| 查看: 373 | 回复: 2 | ||
| 当前主题已经存档。 | ||
[交流]
求翻译一小段话,散20金币!!!急
|
||
| the cyclone catch and the ceramic or glass fibre filter of the sampling line with a ceramic primary filter straight inside the unit and at the process temperature,as seen in Figure 5.The unpractically large and complex surface areas for the tar to stick were also minimised by removing the gas conditioning coil present in the isokinetic sampling train.The sampling line was thus made more compact and short.After the filter and before the absorption bottles the gas is quenched in a heat exchanger and led through a series of impingers containing proper absorption liquids.The condensing unit is washed with the same liquids |
2楼2010-01-12 13:39:29
3楼2010-01-12 18:13:52













回复此楼