24小时热门版块排行榜    

查看: 1385  |  回复: 4

hank888555

银虫 (初入文坛)

[求助] 求检索论文是否已被SCI、EI收录 已有1人参与

论文题目:
1、AZ Lu, HY Chen, Y Qin, N Zhang. Shape optimisation of the support section of a tunnel at great depths[J]. Computers and Geotechnics, 2014, 61: 190–197.
     (看是否已SCI收录)
2、Aizhong Lu, Ning Zhang, Hongyu Chen, Yuan Qin, Luqin Zhang. Analytic stress solutions for a circular pressure tunnel at great depth including support delay and pure slip boundary condition. In Proceedings of Conference on The 2014 ISRM European Rock Mechanics Symposium, Vigo, Spain, 27-29th May 2014.
     (看是否被EI或者ISTP收录)
     谢谢了!
回复此楼
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

小凡下山

铁杆木虫 (著名写手)

【答案】应助回帖

★ ★ ★ ★ ★ ★ ★
感谢参与,应助指数 +1
自私的猫1988: 金币+2, 鼓励应助~~ 2014-09-27 16:43:56
hank888555: 金币+5, ★★★★★最佳答案, 十分感谢! 2014-09-27 21:09:56
Shape optimisation of the support section of a tunnel at great depths  
作者:Lu, AZ (Lu, A. Z.)[ 1 ] ; Chen, HY (Chen, H. Y.)[ 1 ] ; Qin, Y (Qin, Y.)[ 1 ] ; Zhang, N (Zhang, N.)[ 1 ]  
COMPUTERS AND GEOTECHNICS
卷: 61
页: 190-197
DOI: 10.1016/j.compgeo.2014.05.011
出版年: SEP 2014
查看期刊信息
摘要
The shape optimisation of a cavity is typically performed without considering the previous support, which may significantly reduce the practical significance of such analyses. Even when an excavation section is optimised, failure of the surrounding rock in a tunnel cannot be prevented in the presence of excessive in situ stress. Thus, a support should be established to protect the stability of a tunnel from the failure of the surrounding rock. This study examines the optimal shape of the support that satisfies the optimisation criterion, which minimises the largest tangential stress along the inner edge of the support, for a specific net tunnel size and support strength. The optimisation process is to solve a series of forward problems using the conformal mapping method for a plane elasticity complex function. The tangential stress along the inner edge of the support is selected as the objective function, and the coefficients of the mapping function are considered as the design variables. The minimum value of the objective function is calculated based on the mixed penalty function method and the optimal support shape that satisfies the given constraints can be obtained. The stress state of an optimally shaped tunnel support is significantly improved compared to non-optimal configurations, and the stress concentration along the inner edge of the support is minimised. (C) 2014 Elsevier Ltd. All rights reserved.
关键词
作者关键词:Underground tunnel; Shape optimisation; Conformal mapping; Stress concentration; Mixed penalty function method
KeyWords Plus:EVOLUTIONARY PROCEDURE; HARMONIC HOLES
作者信息
通讯作者地址: Lu, AZ (通讯作者)
North China Elect Power Univ, Inst Hydroelect & Geotech Engn, Beijing 102206, Peoples R China.
地址:  
[ 1 ] North China Elect Power Univ, Inst Hydroelect & Geotech Engn, Beijing 102206, Peoples R China
电子邮件地址:lvaizhong@ncepu.edu.cn
基金资助致谢
基金资助机构
授权号
Natural Science Foundation of China  
11172101
Fundamental Research Funds for the Central Universities  
NCEPU13QN20
查看基金资助信息   
出版商
ELSEVIER SCI LTD, THE BOULEVARD, LANGFORD LANE, KIDLINGTON, OXFORD OX5 1GB, OXON, ENGLAND
类别 / 分类
研究方向:Computer Science; Engineering; Geology
Web of Science 类别:Computer Science, Interdisciplinary Applications; Engineering, Geological; Geosciences, Multidisciplinary
文献信息
文献类型:Article
语种:English
入藏号: WOS:000340305100019
ISSN: 0266-352X
电子 ISSN: 1873-7633
期刊信息
Impact Factor (影响因子):  Journal Citation Reports®
其他信息
IDS 号: AN0WQ
Web of Science 核心合集中的 "引用的参考文献": 15
Web of Science 核心合集中的 "被引频次": 0
2楼2014-09-27 15:03:13
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

小凡下山

铁杆木虫 (著名写手)

【答案】应助回帖

Accession number:  20142217771325           
Title:  Analytic stress solutions for a circular pressure tunnel at great depth including support delay and pure slip boundary condition      
Authors:  Lu, A.Z.1; Zhang, N.1; Chen, H.Y.1; Qin, Y.1; Zhang, L.Q.2  
Author affiliation:  
1 Institute of Hydroelectric and Geotechnical Engineering, North China Electric Power University, Beijing, China  
2 Key Laboratory of Engineering Geomechanics, Institute of Geology and geophysics, Chinese Academy of Sciences, Beijing, China              
Source title:  
Rock Engineering and Rock Mechanics: Structures in and on Rock Masses - Proceedings of EUROCK 2014, ISRM European Regional Symposium   
Abbreviated source title:  
Rock Eng. Rock Mech.: Struct. Rock Masses - Proc. EUROCK, ISRM Eur. Reg. Symp.           
Monograph title:  
Rock Engineering and Rock Mechanics: Structures in and on Rock Masses - Proceedings of EUROCK 2014, ISRM European Regional Symposium     
Issue date:  2014   
Publication year:  2014         
Pages:  1003-1008         
Language:  English            
ISBN-13:   9781138001497      
Document type:  Conference article (CA)     
Conference name:  2014 ISRM European Regional Symposium on Rock Engineering and Rock Mechanics: Structures in and on Rock Masses, EUROCK 2014     
Conference date:  May 26, 2014 - May 28, 2014     
Conference location:  Vigo, Spain      
Conference code:   105191      
Sponsor:  Ayuntamiento de Vigo; Deputacion de Pontevedra; Geobrugg; Colegio Oficial de Ingenieros de Minas del Noroeste; Sibelco; et al.,     
Publisher:  Taylor & Francis - Balkema, P.O. Box 447, Leiden, 2300 AK, Netherlands        
Abstract:  
Based on the plane elastic complex function method, theoretical analysis on the stress field around a circular tunnel with ring lining subjected to in situ stresses and inner hydrostatic pressure is carried out. The results of two extreme boundary conditions cases, pure slip and pure bond, are compared with each other. The displacement release coefficient is considered. The calculation results show that the magnitude of the deformation completed before lining installation has great effects on the stress distribution in the lining. If the lining is installed at a proper moment, the degree of stress concentration in the lining can be minimized. When theYoung's modulus of the lining is much lower than that of the rock, stress solutions for two extreme boundary condition cases are roughly the same. The smaller the lateral pressure coefficient λ, the larger the differences between the corresponding stress solutions for two extreme boundary condition cases. © 2014 Taylor & Francis Group, London.            
Number of references:  13                 
Main heading:  Boundary conditions        
Controlled terms:   Hydrostatic pressure  -  Linings  -  Rock mechanics  -  Rocks      
Uncontrolled terms:  
Calculation results  -  Circular tunnels  -  Complex functions  -  Insitu stress  -  Lateral pressure coefficient  -  Pressure tunnel  -  Stress field  -  Stress solutions         
Classification code:  
481.1 Geology -  502.1 Mine and Quarry Operations -  631.1.1 Liquid Dynamics -  921 Mathematics -  951 Materials Science                        
Database:  
Compendex
   Compilation and indexing terms, © 2014 Elsevier Inc.
3楼2014-09-27 15:04:40
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

hank888555

银虫 (初入文坛)

引用回帖:
3楼: Originally posted by 小凡下山 at 2014-09-27 15:04:40
Accession number:  20142217771325           
Title:  Analytic stress solutions for a circular pressure tunnel at great depth including support delay and pure slip boundary condition      
Authors:  ...

十分感谢!
4楼2014-09-27 21:12:27
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

uucnabs425

禁虫 (初入文坛)

本帖内容被屏蔽

5楼2015-12-20 16:07:17
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
相关版块跳转 我要订阅楼主 hank888555 的主题更新
最具人气热帖推荐 [查看全部] 作者 回/看 最后发表
[基金申请] 2026国自然函评费到账 +7 羊腰板 2026-08-21 7/350 2026-08-21 21:28 by iwuli
[基金申请] 科研孤儿太难了 +17 我4大白菜 2026-08-20 18/900 2026-08-21 20:57 by zhangev
[基金申请] 建议基金发布提前给出明确的时间点 +10 kulium 2026-08-21 12/600 2026-08-21 19:46 by kulium
[基金申请] 看来今天不会放榜了? +8 chengyan1220 2026-08-21 11/550 2026-08-21 17:52 by dcqxinyang
[基金申请] 让我中一个面上吧! +11 大萍1987 2026-08-20 13/650 2026-08-21 14:48 by 20120902066
[基金申请] 什么时候开奖? +7 CrisMessi 2026-08-18 7/350 2026-08-21 12:15 by weiyin
[基金申请] 时间戳又变了8-15 +15 archvillain 2026-08-15 27/1350 2026-08-21 11:32 by tim76
[基金申请] 今天基金会出结果吗?20260819 +15 kkkl_v 2026-08-19 16/800 2026-08-21 11:22 by 365372687
[论文投稿] 投稿咨询 +5 wwm09 2026-08-17 7/350 2026-08-21 10:11 by 期刊论文帮手
[基金申请] 今天放榜没戏了吧 +9 yuleib84 2026-08-19 11/550 2026-08-21 10:06 by gltch
[基金申请] 放榜前的不淡定 40+4 snowwithsea 2026-08-19 13/650 2026-08-21 08:30 by 北京莱茵编辑
[基金申请] 时间戳今天,20号变了 +4 archvillain 2026-08-20 4/200 2026-08-21 08:10 by gatelove
[基金申请] 今天系统多次维护,明天很可能放榜! +10 zju2000 2026-08-16 11/550 2026-08-20 20:02 by cl479861084
[基金申请] 时间戳变了,能看出什么问题? +18 基诺咪客 2026-08-17 23/1150 2026-08-20 17:19 by Godzela
[基金申请] 重要消息,中午系统在维护 +11 yuleib84 2026-08-18 12/600 2026-08-20 11:09 by xskun
[教师之家] 为什么余额宝的年化利率越来越低?主要原因有哪些? +5 瞬息宇宙 2026-08-15 5/250 2026-08-19 20:23 by super2002521
[基金申请] 今天放榜吗? +14 布布和一二 2026-08-19 15/750 2026-08-19 18:07 by gltch
[基金申请] 2027广东省杰青 +4 奶牛小黑 2026-08-15 10/500 2026-08-19 11:02 by wanfengnew
[基金申请] 今天维护系统维护 祝所有人 高中 +8 gjjjzhong 2026-08-18 9/450 2026-08-18 13:01 by 家与远方
[基金申请] 93BebMhtakh前后11位开头都是大写 +4 且听虎啸 2026-08-17 5/250 2026-08-18 00:49 by 蔡棒棒菂
信息提示
请填处理意见