed 70 º C, high-quality grease should be added in due course. Timely adjustments to bearing and seal packing plant cooling water cooling.
Open bearings, as the body of the manhole covers, to observe whether there is any leakage around seal. Department if there is leakage of packing seal can be pressed or replacement of gland packing filler.
Gear meshing parts of grease should be applied in time, and pay attention to dust and dust cover stamping.
Does not allow excess pressure or overload operation.
Equipment used for the first time a week will put reducer to do with the oil, replace oil with new models.
Downtime when the machine to clean up materials.
Parking northern winter, the need to release water net machine memory.
2Â¥2009-06-04 16:18:33
ÒÑÔÄ   ¹Ø×¢TA ¸øTA·¢ÏûÏ¢ ËÍTAºì»¨ TAµÄ»ØÌû

renhongwei

Òø³æ (ÕýʽдÊÖ)

²»ÒªÔÚÏß·­ÒëµÄ°¡
ÎÞ±¾Ö®Ä¾
3Â¥2009-06-06 11:26:56
ÒÑÔÄ   ¹Ø×¢TA ¸øTA·¢ÏûÏ¢ ËÍTAºì»¨ TAµÄ»ØÌû

jichongcml

½ð³æ (СÓÐÃûÆø)

¡ï
telomerase(½ð±Ò-1,VIP+0):¾¯¸æ£¡£¡£¡ 6-12 11:24
1. The working principle
Dryer leaves sculls by transmission, tank, stirring spindle, bearing body, a material adjustment body components such as rotary joints.
Power transmission parts: the main by the motor, reducer, gear, driven gear, shaft between the gear and so on. Its main role is to electric power transmission to the main axis of the mixing part of its rated speed range of operation can also be selected according to user requirements or electromagnetic VVVF speed governor running configuration.
Mixing spindle parts: the main by two hollow shaft and a number of its surface composed of wedge-shaped hollow blades. Heat transfer inside the hollow shaft set (heating or cooling) medium (steam, water, oil, etc.) back to tubes, or single-ended configuration at both ends of the rotary joint is the interface into and out of these media. Mixing part of the spindle run-time mixing of materials, pushing and heating or cooling.
Bearing body parts: the two ends of the spindle, a total allocation of three or two bearing body by bearings, bearing blocks, bearing caps, sealing packing, gland packing, maintenance, etc. covered. The main driving force for secondary-side configuration two bearing body, the main bearing body is mainly supported by the main axis and axial movement as the anchor, auxiliary bearing body axis in order to prevent excessive deformation of the first set up. Body-side bearings of non-power addition to the main axis of the load-bearing points, the spindle can freely scalable. Body of the bearings are set up bearing cooling structure.
Adjust the material mainly by the regulation board, shaft, positioning component parts.
II. Installation
Before installation to check whether the parts intact, and clean up the internal.
In place before commissioning the installation should be checked after the bearing has been injected with grease, or grease should be added amount, generally on the 2nd choice of composite molybdenum disulfide or other calcium-based resin, such as the application of high temperature grease.
Before the installation of rotary joints, rotary joints should carefully read the "Manual", the correct installation to prevent damage to gasket.
Heating or cooling medium tubes on the road entrance to the installation of pressure gauges and regulators to be installed. Safety valve must be installed before the entrance to prevent over-pressure of work equipment. Heating medium temperature should not exceed the rated temperature.
Department of the shaft end single-ended configuration of the rotary joint in the installation should pay attention to, into the cavity of the end to take over 200 millimeters of the surface should be smooth and non-porous, non-rust-free residue no scar can be reached on the heating (or cooling) sealing medium, and also the right size. Double-end with the installation of rotary joints as not subject to pressure test for leakage before testing machine.
Of gear drive or chain drive to carry out inspection and testing to meet the requirements of mechanical transmission.
On the motor and electrical safety checks. Point of electric shock machine power switch, electrical and transmission pieces of card should be no resistance phenomenon and to determine the correct steering spindle (rotating blades should be pointed forward).
Start motor, so that no-load operation of equipment, operation should be smooth not unusual noise. Speed control device for the belt should be carried out within the framework adjustable speed, speed up should be slow to carry out to check whether it meets the requirements governing characteristic. No-load operation shall not be less than 30 minutes.
The gradual heating or cooling, to observe the functioning of, so that the source of heat or cold to achieve the use of parameters. Protection device with the cooling equipment must pass before the steam valve to open the cooling water.
Gradually adding materials, observation and inspection of the dry materials, and will need to increase the basis of charge, thermal (cold) the source of the amount of the charge and the speed adjusted to meet the design requirements into the normal operation immediately after.
III. Running in the operation of Note
To observe whether the electrical current within the rating, or else find out the reasons and shall immediately be resolved.
Of different materials, care should be taken to control the feed rate, in order to ensure smooth operation, in particular, is not mandatory to join a large number of materials.
The volume of material that is filled with the expected high level of material can be used to regulate body conditioning. After transfer, are not free to change the general location.
Note Bearing temperature should not exceed 70 º C, high-quality grease should be added in due course. Timely adjustments to bearing and seal packing plant cooling water cooling.
Open bearings, as the body of the manhole covers, to observe whether there is any leakage around seal. Department if there is leakage of packing seal can be pressed or replacement of gland packing filler.
Gear meshing parts of grease should be applied in time, and pay attention to dust and dust cover stamping.
Does not allow excess pressure or overload operation.
Equipment used for the first time a week will put reducer to do with the oil, replace oil with new models.
Downtime when the machine to clean up materials.
Parking northern winter, the need to release water net machine memory.
4Â¥2009-06-06 15:43:12
ÒÑÔÄ   ¹Ø×¢TA ¸øTA·¢ÏûÏ¢ ËÍTAºì»¨ TAµÄ»ØÌû

renhongwei

Òø³æ (ÕýʽдÊÖ)

»¹ÊÇÔÚÏߵİ¡£¬
ÎÞ±¾Ö®Ä¾
5Â¥2009-06-12 08:25:14
ÒÑÔÄ   ¹Ø×¢TA ¸øTA·¢ÏûÏ¢ ËÍTAºì»¨ TAµÄ»ØÌû

monitor2885

ÖÁ×ðľ³æ (Ö°Òµ×÷¼Ò)

¶Ó³¤

Õâô¶à£¬¹À¼ÆÃ»Óм¸¸öÈËÄÜ»¨Ê±¼ä×Ô¼º·­Òë
Retirement
6Â¥2009-06-12 09:53:20
ÒÑÔÄ   ¹Ø×¢TA ¸øTA·¢ÏûÏ¢ ËÍTAºì»¨ TAµÄ»ØÌû

renhongwei

Òø³æ (ÕýʽдÊÖ)

Êǰ¡£¬ÊÇÓеã¶àÁË£¬º¹£¬»¹ÊÇ×Ô¼ºÂýÂý·­°É£¬·ÅÆúÇóÖú°¡£¬°æÖ÷°ïÎÒ¸ÄÒ»ÏÂÌâÄ¿°¡£¬ÎÒ×Ô¼º¸Ä²»ÁËÁË
ÎÞ±¾Ö®Ä¾
7Â¥2009-06-12 10:35:50
ÒÑÔÄ   ¹Ø×¢TA ¸øTA·¢ÏûÏ¢ ËÍTAºì»¨ TAµÄ»ØÌû

pingyamin

Í­³æ (ÕýʽдÊÖ)

¡ï ¡ï ¡ï ¡ï ¡ï ¡ï
qingfeng877680(½ð±Ò+6,VIP+0):MM·­ÒëÐÁ¿àÁË£¡ 7-11 15:09
1. The working principle
Scull dryer is composed of drive mechanism, tank, stirring spindle, bearing body, material regulation ,rotary joints etc.
Power transmission parts is made up of motor, reducer, gear, driven gear, Inter-axis gear and so on. Its main role is to transmit electric power to the stirring part of main axis ,so that it can work  in the rated speed . it can also run by Frequency Control or operate for variable speed according to user¡¯s requirements.
Mixing spindle parts: mainly by two hollow shaft and a number of wedge-shaped hollow blades on the surface . there is Heat(heating or cooling) transfer medium (steam, water, oil, etc.) return-line inside the hollow shaft, rotary joints at one end or at both ends is the interface of the media. the materials is mixed ,pushed  and heated or cooled by mixing part of the spindle.
Bearing body parts: there are three or two bearing body at the two ends of the spindle, composite from bearings, bearing blocks, bearing caps, sealing packing, gland packing, maintenance, etc. two bearing body is for the main driving force, the main bearing body is the main strong point of the main axis and the anchoring point of axial movement, auxiliary bearing body is set for preventing excessive deformation of shaft head. Body-side bearings of the non-power bearing body can freely scalable besides providing the load-bearing points of the main axis. There are cooling structure for all the bearing body.
Material regulation is made mainly by the regulation board, shaft, positioning component parts.
II. Installation and Debugging
check whether the parts are intact before installation , and clean up the internal.
After installation and before debugging Check if the bearing block has been injected with grease, or grease should be added, generally we choose 2# composite molybdenum disulfide calcium-based resin or other heat-resistance resin .
Before the installation of rotary joints, read ¡°rotary joints instruction¡± carefully, install the rotary joints correctly to prevent damage to gasket.
Pressure gauges and regulators should be installed on the entrance of heating or cooling medium tubes. Safety valve must be installed before the entrance to prevent over-pressure work of the equipment. Heating medium temperature should not exceed the rated temperature.
Ì«¶àÁË ·­ÒëÁËÒ»°ë
Ȱ¾ýĪϧ½ðÂÆÒ£¬È°¾ýϧȡÉÙÄêʱ¡£ »¨¿ª¿°ÕÛÖ±ÐëÕÛ£¬Äª´ýÎÞ»¨¿ÕÕÛÖ¦¡£
8Â¥2009-06-12 11:13:54
ÒÑÔÄ   ¹Ø×¢TA ¸øTA·¢ÏûÏ¢ ËÍTAºì»¨ TAµÄ»ØÌû
Ïà¹Ø°æ¿éÌø×ª ÎÒÒª¶©ÔÄÂ¥Ö÷ renhongwei µÄÖ÷Ìâ¸üÐÂ
×î¾ßÈËÆøÈÈÌûÍÆ¼ö [²é¿´È«²¿] ×÷Õß »Ø/¿´ ×îºó·¢±í
[¿¼ÑÐ] ²ÄÁϵ÷¼Á +14 Ò¼·¡·¡ÒÚ 2026-04-04 14/700 2026-04-05 23:31 by À´¿´Á÷ÐÇÓê10
[¿¼ÑÐ] Ò»Ö¾Ô¸±±½»´ó²ÄÁϹ¤³Ì×Ü·Ö358Çóµ÷¼Á +4 cs0106 2026-04-05 4/200 2026-04-05 22:49 by lbsjt
[¿¼ÑÐ] »¯Ñ§0703-Ò»Ö¾Ô¸211-338·ÖÇóµ÷¼Á +7 vants 2026-04-05 7/350 2026-04-05 18:17 by cql1109
[¿¼ÑÐ] 313Çóµ÷¼Á +5 º£ÈÕº£ÈÕ 2026-04-04 7/350 2026-04-05 13:58 by imissbao
[¿¼ÑÐ] 271·ÖÇóµ÷¼ÁѧУ +12 zph158488£¡ 2026-04-02 13/650 2026-04-05 10:13 by lqwchd
[¿¼ÑÐ] 368Çóµ÷¼Á +5 ½ñ»ªÏ° 2026-04-03 7/350 2026-04-04 18:47 by imissbao
[¿¼ÑÐ] 363Çóµ÷¼Á +7 zh096 2026-04-04 7/350 2026-04-04 17:13 by dongzh2009
[¿¼ÑÐ] Ò»Ö¾Ô¸±±¾©¿Æ¼¼´óѧ²ÄÁϹ¤³Ì085601£¬Çóµ÷¼Á +17 cdyw 2026-04-02 18/900 2026-04-04 11:14 by w_xuqing
[¿¼ÑÐ] ×Ü·Ö328ÉúÎïÓëÒ½Ò©¿¼ÊýѧÇóµ÷¼Á +7 aaadim 2026-04-02 9/450 2026-04-03 22:53 by syh9288
[¿¼ÑÐ] 085601Ò»Ö¾Ô¸±±Àí325·ÖÇóµ÷¼Á +6 ÕÒµ÷¼Á£¬£¬ 2026-04-02 6/300 2026-04-03 22:20 by –¹Æ?
[¿¼ÑÐ] Çóµ÷¼Á»ú»á +5 ÒâȾivy 2026-04-03 5/250 2026-04-03 15:13 by qoooooo614
[¿¼ÑÐ] ÉúÎïѧÇóµ÷¼Á +3 15064154688 2026-04-03 3/150 2026-04-03 10:28 by macy2011
[¿¼ÑÐ] ±§Ç¸ +5 ÌïºéÓÐ 2026-03-30 5/250 2026-04-03 10:24 by linyelide
[¿¼ÑÐ] Ò»Ö¾Ô¸ÏÃÃÅ´óѧ²ÄÁϹ¤³Ìר˶354ÕÒµ÷¼Á£¡£¡£¡ +8 ±´ß±µ±µ 2026-03-30 8/400 2026-04-03 09:41 by hypershenger
[¿¼ÑÐ] 279Çóµ÷¼Á +5 ¸µÎÄÇï 2026-04-02 5/250 2026-04-02 18:10 by ±ÊÂä½õÖÝ
[¿¼ÑÐ] 085900ÍÁľˮÀû336·ÖÇóµ÷¼Á +4 Zhangjiangj 2026-03-31 6/300 2026-04-02 11:40 by 1753564080
[¿¼ÑÐ] ÉúÎïѧ327£¬Çóµ÷¼Á +5 ÊéÉϵÄ÷×Ó 2026-04-01 6/300 2026-04-02 06:47 by ilovexiaobin
[¿¼ÑÐ] 286Çóµ÷¼Á +5 Sa67890. 2026-04-01 7/350 2026-04-01 19:50 by 6781022
[¿¼ÑÐ] Ò»Ö¾Ô¸±±½»²ÄÁϹ¤³Ì×Ü·Ö358 +5 cs0106 2026-04-01 7/350 2026-04-01 11:45 by wangjy2002
[¿¼ÑÐ] 318Çóµ÷¼Á +8 ÆßÒä77 2026-04-01 8/400 2026-04-01 10:37 by Jaylen.
ÐÅÏ¢Ìáʾ
ÇëÌî´¦ÀíÒâ¼û