帮忙翻译一下
|
|||
| The overall approach is based upon the “Life Cycle”or”V Model” for commissioning and qualification.The intent is to focus on the user requirements and up-front preliminary engineering so that the corresponding critical attributes of the equipment and system are defined.These attributes will be the basis for the testing procedures and respective acceptance criteria used in the commissioning and qualification activities.As part of this early engineering planning phase equipmnt and system provider activities,reviewed with the intent of”leveraging”the system providers, knowledge of the equipment/system,their quality practices in the design and build of the system, their support of FAT activities ,their installation and start-up expertise,their support of commissioning and SAT activities,and their qualification support.A number of the these activities will be monitored,reviewed,witnessed,and documented with the intent of reducing redundant testing during qualification. In addition,this will provide for a higher level of assurance that the equipment andsystems have been developed,built,installed and operate in accordance with pre-defined requirements. |
» 猜你喜欢
磺胺二甲嘧啶杂质
已经有0人回复
卡博替尼杂质
已经有0人回复
药理学论文润色/翻译怎么收费?
已经有101人回复
阿西替尼杂质
已经有0人回复
盐酸贝西沙星
已经有0人回复
姜黄烯杂质
已经有0人回复
克立硼罗
已经有0人回复
米拉贝隆
已经有0人回复
SPME-GC-O-MS
已经有0人回复
祈福面上能中
已经有120人回复












回复此楼