| 查看: 498 | 回复: 2 | ||
| 本帖产生 1 个 翻译EPI ,点击这里进行查看 | ||
| 当前只显示满足指定条件的回帖,点击这里查看本话题的所有回帖 | ||
guoruijie金虫 (著名写手)
|
[求助]
帮忙翻译一下
|
|
|
看一篇关于废物处置的文章,有些地方看不懂,请帮忙翻译一下,谢谢。 2. Hazardous Waste Generation 2.1 The CM/RE shall identify expected hazardous waste generation prior to project commencement and immediately notify the AM of the estimated quantity and timeframe of generation along with the type(s) of hazardous waste to be generated. 2.2 The AM shall immediately communicate, in writing, this information to the Responsible Individual for the Operating Bureau responsible for the site EPA Generator ID. 2.2.1 Where the EPA Generator ID is maintained by BEDC the AM shall communicate with the RM to determine whether the identified hazardous waste generation will change the site’s generator status.If the site’s intended hazardous waste generation will change the generator Hazardous Waste Status of the site to a large quantity generator (LQG), the CM/RE shall develop the required minimization and Contingency Plan. |
» 猜你喜欢
2025年遐想
已经有4人回复
投稿Elsevier的杂志(返修),总是在选择OA和subscription界面被踢皮球
已经有8人回复
自然科学基金委宣布启动申请书“瘦身提质”行动
已经有4人回复
求个博导看看
已经有18人回复
guoruijie
金虫 (著名写手)
- 应助: 0 (幼儿园)
- 金币: 12782.7
- 散金: 10
- 红花: 4
- 帖子: 1330
- 在线: 34.8小时
- 虫号: 323902
- 注册: 2007-03-14
- 性别: MM
- 专业: 生物医用高分子材料
3楼2015-04-13 15:54:10







回复此楼
送红花一朵