| 查看: 304 | 回复: 0 | |||
ptrlbq木虫 (正式写手)
|
[求助]
求助以下性能数据和一句话的中文翻译,谢谢!
|
|
Net power output to grid or field use, Gross Power Output: 19-22kWe Runtime hours to complete demonstration, 1,136 Parasitic load breakdown, Feed Pump: 1-4kWe, Fans: 0.1-6kWe Ambient temperature (hourly), 60-105°F Relative humidity, 50-100% Generator output (hourly), 8-30kWe Brine flow rate (daily), 120 GPM Brine inlet temperature (daily), 204°F The base load electricity was utilized on site to keep all the electricity “inside the fence.” The power generated displaced $.098/kWh, compared with net metering to the utility at $.044/kWh, making “inside the fence” operations the best option for the site. [ Last edited by ptrlbq on 2012-5-15 at 21:42 ] |
» 猜你喜欢
售SCI一区T0P文章,我:8O.55.1.O.5.4,科目齐全,可+急
已经有3人回复
售SCI文章,我:8O5.5.1.O.54,科目齐全,可+急
已经有3人回复
售SCI一区文章,我:8.O.551.O.5.4,科目全,可伽急
已经有3人回复
售SCI文章,我:8O5.5.1.O.54,科目齐全,可+急
已经有3人回复
售SCI-T0P文章,我:8O.5.5.1.O.54,科目齐全,可+急
已经有6人回复
售一区SCI文章T0P,我:8O.551.O54,科目全,可十急
已经有9人回复
售SCI-T0P文章,我:8O.5.5.1.O.54,科目齐全,可+急
已经有3人回复
考博求助
已经有3人回复
售SCI一区文章,我:8.O.551.O.5.4,科目全,可伽急
已经有5人回复
售SCI一区T0P文章,我:8.O.55.1.O.5.4,科目全,可+急
已经有4人回复











回复此楼
10