| 查看: 250 | 回复: 1 | |||
| 当前主题已经存档。 | |||
[交流]
求助两句翻译,送金币以表谢意!!急用,在线等!!
|
|||
|
1 position of drilling surveys are designed on the map in plant total under 1C plan, the rate of 1 / 2000. From the this drawings this drilling is located outside the site actual in the landmark put under control and data coordinates of them. After the drill completed, check at the site that only K2C drilling is to change the position by tomb, 25 remain drilling were constructed properly position has been determined. 2 Plan 1C in parallel direction and the distance Ho Chi Minh road from 600m to 800m to the west, main items such as silo, rotary kiln, grinding house, clay stations crushing, storage limestone, clay stone ... are positioned on the hill with a height of the peak from 30.88m to 35.91m, high in the foot hills from 8.12m to 12.81m. Under the foot of the mountain range with narrow valley running from the north south, a degree high from 4.95m to 8.64m. 谢谢了,在线等!!! |
» 猜你喜欢
天津大学招2026.09的博士生,欢迎大家推荐交流(博导是本人)
已经有3人回复
有时候真觉得大城市人没有县城人甚至个体户幸福
已经有6人回复
面上项目申报
已经有3人回复
酰胺脱乙酰基
已经有9人回复
CSC & MSCA 博洛尼亚大学能源材料课题组博士/博士后招生|MSCA经费充足、排名优
已经有5人回复
博士延得我,科研能力直往上蹿
已经有7人回复
退学或坚持读
已经有27人回复
面上基金申报没有其他的参与者成吗
已经有5人回复
遇见不省心的家人很难过
已经有22人回复
2楼2009-08-19 13:12:50













回复此楼