| 查看: 135 | 回复: 0 | |||
| 当前主题已经存档。 | |||
[交流]
帮忙翻译一下
|
|||
| The overall approach is based upon the “Life Cycle”or”V Model” for commissioning and qualification.The intent is to focus on the user requirements and up-front preliminary engineering so that the corresponding critical attributes of the equipment and system are defined.These attributes will be the basis for the testing procedures and respective acceptance criteria used in the commissioning and qualification activities.As part of this early engineering planning phase equipmnt and system provider activities,reviewed with the intent of”leveraging”the system providers, knowledge of the equipment/system,their quality practices in the design and build of the system, their support of FAT activities ,their installation and start-up expertise,their support of commissioning and SAT activities,and their qualification support.A number of the these activities will be monitored,reviewed,witnessed,and documented with the intent of reducing redundant testing during qualification. In addition,this will provide for a higher level of assurance that the equipment andsystems have been developed,built,installed and operate in accordance with pre-defined requirements. |
» 猜你喜欢
求助求助
已经有0人回复
农业资源与环境、智慧农业专业本科生毕业论文课题选题求助
已经有1人回复
药理学论文润色/翻译怎么收费?
已经有129人回复
人工智能赋能聚合物及复合材料模型应用与实践
已经有0人回复
各国和国际组织现行药典注射用水质量标准
已经有0人回复
求助用微谱数据库查询
已经有0人回复
计算化学与人工智能驱动的MOFs性能预测与筛选技术
已经有0人回复
研三实验求指导
已经有0人回复
金属材料多尺度计算模拟技术与应用:微观机理到宏观性能的集成工作
已经有0人回复
江西科技师范大学微生物天然药物老师介绍
已经有23人回复
【招聘】清北(济南)生物科技招聘AI制药研发计算人才
已经有6人回复















回复此楼