24小时热门版块排行榜    

CyRhmU.jpeg
查看: 219  |  回复: 0

ptrlbq

木虫 (正式写手)

[求助] 求助以下性能数据和一句话的中文翻译,谢谢!

Net power output to grid or field use,  Gross Power Output: 19-22kWe  
Runtime hours to complete demonstration,  1,136
Parasitic load breakdown, Feed Pump: 1-4kWe, Fans: 0.1-6kWe
Ambient temperature  (hourly),  60-105°F  
Relative humidity,  50-100%
Generator output (hourly),  8-30kWe
Brine flow rate (daily),  120 GPM
Brine inlet temperature (daily),  204°F

The base load electricity was utilized on site to  keep all the  electricity  “inside  the  fence.”  The power generated  displaced  $.098/kWh, compared with  net metering  to the utility at $.044/kWh, making  “inside  the fence” operations the best option for the site.

[ Last edited by ptrlbq on 2012-5-15 at 21:42 ]

» 猜你喜欢

关注我的豆丁http://www.docin.com/hbytlbq
已阅   关注TA 给TA发消息 送TA红花 TA的回帖
相关版块跳转 我要订阅楼主 ptrlbq 的主题更新
信息提示
请填处理意见