24小时热门版块排行榜    

查看: 268  |  回复: 2
本帖产生 1 个 ,点击这里进行查看

aswanwang

新虫 (初入文坛)

[求助] 帮忙查下《单线铁路隧道水平岩层施工技术》是否被EI收录?新手出道,不甚感激

麻烦各位,帮忙看看《单线铁路隧道水平岩层施工技术》,现代隧道技术,2014(6),是否被EI收录,收录编号是多少?新手出道,不甚感激
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

baiyuefei

版主 (文学泰斗)

风雪

优秀版主优秀版主优秀版主文献杰出贡献优秀版主优秀版主优秀版主文献杰出贡献优秀版主优秀版主优秀版主优秀版主文献杰出贡献优秀版主优秀版主优秀版主优秀版主优秀版主优秀版主

【答案】应助回帖

★ ★ ★ ★ ★
感谢参与,应助指数 +1
aswanwang(lazy锦溪代发): 金币+5, 协助结帖,感谢应助! 2015-12-16 08:40:14
lazy锦溪: LS-EPI+1, 感谢应助! 2015-12-16 08:40:19
Accession number:


20151200672607






Title:

Construction techniques for a single-track railway tunnel in a horizontal stratum






Authors:

Chen, Wang1





Author affiliation:

1China Railway Tunnel Group Erchu Co. Ltd., Yanjiao, China






Corresponding author:

Chen, Wang






Source title:

Modern Tunnelling Technology






Abbreviated source title:

Mod. Tunn. Technol.






Volume:

51






Issue:

6






Issue date:

December 1, 2014






Publication year:

2014






Pages:

142-147






Language:

Chinese






ISSN:

10096582






Document type:

Journal article (JA)






Publisher:

Editorial By Modern Tunnelling Technology, China






Abstract:

In the South Luliangshan tunnel, the surrounding rock at the entrance of the #2 inclined shaft is mainly composed of horizontally layered mudstone, marlstone, and limestone with developed bedding and joint fissures, which are inclined to result in rock falls, chipping, and rock collapse at the arch after blasting, causing difficulties in terms of rapid excavation, cost control, and safety risks. In this paper, considering the excavation method, advance reinforcement, controlled blasting, primary support, monitoring, and measurement, major construction methods, measures, and techniques are presented for the single-track railway tunnel in horizontal stratum, such as the short bench method, advance condulet grouting, slight controlled blasting, hollow grouting anchor support for the arch, geological advance prediction, and strengthened construction monitoring. ©, 2014, Editorial Office of "Modern Tunnelling Technology". All right reserved.






Number of references:

6






Main heading:

Railroad tunnels






Controlled terms:

Arches - Blasting - Concrete construction - Excavation - Grouting - Mortar - Railroad transportation - Railroads - Reinforcement - Rock bursts - Transportation - Tunnels






Uncontrolled terms:

Construction method - Construction monitoring - Construction technique - Controlled blasting - Excavation methods - Horizontal stratum - Rapid construction - Single track railway






Classification code:

401.1 Bridges - 401.2 Tunnels and Tunneling - 405 Construction Equipment and Methods; Surveying - 405.2 Construction Methods - 412 Concrete - 414.3 Mortar (Before 1993, use code 412) - 415 Metals, Plastics, Wood and Other Structural Materials - 431 Air Transportation - 432 Highway Transportation - 433 Railroad Transportation - 433.1 Railroad Transportation, General - 434 Waterway Transportation - 502.1 Mine and Quarry Operations - 951 Materials Science





DOI:

10.13807/j.cnki.mtt.2014.06.023






Database:

Compendex






Compilation and indexing terms, © 2015 Elsevier Inc.



Full-text and Local Holdings Links








Tools in Scopus


Cited by: This article has been cited 1 time in Scopus since 1996.


Liu, Q.; Tan, Z.; Cheng, L.; Zou, X.

Field tests regaring the uncertainty of the calculation model for soil filling pressure on open-cut tunnels

(2015) Modern Tunnelling Technology


--------------------------------------------------------------------------------



Author details: View Author Details in Scopus.

Chen, W.

Learn more about Scopus



Add a tag  

Add a tag scopePublicPrivateMy InstitutionLogin for groups



Add a tag text box





--------------------------------------------------------------------------------















--------------------------------------------------------------------------------
2楼2015-12-06 18:11:48
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

baiyuefei

版主 (文学泰斗)

风雪

优秀版主优秀版主优秀版主文献杰出贡献优秀版主优秀版主优秀版主文献杰出贡献优秀版主优秀版主优秀版主优秀版主文献杰出贡献优秀版主优秀版主优秀版主优秀版主优秀版主优秀版主

【答案】应助回帖

Accession number:


20151200672607
3楼2015-12-06 18:12:04
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
相关版块跳转 我要订阅楼主 aswanwang 的主题更新
信息提示
请填处理意见