| 查看: 251 | 回复: 1 | |||
| 当前主题已经存档。 | |||
[交流]
求助两句翻译,送金币以表谢意!!急用,在线等!!
|
|||
|
1 position of drilling surveys are designed on the map in plant total under 1C plan, the rate of 1 / 2000. From the this drawings this drilling is located outside the site actual in the landmark put under control and data coordinates of them. After the drill completed, check at the site that only K2C drilling is to change the position by tomb, 25 remain drilling were constructed properly position has been determined. 2 Plan 1C in parallel direction and the distance Ho Chi Minh road from 600m to 800m to the west, main items such as silo, rotary kiln, grinding house, clay stations crushing, storage limestone, clay stone ... are positioned on the hill with a height of the peak from 30.88m to 35.91m, high in the foot hills from 8.12m to 12.81m. Under the foot of the mountain range with narrow valley running from the north south, a degree high from 4.95m to 8.64m. 谢谢了,在线等!!! |
» 猜你喜欢
化工专硕348,一志愿985求调剂
已经有6人回复
292求调剂
已经有3人回复
317一志愿华南理工电气工程求调剂
已经有3人回复
304求调剂
已经有4人回复
290求调剂
已经有6人回复
295求调剂
已经有5人回复
26申博
已经有4人回复
材料学调剂
已经有5人回复
264求调剂
已经有3人回复
311求调剂
已经有8人回复
2楼2009-08-19 13:12:50













回复此楼