[求助]
论文摘要翻译润色,求啄木鸟改错,责编在催稿,在线等,急!
|
||
|
在施工中采用了许多新材料和新工艺,主要有电气绝缘、轨道板的吊装与铺设、CA砂浆、轨道板的张拉等。应用了高度可调节的底座板模板,改进了轨道板粗铺定位方法,从而保证了施工精度要求;设置的临时端刺以及移动门式起重机配合吊车的轨道板吊装就位方法加快了施工进度。工程实践证明,该法精度高,施工工期短,经济效益明显。 many new materials and new technology were adopted in the construction, mainly including electrical insulation, the hoisting and laying of track plate, CA mortar, the tensioning of track plate and so on. The technology, which are application of height-adjustable base plate moulding board and improving the method of track plate rough pavement positioning, ensured the construction precision. The setting of temporary end thorn and mobile gantry crane with derrick truck for hoisting and laying of track plate sped up the construction progress. Engineering practice indicates that the improved technology has advantages of higher precision, shorter construction period, and obvious economy benefit. |
» 猜你喜欢
投稿返修后收到这样的回复,还有希望吗
已经有7人回复
压汞仪和BET测气凝胶孔隙率
已经有4人回复
博士申请都是内定的吗?
已经有14人回复
博士申请
已经有3人回复
谈谈两天一夜的“延安行”
已经有13人回复
氨基封端PDMS和HDI反应快速固化
已经有11人回复
之前让一硕士生水了7个发明专利,现在这7个获批发明专利的维护费可从哪儿支出哈?
已经有11人回复
论文投稿求助
已经有4人回复
Applied Surface Science 这个期刊。有哪位虫友投过的能把word模板发给我参考一下嘛
已经有3人回复
投稿精细化工
已经有6人回复
phu_grassman
荣誉版主 (知名作家)
快乐岛、布吉岛岛主
- 翻译EPI: 265
- 应助: 7 (幼儿园)
- 贵宾: 1.392
- 金币: 7538.7
- 散金: 11599
- 红花: 107
- 沙发: 11
- 帖子: 5611
- 在线: 1480.2小时
- 虫号: 1151372
- 注册: 2010-11-20
- 专业: 电化学
- 管辖: English Cafe
【答案】应助回帖
★ ★ ★ ★ ★ ★ ★ ★ ★ ★
srhuan: 金币+8, 翻译EPI+1, ★★★很有帮助, 谢谢啊!非常好 2012-11-06 10:31:14
srhuan: 金币+2, ★★★★★最佳答案 2012-11-06 10:45:20
srhuan: 金币+8, 翻译EPI+1, ★★★很有帮助, 谢谢啊!非常好 2012-11-06 10:31:14
srhuan: 金币+2, ★★★★★最佳答案 2012-11-06 10:45:20
| many new materials and technologies were adopted in the construction, which include electrical insulation, hoisting and laying of the track plate, CA mortar, tensioning of the track plate and so on. Height-adjutable moulding of the base plate was applied and positioning of ... was improved as well, which can meet the need of precision in construction. The setting of temporary end thorn and mobile gantry crane with derrick truck for hoisting and laying of track plate sped up the construction progress. Practice proves that the improved technology takes advantages in higher precision, shorter construction period, and obvious economic benefit. |
8楼2012-11-06 08:58:57













回复此楼