| ²é¿´: 252 | »Ø¸´: 1 | |||
| µ±Ç°Ö÷ÌâÒѾ´æµµ¡£ | |||
38083410Ìú³æ (СÓÐÃûÆø)
|
[½»Á÷]
ÇóÖúÁ½¾ä·Ò룬Ëͽð±ÒÒÔ±íлÒ⣡£¡¼±Óã¬ÔÚÏߵȣ¡£¡
|
||
|
1 position of drilling surveys are designed on the map in plant total under 1C plan, the rate of 1 / 2000. From the this drawings this drilling is located outside the site actual in the landmark put under control and data coordinates of them. After the drill completed, check at the site that only K2C drilling is to change the position by tomb, 25 remain drilling were constructed properly position has been determined. 2 Plan 1C in parallel direction and the distance Ho Chi Minh road from 600m to 800m to the west, main items such as silo, rotary kiln, grinding house, clay stations crushing, storage limestone, clay stone ... are positioned on the hill with a height of the peak from 30.88m to 35.91m, high in the foot hills from 8.12m to 12.81m. Under the foot of the mountain range with narrow valley running from the north south, a degree high from 4.95m to 8.64m. ллÁË£¬ÔÚÏߵȣ¡£¡£¡ |
» ²ÂÄãϲ»¶
Ò»Ö¾Ô¸Ö£´ó0705Çóµ÷¼Á
ÒѾÓÐ4È˻ظ´
0703»¯Ñ§
ÒѾÓÐ10È˻ظ´
301Çóµ÷¼Á
ÒѾÓÐ10È˻ظ´
306·Ö²ÄÁÏÓ뻯¹¤Çóµ÷¼Á
ÒѾÓÐ6È˻ظ´
²ÄÁϵ÷¼Á
ÒѾÓÐ11È˻ظ´
324Çóµ÷¼Á
ÒѾÓÐ9È˻ظ´
²ÄÁÏר˶283Çóµ÷¼Á
ÒѾÓÐ10È˻ظ´
²ÄÁÏÓ뻯¹¤306·ÖÕÒµ÷¼Á
ÒѾÓÐ13È˻ظ´
085600£¬321·ÖÇóµ÷¼Á
ÒѾÓÐ10È˻ظ´
0817»¯Ñ§¹¤³ÌÓë¼¼ÊõÇóµ÷¼Á£¬Ò»Ö¾Ô¸Öк£Ñó319
ÒѾÓÐ8È˻ظ´
VVWW
гæ (СÓÐÃûÆø)
- Ó¦Öú: 0 (Ó×¶ùÔ°)
- ½ð±Ò: 7
- É¢½ð: 58
- Ìû×Ó: 156
- ÔÚÏß: 24Сʱ
- ³æºÅ: 826310
- ×¢²á: 2009-08-11
- ÐÔ±ð: MM
- רҵ: Ö²ÎïÒÅ´«Ñ§
2Â¥2009-08-19 13:12:50














»Ø¸´´ËÂ¥