| 查看: 220 | 回复: 1 | |||
| 当前主题已经存档。 | |||
[交流]
求助翻译,奖励15金(已结束)
|
|||
|
求助翻译修改,奖励15金,我知道有点少,但是我就这些,麻烦各位大大了 1)终止注浆条件主要以单桩注入水泥量达到设计要求为主控因素。 2)如果一根桩中单管注浆量能达到设计要求,则第二根管可以不注。(我把1、2合在一起了) 3)如果第一根管达不到设计要求则打开第二根管注浆。但当第二根管注浆量仍不能达到设计要求,那么实行间歇注浆以达到设计注浆量为止;如果实行多次间歇注浆仍不能达到设计要求的单桩注浆量,那么当注浆压力连续达到8MPa且稳定3min以上,该桩终止注浆。同时对相邻桩适当加大注浆量。 4)如果桩顶冒浆,那么先停注一段时间以便让桩侧水泥浆凝固后再注。同时采用多次间歇注浆以达到设计注浆量。 (1) The main control principle of grouting is cement consumption. Perform grouting through one grouting pipe until reaching the designed cement consumption. (2) If can not reach the designed cement consumption, continue to grouting through the other grouting pipe. If still can not reach the designed cement consumption, perform intermittent grouting. If still can not reach the designed cement consumption after several intermittent grouting, stop grouting while the grouting pressure keep at the value higher than 8 MPa for 3 min. Increase the cement consumption for adjacent shafts. (3) If the grout overruns, stop grouting until the cement grout in the shaft side cured. Then perform intermittent grouting. [ Last edited by acama on 2010-1-27 at 15:59 ] |
» 猜你喜欢
不要再数国自然申请书的 filecode 的分隔符个数了
已经有21人回复
投英文期刊如何查重
已经有5人回复
伯胺上甲基求助
已经有7人回复
生命口面上会评结束了吗大家有知道结果吗?现在还没有结果正常不?
已经有8人回复
跨出版社商投稿
已经有5人回复
5个%2F,非固定段22个字母
已经有7人回复
生命口C13面上会评时间
已经有10人回复
生生命学部会评
已经有4人回复
H口,面上,时间戳7月7日。
已经有3人回复
小木虫没落了,除了祈祷帖子,几乎看不到有价值的帖子
已经有14人回复
sosososo1114
木虫 (正式写手)
- 翻译EPI: 2
- 应助: 1 (幼儿园)
- 金币: 2387.2
- 散金: 96
- 红花: 4
- 帖子: 490
- 在线: 57.2小时
- 虫号: 939993
- 注册: 2010-01-10
- 专业: 红外物理与技术
★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★
acama(金币+15):感谢你的修改,很有参考价值,把金币都给你 1-27 15:58
acama(金币+15):感谢你的修改,很有参考价值,把金币都给你 1-27 15:58
|
我在你原文的基础上改了, 1)终止注浆条件主要以单桩注入水泥量达到设计要求为主控因素。 2)如果一根桩中单管注浆量能达到设计要求,则第二根管可以不注。(我把1、2合在一起了) 3)如果第一根管达不到设计要求则打开第二根管注浆。但当第二根管注浆量仍不能达到设计要求,那么实行间歇注浆以达到设计注浆量为止;如果实行多次间歇注浆仍不能达到设计要求的单桩注浆量,那么当注浆压力连续达到8MPa且稳定3min以上,该桩终止注浆。同时对相邻桩适当加大注浆量。 4)如果桩顶冒浆,那么先停注一段时间以便让桩侧水泥浆凝固后再注。同时采用多次间歇注浆以达到设计注浆量。 First, the cement is grouted by single pipe as long as the pipe load is covered. The grouting will not be shut down until the grouted volume has reached the designed one. The second pipe will switched on if the designed pipe load will not be acchieved by single-pipe grouting. If the designed one is not filtted after the second pipe switched on, perform intermittent grouting. If it is still unable to be fitted after several intermittent grouting, stop grouting after the grouting pressure soar constantly at the value higher than 8 MPa for over3 min. And increase the grouting volume of adjacent shafts. (3) If the grout overruns, stop grouting until the cement grout fall back into the shaft. Then perform intermittent grouting. |
2楼2010-01-27 15:33:06











回复此楼