求助,投了 Electric Power Systems Research, 大修,不知道希望大不大。 已有13人参与
|
|
Reviewer #1: In this paper, an equivalent model of micro-grid has been proposed. The proposed model is based on the detailed modeling of components. The proposed method has some potential. However, there are some deficiencies, as follows: 1- The model and its estimated parameters are dependent of the disturbance applied to the microgrid. Therefore, in order to present a general model for the microgrid, different and major disturbances should be applied and studied in the paper. My suggestion is the application of machine learning methods. 2- On page 6, we can read the following text: " The system frequency of the micro-grid is constant when the micro-grid is in grid-connected mode. So, with f ??1 pu, the model of the equivalent static component can be written as:". This is right for the bus connected to the gird, but what about the frequency variations of buses in the microgid. This point and its effect on the modeling should be considered and discussed.(孤岛运行的仿真建模) Reviewer #4: 1. The authors need in this work to solve several operational issues with the microgrid operating in grid and islanded mode using the proposed model. They presented the main frame of how the model could be designed to solve these issues. However, they didn't present a specific problem with a specific solution. 2. It is not clear how the proposed model will perform under fault conditions. 3. Provide enough information about the optimization procedure using PSO. The choice of PSO over other algorithms is not clear. Authors need to clearly define why this is the best suitable optimization paradigm. 4. Discuss how practical the proposed model is. Present how fast are the iterations, and how many iterations are needed for a solution convergence. Discuss issues related to algorithmic delays and/or problems, and their respective effect on the results. 5. Discuss how fast your control system reacts in the case of internal contingencies, and how efficient it is to deal with internal faults. 6. Include several case studies for different scenarios. And provide enough numerical data regarding the test scenarios. 7. Finally, have the authors considered the robustness of the proposed model and control scheme? This important issue should be addressed and demonstrated in the paper. 感觉需要修改的很多,不知道希望大不大! |
» 猜你喜欢
酰胺脱乙酰基
已经有9人回复
有时候真觉得大城市人没有县城人甚至个体户幸福
已经有3人回复
CSC & MSCA 博洛尼亚大学能源材料课题组博士/博士后招生|MSCA经费充足、排名优
已经有5人回复
有70后还继续奋斗在职场上的吗?
已经有6人回复
博士延得我,科研能力直往上蹿
已经有7人回复
退学或坚持读
已经有27人回复
面上基金申报没有其他的参与者成吗
已经有5人回复
遇见不省心的家人很难过
已经有22人回复
» 本主题相关价值贴推荐,对您同样有帮助:
大家帮我看看审稿人的意见,需要大修,不知道希望大不
已经有4人回复
审稿意见回来,一个审稿人让据,编辑说大修,大家帮我看看希望大不
已经有24人回复
2楼2013-11-22 00:01:12
visualwood
新虫 (正式写手)
- 应助: 2 (幼儿园)
- 金币: 90.7
- 散金: 500
- 红花: 6
- 帖子: 448
- 在线: 81.6小时
- 虫号: 937294
- 注册: 2010-01-05
- 专业: 电力系统
3楼2013-11-22 08:56:47

4楼2013-11-22 10:53:55

5楼2013-11-25 08:22:59
6楼2013-11-29 20:57:33
7楼2013-12-15 12:51:01
★
小木虫: 金币+0.5, 给个红包,谢谢回帖
小木虫: 金币+0.5, 给个红包,谢谢回帖
|
本帖内容被屏蔽 |
8楼2014-05-04 09:38:40
allen_wjk
铁杆木虫 (正式写手)
- 应助: 2 (幼儿园)
- 金币: 7544
- 散金: 847
- 帖子: 867
- 在线: 532.6小时
- 虫号: 631359
- 注册: 2008-10-20
- 专业: 电力电子学
9楼2014-05-22 16:30:52
10楼2014-06-25 11:10:42













回复此楼