| 查看: 266 | 回复: 0 | ||
[求助]
帮忙翻译几句话~~~
|
|
The condition of equipment is subject to a regular, formal audit to ascertain that satisfactory standards are maintained. Whilst a 5s program drives improvement in the standard of cleanliness and organization within the whole plant, OAC should drive improvements in the condition of the individual pieces of equipment. This is driven through a program of machine refurbishment to bring equipment back to ‘as new’, as well as through operator involvement and ownership. All defects should be repaired in a timely and permanent manner. There should be no evidence of temporary fixes(which in reality never get fixed!). Examples of this include temporary patches on leaking and drip trays under leaking valves. This can be assessed during the site tour |
» 猜你喜欢
323分(计算机视觉和大模型项目)能直接上手
已经有3人回复
复试调剂
已经有3人回复
311分 22408 求调剂
已经有3人回复
320分人工智能调剂
已经有7人回复
一志愿郑大0705求调剂
已经有4人回复
0703化学
已经有10人回复
301求调剂
已经有10人回复
306分材料与化工求调剂
已经有6人回复
材料调剂
已经有11人回复
324求调剂
已经有9人回复














回复此楼
10