| 查看: 337 | 回复: 2 | |||
| 当前主题已经存档。 | |||
xuqinyao8239铁杆木虫 (著名写手)
|
[交流]
请高手修改一下翻译的内容(英-汉)
|
||
|
The goals of process optimization change with the successful development of a project from early process research through scale-up into dedicated manufacturing .This general order of optimization may differ according to the nature of the process being considered; for instance, a process generating an inordinate amount of waste may be optimized to decrease waste before scaling up to the pilot plant.The initial goal of all process research and development is to maximize the amount of product generated under the reaction conditions.This is done by driving the reaction to completion, that is, by consuming any starting material that is charged in limiting amounts and by generating product with a minimal amount of by-products. Once the in-process yield has been optimized, the maximum yield of isolated product is expected. 工艺优化的目标随项目的成功发展而变化,从最初的工艺研发到放大直至投入生产。最优化的顺序根据所考察的工艺的性质有可能不同:如,一个产生过量废物的过程,可在中试之前进行最优化以降低废物量.所有工艺研发的最初目的都是为了得到尽可能多的产品,这就需要反应尽量完全,也就是所有起始原料都消耗到最低量并且得到含最少副产物的产品.一旦各步的优化完成,那么高收率的得到产品就可能成为现实 |
» 猜你喜欢
实名举报:华南理工大学物理与光电学院副院长李志远婚内两次出轨女学生(博士)
已经有14人回复
上海工程技术大学激光智能制造课题组招收博士研究生
已经有9人回复
上海工程技术大学激光智能制造课题组|2027级博士研究生招生公告
已经有9人回复
申博发邮件
已经有11人回复
现代”学阀”该如何界定
已经有7人回复
各位大神,目前国内有哪些比较好用的逆合成软件?
已经有12人回复
我的奶奶
已经有3人回复
国社科系统bug了,是不是要放榜了?
已经有9人回复
2楼2010-01-17 20:10:17
shirongjiu
金虫 (正式写手)
- 翻译EPI: 18
- 应助: 0 (幼儿园)
- 贵宾: 0.227
- 金币: 1550.7
- 散金: 84
- 红花: 4
- 帖子: 542
- 在线: 229.4小时
- 虫号: 727330
- 注册: 2009-03-20
- 性别: GG
- 专业: 环境微生物学
我来试试!
★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★
xuqinyao8239(金币+15,VIP+0): 1-18 11:58
xuqinyao8239(金币+15,VIP+0): 1-18 11:58
| 工艺优化的目标随项目早期的工艺研发、放大直至投产的成功进展而发生变化。工艺优化的先后顺序可能根据工艺的本质而有所不同:例如,一个能够产生过量废物的生产工艺过程,则在中试之前需要先进行工艺优化以期降低废物产量。所有工艺研发的最初目的都是为了在相应的反应条件下使产品的产量最大化。这就需要反应尽量完全,也就是所有起始原料都消耗到最低量并且其副产物尽可能少。一旦工艺进程中的每一步产量都得以优化,则获取最大产率的分离产物就可能成为现实。 |
3楼2010-01-18 08:24:45










回复此楼