| 查看: 273 | 回复: 1 | |||
| 当前主题已经存档。 | |||
[交流]
求助两句翻译,送金币以表谢意!!急用,在线等!!
|
|||
|
1 position of drilling surveys are designed on the map in plant total under 1C plan, the rate of 1 / 2000. From the this drawings this drilling is located outside the site actual in the landmark put under control and data coordinates of them. After the drill completed, check at the site that only K2C drilling is to change the position by tomb, 25 remain drilling were constructed properly position has been determined. 2 Plan 1C in parallel direction and the distance Ho Chi Minh road from 600m to 800m to the west, main items such as silo, rotary kiln, grinding house, clay stations crushing, storage limestone, clay stone ... are positioned on the hill with a height of the peak from 30.88m to 35.91m, high in the foot hills from 8.12m to 12.81m. Under the foot of the mountain range with narrow valley running from the north south, a degree high from 4.95m to 8.64m. 谢谢了,在线等!!! |
» 猜你喜欢
职称论文投稿
已经有12人回复
反应求助
已经有6人回复
基于自然哲学类比的风化壳型稀土矿
已经有16人回复
看《给阿ma的情书》有感
已经有10人回复
2026年WR青拔进展
已经有7人回复
中!中!中!
已经有10人回复
会评什么时候开始?
已经有4人回复
国自然申请五篇代表作大比拼,感觉这个是最重要的
已经有12人回复
无聊看看时间戳打发时间
已经有4人回复
咨询
已经有3人回复
2楼2009-08-19 13:12:50











回复此楼