4.Maintenance Screen is an additional trash screen that is supplied with each cooling tower that is placed in the sump opening when the normal trash screen is removed for cleaning.
在通常的垃圾滤网拆掉进行清洗时,为每个冷却塔配备维护滤网,它是一种辅助垃圾滤网,设置在集水坑开口处。
5.The suction bell diameter is critical in determining the sump size. The suction bell diameter (D), distance from the suction bell to the sump floor (C), minimum water depth in the sump (H), pump spacing (S), and other sump dimensions are calculated according to the method specified in Section 6 of this standard. A short radius suction bell fitting shall be used.
在确定集水坑的大小时,吸入喇叭口的直径非常关键。根据本标准第6 章中规定的方法,来计算吸入喇叭口的直径(D)、吸入喇叭口到集水坑地面的距离(C)、集水坑内的最低水深(H)、泵间距(S)以及其它集水坑尺寸。应采用短半径吸入喇叭口配置。