求助两句翻译,送金币以表谢意!!急用,在线等!!
|
|||
|
1 position of drilling surveys are designed on the map in plant total under 1C plan, the rate of 1 / 2000. From the this drawings this drilling is located outside the site actual in the landmark put under control and data coordinates of them. After the drill completed, check at the site that only K2C drilling is to change the position by tomb, 25 remain drilling were constructed properly position has been determined. 2 Plan 1C in parallel direction and the distance Ho Chi Minh road from 600m to 800m to the west, main items such as silo, rotary kiln, grinding house, clay stations crushing, storage limestone, clay stone ... are positioned on the hill with a height of the peak from 30.88m to 35.91m, high in the foot hills from 8.12m to 12.81m. Under the foot of the mountain range with narrow valley running from the north south, a degree high from 4.95m to 8.64m. 谢谢了,在线等!!! |
» 猜你喜欢
假如你的研究生提出不合理要求
已经有10人回复
萌生出自己或许不适合搞科研的想法,现在跑or等等看?
已经有4人回复
Materials Today Chemistry审稿周期
已经有4人回复
参与限项
已经有3人回复
实验室接单子
已经有4人回复
全日制(定向)博士
已经有4人回复
对氯苯硼酸纯化
已经有3人回复
求助:我三月中下旬出站,青基依托单位怎么办?
已经有12人回复
所感
已经有4人回复
要不要辞职读博?
已经有7人回复
2楼2009-08-19 13:12:50












回复此楼