24小时热门版块排行榜    

查看: 248  |  回复: 1
当前主题已经存档。

38083410

铁虫 (小有名气)

[交流] 求助两句翻译,送金币以表谢意!!急用,在线等!!

1
position of drilling surveys are designed on the map in plant total under 1C plan, the rate of 1 / 2000. From the this drawings this drilling is located outside the site actual in the landmark put under control and data coordinates of them.
After the drill completed, check at the site that only K2C drilling is to change the position by tomb, 25 remain drilling were constructed properly position has been determined.
2
Plan 1C in parallel direction and the distance Ho Chi Minh road from 600m to 800m to the west, main items such as silo, rotary kiln, grinding house, clay stations crushing, storage limestone, clay stone ... are positioned on the hill with a height of the peak from 30.88m to 35.91m, high in the foot hills from 8.12m to 12.81m. Under the foot of the mountain range with narrow valley running from the north south, a degree high from 4.95m to 8.64m.

谢谢了,在线等!!!

» 猜你喜欢

已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

VVWW

新虫 (小有名气)

能否提供原文
2楼2009-08-19 13:12:50
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
相关版块跳转 我要订阅楼主 38083410 的主题更新
普通表情 高级回复 (可上传附件)
信息提示
请填处理意见