| 查看: 914 | 回复: 1 | |||
| 本帖产生 1 个 翻译EPI ,点击这里进行查看 | |||
cj8364693金虫 (小有名气)
|
[求助]
摘要结尾,自己水平太差,求好心人翻译。
|
||
|
采用本文建立的能耗评价表达式对所调查的两座污水厂(CAST工艺、A2/O工艺)进行了能耗评价分析与计算,结果表明采用CAST工艺污水处理厂的比能耗低于A2/O工艺的污水处理厂,同实际调查情况相吻合,说明本文所建立的能耗评价体系能够较为准确的判断出城市污水处理厂的能耗状况,对指导城市污水处理厂的工艺设计和运行管理具有一定的参考价值。此外将所调查的三座污水处理厂的碳排放数据与所实际调查的能耗情况相对比,发现CAST工艺污水处理厂单位处理量碳排放最大,同能耗情况相同。说明污水处理厂的比能耗越大,其单位碳排放量也越大。 最后,针对两座污水处理厂的实际情况,提出对应的节能减排建议。 |
» 猜你喜欢
售SCI文章,我:8O5.5.1.O.54,科目齐全,可+急
已经有7人回复
现代”学阀”该如何界定
已经有3人回复
售SCI一区T0P文章,我:8.O55.1.O.54,科目全,可十急
已经有3人回复
国社科系统bug了,是不是要放榜了?
已经有9人回复
申博发邮件
已经有9人回复
各位大神,目前国内有哪些比较好用的逆合成软件?
已经有9人回复
上海工程技术大学激光智能制造课题组|2027级博士研究生招生公告
已经有8人回复
上海工程技术大学激光智能制造课题组招收博士研究生
已经有8人回复
liufuliang
新虫 (知名作家)
- 翻译EPI: 19
- 应助: 16 (小学生)
- 金币: 61.9
- 散金: 1273
- 红花: 4
- 沙发: 1
- 帖子: 7909
- 在线: 274.7小时
- 虫号: 98678
- 注册: 2005-11-10
- 性别: GG
- 专业: 病原细菌与放线菌生物学
【答案】应助回帖
★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★
Mally89(金币+1): 感谢应助!~欢迎常来!~好运!~吼吼!~\(^o^)/~ 2012-03-14 21:08:02
cj8364693(金币+30, 翻译EPI+1): ★★★★★最佳答案, 哥,啥话不说,太感谢了 2012-03-15 08:38:43
Mally89(金币+1): 感谢应助!~欢迎常来!~好运!~吼吼!~\(^o^)/~ 2012-03-14 21:08:02
cj8364693(金币+30, 翻译EPI+1): ★★★★★最佳答案, 哥,啥话不说,太感谢了 2012-03-15 08:38:43
|
Energy consumption evaluation formula established in this paper was adopted to carry out analysis and calculation of the energy consumption evaluation for the investigated two sewage treatment plants (CAST Process and A2/O Process). The results indicated that energy consumption of sewage treatment plant with CAST Process was less than the less than that of sewage treatment plant with A2/O Process. It was consistent with the actual survey results, indicating that the energy consumption evaluation system established in this paper may be used to accurately determine the energy consumption of the urban sewage treatment plants and that it had certain reference value for the guidance of process design and operation management of urban sewage treatment plant. Through the comparison between carbon emissions data of the investigated three sewage treatment plants and the actual energy consumption, it was found that unit carbon emission of CAST Process sewage treatment plant was the highest. It was the same to energy consumption. Thus, we got the results: for sewage treatment plant, the greater the energy consumption was, the greater the unit carbon emission was. Finally, according to the actual situation of the two sewage treatment plants, corresponding energy-saving advices were provided. |

2楼2012-03-14 16:40:57










回复此楼