24小时热门版块排行榜    

查看: 538  |  回复: 8
当前主题已经存档。
【悬赏金币】回答本帖问题,作者xiongjq1984将赠送您 31 个金币

xiongjq1984

银虫 (小有名气)

[求助] 求助文献(已结束)

谁能给我提供一些比利时HOBOKEN冶炼厂利用艾萨炉(ISA)炼低品味杂铜技术的资料,文献或者图片都可以,只要是有价值的。

[ Last edited by xiongjq1984 on 2008-10-17 at 10:12 ]

» 猜你喜欢

悄悄的我走了,正如我悄悄的来;我敲一敲键盘,写下了些许留言。
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

libwh

木虫 (正式写手)

小木虫总版主

★ ★ ★ ★ ★
xiongjq1984(金币+5,VIP+0):谢谢你,但是不是我要的。我要的他们厂炼杂铜的技术资料,如工艺流程,设备概况等
我找的相关资料,您看行不行
http://www.namipan.com/d/DalianC ... aa3eb5bf4651f881c00

[ Last edited by libwh on 2008-10-10 at 13:02 ]
因为你快乐,所以我快乐
2楼2008-10-10 12:48:42
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

fybyjh

木虫 (正式写手)


xiongjq1984(金币+1,VIP+0):这个我已经有了,谢谢
Hoboken转炉作业简述:Hoboken转炉作业简述.pdf
3楼2008-10-10 13:13:22
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

风之惑

铁杆木虫 (著名写手)

科研宝库区

这种技术,在公开文献中很难找到,即使有也是只言片语,需要有丰富的专业才能看出端倪,不知LZ的目的是什么,如果仅是简单的找技术,可以找国内的,可能容易的多,如云铜的一些铜冶炼技术,如果是盯上HOBOKEN,则祝你好运!
爱情要始终如一,可是幽会的地点要不断变换!
4楼2008-10-10 13:53:07
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

sanko211

荣誉版主 (职业作家)

小木虫扣篮王

帖子必须表明求助截止日期,格式为:【标题】+【有效期至XXXX年XX月XX日】,楼主改吧
5楼2008-10-10 15:03:30
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

yuchaoying

荣誉版主 (著名写手)

这东西,不好找呀
天道酬勤 ---------我信
6楼2008-10-10 16:54:25
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

gewar

木虫 (小有名气)

Mars Scout

★ ★ ★
xiongjq1984(金币+3,VIP+0):谢谢,这些我都有了
的确很难找啊。
cnki,cqvip,万方都很难找到匹配的,倒是经常碰到 我国云南铜业公司的艾萨炉的文章。不过还是找了一些,不知楼猪用不用的上。

原版资料————————来自http://www.isasmelt.com/index.cf ... nt&contentID=51



More than 40% increase in output of copper since installing ISASMELT™

The Mount Isa Mines Copper ISASMELT treats more than 1,000,000 tonnes of copper bearing feed per year. Mount Isa concentrate and purchased concentrates are mixed and stored in a blending plant. The concentrates are mixed with fluxes, reverts and some lump coal, and pelletised in a disc pelletiser, prior to being fed to the ISASMELT furnace. Bath temperature is controlled using a mixture of natural gas and lump coal. Process air is enriched to 60-65% oxygen content. The furnace produces a copper matte with a copper content of 60%, which is tapped together with the slag into a rotary holding furnace for separation.

The refractory bricks used to line the furnace shell are high grade magnesite chrome and have no water cooling applied to them. The furnace runs for about 3 years before any refractory repair is required. A minor shutdown lasting 3-4 weeks is used to replace worn refractory at this time. Replacement of the refractory is simple, given the shape of the furnace. The vertical cylinder can be bricked dry without mortar, allowing very tight tolerances to be achieved. It can be bricked very quickly using minimal personnel. Long furnace life has been achieved with the development of advanced control systems that ensure smooth operation of the furnace.

Offgases from the ISASMELT furnace pass into a waste heat boiler, prior to passing into an electrostatic precipitator for cleaning. The cleaned gases pass to a sulphuric acid plant for capture of sulphur.

附带的一幅图片



恕我英语拙劣——无法翻译其中的专业词汇,你可以用翻译软件试试什么意思,我用google翻译看 了一下,讲了一下大概操作流程,什么 空气浓缩,氧气含量啊。

另外,我下载了这些论文pdf或caj的
《20世纪末世界主要铜冶炼厂技术进步的回顾及对21世纪初的展望 》
《奥弗佩尔特冶金公司 》(这个是关键词)
云铜艾萨炉创六项世界记录
Hoboken转炉作业简述.caj
复合式基础在铜冶炼厂艾萨炉基础中的应用.caj
英文《Isasmelt technology—current status
and future development》
《艾萨-余热锅炉运行情况分析》pdf
云铜艾萨炉创六项世界记录


最后,我找到了一个邮箱,你可以翻译为英文发一封信过去看看。
isasmelt@xstratatech.com.au
2014魔剑复活了!
7楼2008-10-11 20:49:36
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
相关版块跳转 我要订阅楼主 xiongjq1984 的主题更新
不应助 确定回帖应助 (注意:应助才可能被奖励,但不允许灌水,必须填写15个字符以上)
信息提示
请填处理意见