²é¿´: 436  |  »Ø¸´: 2

chenedai

гæ (³õÈëÎÄ̳)

[ÇóÖú] °ï²éÁ½ÆªÂÛÎÄÊÇ·ñei¼ìË÷ ÒÑÓÐ1È˲ÎÓë

1£¬A Research Review of Project Risk Assessment Methods£¬ICFMD2013
2£¬Research on Risk Assessment of Ship Repair Based on Case-Based Reasoning£¬ISKE2013
»Ø¸´´ËÂ¥
ÒÑÔÄ   »Ø¸´´ËÂ¥   ¹Ø×¢TA ¸øTA·¢ÏûÏ¢ ËÍTAºì»¨ TAµÄ»ØÌû

zww081852

Í­³æ (³õÈëÎÄ̳)

¡¾´ð°¸¡¿Ó¦Öú»ØÌû

¡ï ¡ï ¡ï
chenedai(è¾è¾´ú·¢): ½ð±Ò+3, Thanks 2014-04-15 23:01:43
1   Accession number:       
20140817357790
        Title:        A research review of project risk assessment methods
        Authors:         Chen, Zhi Cheng1 ; Yao, Lu1; Yang, Jian Jun1
        Author affiliation:        1 Department of Management Engineering, Naval University of Engineering, Wuhan, China
        Source title:        Applied Mechanics and Materials
        Abbreviated source title:        Appl. Mech. Mater.
        Volume:        496-500
        Monograph title:        Frontiers of Manufacturing and Design Science IV
        Issue date:        2014
        Publication year:        2014
        Pages:        2857-2862
        Language:        English
        ISSN:         16609336
        E-ISSN:         16627482
        ISBN-13:         9783037859926
        Document type:        Conference article (CA)
        Conference name:        4th International Conference on Frontiers of Manufacturing and Design Science, ICFMD 2013
        Conference date:        September 10, 2013 - September 12, 2013
        Conference location:        Hong Kong, China
        Conference code:         102765
        Sponsor:        Contr. Eng. and Info. Sci. Res. Assoc.(CEIS); Intl. Frontiers of Sci. and Technol. Res. Assoc. (IFST); National Chin-Yi University of Technology; Trans tech publications inc
        Publisher:        Trans Tech Publications Ltd, Kreuzstrasse 10, Zurich-Durnten, CH-8635, Switzerland
        Abstract:        Based on the domestic and overseas researches of project risk assessment methods, this paper classifies project risk assessment methods into subjective judgment methods, evidence and deduction methods, system simulation methods and other methods. After exploring their definitions, advantages and disadvantages, this paper points out that subjective judgment and empirical analogy become two mainstream risk assessment methods. In the end, this paper claims that a risk assessment method does not need any unfathomable theory for its obvious engineering characteristics, but focuses on operability and applicability. © (2014) Trans Tech Publications, Switzerland.
        Number of references:        30
        Main heading:         Risk assessment
        Controlled terms:         Design  -  Manufacture  -  Reviews
        Uncontrolled terms:         Assessment method  -  Engineering characteristics  -  Judgment method  -  Project risk  -  Project risk assessment  -  Research review  -  Risk assessment methods  -  System simulations
        Classification code:         408 Structural Design -  537.1 Heat Treatment Processes -  903.2 Information Dissemination -  922.1 Probability Theory
        DOI:        10.4028/www.scientific.net/AMM.496-500.2857
        Database:        Compendex
                Compilation and indexing terms, © 2013 Elsevier Inc.
Full-text and Local Holdings Links


2   Quick Search
0 articles found in Compendex for 1969-2014: ((Research on Risk Assessment of Ship Repair Based on Case-Based Reasoning) WN All fields)
New SearchEditSave Search Create Alert RSS feed Search history
  No results were found.
  Use Edit to modify your search.
wu
2Â¥2014-04-15 09:36:47
ÒÑÔÄ   »Ø¸´´ËÂ¥   ¹Ø×¢TA ¸øTA·¢ÏûÏ¢ ËÍTAºì»¨ TAµÄ»ØÌû

congyuandong

гæ (³õÈëÎÄ̳)

¡ï
chenedai(è¾è¾´ú·¢): ½ð±Ò+1, Thanks 2014-06-20 10:07:06
¿ÉÒÔÓÃÕâ¸ö¹¤¾ßÃâ·Ñ²éѯ£¬http://as.baidu.com/a/item?docid=6028040&pre=web_am_se
3Â¥2014-04-15 13:19:42
ÒÑÔÄ   »Ø¸´´ËÂ¥   ¹Ø×¢TA ¸øTA·¢ÏûÏ¢ ËÍTAºì»¨ TAµÄ»ØÌû
Ïà¹Ø°æ¿éÌø×ª ÎÒÒª¶©ÔÄÂ¥Ö÷ chenedai µÄÖ÷Ìâ¸üÐÂ
×î¾ßÈËÆøÈÈÌûÍÆ¼ö [²é¿´È«²¿] ×÷Õß »Ø/¿´ ×îºó·¢±í
[¿¼ÑÐ] ¹¤¿Æ²ÄÁÏ085601 279Çóµ÷¼Á +7 À§ÓÚÐdz¿ 2026-03-17 9/450 2026-03-20 17:38 by ÎÞи¿É»÷111
[¿¼ÑÐ] 317Çóµ÷¼Á +5 Éê×ÓÉêÉê 2026-03-19 10/500 2026-03-20 15:58 by ²Ì³Ï
[¿¼ÑÐ] ¹ãÎ÷´óѧ¼ÒÇÝÒÅ´«ÓýÖÖ¿ÎÌâ×é2026Äê˶ʿÕÐÉú£¨½ÓÊÕ¼ÆËã»úרҵµ÷¼Á£© +3 123°¢±ê 2026-03-17 3/150 2026-03-20 15:58 by ·ÉÐÐçù
[¿¼ÑÐ] 265Çóµ÷¼Á +8 ÁºÁºÐ£Ð£ 2026-03-17 8/400 2026-03-20 14:40 by 27µÀ¿ÆÌØ
[¿¼ÑÐ] Ò»Ö¾Ô¸ÖÐÄÏ»¯Ñ§337Çóµ÷¼Á +4 niko- 2026-03-19 5/250 2026-03-20 13:49 by ´ÙÌì³É
[¿¼ÑÐ] 271²ÄÁϹ¤³ÌÇóµ÷¼Á +7 .6lL 2026-03-18 7/350 2026-03-20 09:10 by xingguangj
[¿¼ÑÐ] 329Çóµ÷¼Á +6 ÏëÉÏѧ߹߹ 2026-03-19 6/300 2026-03-20 09:00 by ÿÌìÖ»°ÚһС»á
[¿¼ÑÐ] ±¾¿ÆÖ£ÖÝ´óѧÎïÀíѧԺ£¬Ò»Ö¾Ô¸»ª¿Æ070200ѧ˶£¬346Çóµ÷¼Á +4 ÎÒ²»ÊÇÒ»¸ù´Ð 2026-03-18 4/200 2026-03-19 09:11 by ¸¡ÔÆ166
[¿¼ÑÐ] 295Çóµ÷¼Á +3 Ò»Ö¾Ô¸¾©Çø211 2026-03-18 5/250 2026-03-18 17:03 by zhaoqian0518
[¿¼ÑÐ] ²ÄÁÏ£¬·ÄÖ¯£¬ÉúÎ0856¡¢0710£©£¬»¯Ñ§ÕÐÉúÀ² +3 Eember. 2026-03-17 9/450 2026-03-18 10:28 by Eember.
[¿¼ÑÐ] 301Çóµ÷¼Á +9 yyÒªÉϰ¶Ñ½ 2026-03-17 9/450 2026-03-18 08:58 by Î޼ʵIJÝÔ­
[¿¼ÑÐ] ¿¼Ñл¯Ñ§Ñ§Ë¶µ÷¼Á£¬Ò»Ö¾Ô¸985 +4 ÕÅvvvv 2026-03-15 6/300 2026-03-17 17:15 by ruiyingmiao
[¿¼ÑÐ] ²ÄÁϹ¤³Ìר˶274Ò»Ö¾Ô¸211Çóµ÷¼Á +6 Ñ¦ÔÆÅô 2026-03-15 6/300 2026-03-17 11:05 by ѧԱh26Tkc
[¿¼ÑÐ] 333Çóµ÷¼Á +3 ÎÄ˼¿Í 2026-03-16 7/350 2026-03-16 18:21 by ÎÄ˼¿Í
[¿¼ÑÐ] 304Çóµ÷¼Á +3 ÂüÊâ2266 2026-03-14 3/150 2026-03-16 16:39 by houyaoxu
[¿¼ÑÐ] 070303 ×Ü·Ö349Çóµ÷¼Á +3 LJY9966 2026-03-15 5/250 2026-03-16 14:24 by xwxstudy
[¿¼ÑÐ] 0703 ÎïÀí»¯Ñ§µ÷¼Á +3 ÎÒ¿ÉÒÔÉϰ¶µÄ¶Ô 2026-03-13 5/250 2026-03-16 10:50 by ÎÒ¿ÉÒÔÉϰ¶µÄ¶ÔÂ
[¿¼ÑÐ] 0856ר˶279Çóµ÷¼Á +5 ¼ÓÓͼÓÓÍ£¡? 2026-03-15 5/250 2026-03-15 11:58 by 2020015
[¿¼ÑÐ] 297Çóµ÷¼Á +4 ѧº£Æ¯²´ 2026-03-13 4/200 2026-03-14 11:51 by ÈÈÇéɳĮ
[¿¼ÑÐ] ÕÐÊÕ0805£¨²ÄÁÏ£©µ÷¼Á +3 18595523086 2026-03-13 3/150 2026-03-14 00:33 by 123%¡¢
ÐÅÏ¢Ìáʾ
ÇëÌî´¦ÀíÒâ¼û