24小时热门版块排行榜    

查看: 261  |  回复: 0

zsn咸

木虫 (小有名气)

[求助] 帮忙翻译几句话~~~

The condition of equipment is subject to a regular, formal audit to ascertain that satisfactory standards are maintained.
Whilst a 5s program drives improvement in the standard of cleanliness and organization within the whole plant, OAC should drive improvements in the condition of the individual pieces of equipment.
This is driven through a program of machine refurbishment to bring equipment back to ‘as new’, as well as through operator involvement and ownership.
All defects should be repaired in a timely and permanent manner. There should be no evidence of temporary fixes(which in reality never get fixed!).
Examples of this include temporary patches on leaking and drip trays under leaking valves. This can be assessed during the site tour
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
相关版块跳转 我要订阅楼主 zsn咸 的主题更新
信息提示
请填处理意见