| ²é¿´: 291 | »Ø¸´: 5 | ||
| µ±Ç°Ö÷ÌâÒѾ´æµµ¡£ | ||
| ¡¾ÐüÉͽð±Ò¡¿»Ø´ð±¾ÌûÎÊÌ⣬×÷Õßtelev½«ÔùËÍÄú 5 ¸ö½ð±Ò | ||
| µ±Ç°Ö»ÏÔʾÂú×ãÖ¸¶¨Ìõ¼þµÄ»ØÌû£¬µã»÷ÕâÀï²é¿´±¾»°ÌâµÄËùÓлØÌû | ||
televͳæ (³õÈëÎÄ̳)
|
[ÇóÖú]
ÇóÕªÒªººÒëÓ¢·Ò루¼Ìµç±£»¤Àࣩ
|
|
|
µçÁ¦ÏµÍ³ºÍ¹úÃñ¾¼Ã¸÷²¿ÃÅÓкÜÃÜÇеĹØÏµ£¬µ«ÔÚµçÁ¦ÏµÍ³ÔËÐÐÖÐʱ³£»á·¢Éú¸÷ÖÖ¹ÊÕÏ£¬ÆäÖдó¶àÊýΪ¶Ì·¹ÊÕÏ¡£¶Ì·¹ÊÕ϶ԵçÁ¦ÏµÍ³µÄÕý³£ÔËÐÐºÍµçÆøÉ豸ÓкܴóµÄΣº¦£¬ÉõÖÁ»áÔì³ÉÈËÔ±ÉËÍö¡£ÎªÁ˱£Ö¤°²È«¹©µçºÍϵͳµÄÕý³£ÔËÐУ¬ÔÚµçÁ¦ÏµÍ³ÖÐ×°Óв»Í¬ÀàÐ͵ĹýµçÁ÷±£»¤×°Öá£ÔÚÒ»°ãµçÁ¦ÏµÍ³ÖУ¬Ö÷Òª²ÉÓôøÊ±Ï޵ĹýµçÁ÷±£»¤ºÍ˲ʱ¶¯×÷µÄµçÁ÷Ëٶϱ£»¤¡£±¾ÎÄ·ÖÎöÁ˵çÁ¦ÏµÍ³³£ÓõĴøÊ±ÏÞ¹ýµçÁ÷±£»¤ºÍ˲ʱ¶¯×÷µÄµçÁ÷Ëٶϱ£»¤µÄ×é³ÉºÍ»ù±¾ÔÀí£¬Íê³É±£»¤µÄÕû¶¨ºÍУÑé¡£Õë¶ÔÆäÔÚÕû¶¨Ð£ÑéÖдæÔÚµÄÎÊÌ⣬Ìá³öÁ˸´ºÏµçѹ±ÕËø¹ýµçÁ÷±£»¤·½°¸£¬Âú×ãÁ˵çÁ¦ÏµÍ³¹ýµçÁ÷±£»¤ÁéÃô¶ÈµÄÒªÇó¡£ÀûÓöԳƷÖÁ¿·¨¶Ô·¢Éú²»¶Ô³Æ¶Ì·¹ÊÕÏʱÈýÏàµçѹ¡¢µçÁ÷µÄ±ä»¯Çé¿ö½øÐÐÊýѧ·ÖÎö¼ÆË㣬×é³ÉÕûÌ׸´ºÏµçѹ±ÕËø¹ýµçÁ÷±£»¤×°Öã¬Éè¼Æ±£»¤µç·ºÍµ¯»É²Ù×Ý»ú¹¹¸ßѹ¶Ï·Æ÷µÄ¿ØÖƵç·£¬ÀûÓÃmatlabÈí¼þ·ÂÕæµ¥Ïà¶Ì·¹ÊÕϲ¢¼ì²â¸ºÐòµçѹ¡£ ¹Ø¼ü´Ê£ºµçÁ¦ÏµÍ³ ²»¶Ô³Æ¶Ì· ¹ýµçÁ÷±£»¤ ¸´ºÏµçѹ matlab·ÂÕæ |
» ²ÂÄãϲ»¶
22408 312Çóµ÷¼Á
ÒѾÓÐ19È˻ظ´
26Äêµç³Ø·½Ïò²©Ê¿ÉêÇë
ÒѾÓÐ4È˻ظ´
0854µ÷¼Á
ÒѾÓÐ16È˻ظ´
ɽ¶«Ê¡»ù½ð2026
ÒѾÓÐ13È˻ظ´
085801µçÆø×¨Ë¶272Çóµ÷¼Á
ÒѾÓÐ21È˻ظ´
284Çóµ÷¼Á
ÒѾÓÐ18È˻ظ´
291Çóµ÷¼Á
ÒѾÓÐ6È˻ظ´
297£¬¹¤¿Æµ÷¼Á?ºÓÄÏũҵ´óѧ±¾¿Æ
ÒѾÓÐ10È˻ظ´
310Çóµ÷¼Á
ÒѾÓÐ18È˻ظ´
297£¬¹¤¿Æµ÷¼Á?
ÒѾÓÐ7È˻ظ´
lm_nudt
Ìú¸Ëľ³æ (ÖøÃûдÊÖ)
- Ó¦Öú: 0 (Ó×¶ùÔ°)
- ¹ó±ö: 0.3
- ½ð±Ò: 6724.7
- ºì»¨: 1
- Ìû×Ó: 1472
- ÔÚÏß: 239.6Сʱ
- ³æºÅ: 555679
- ×¢²á: 2008-05-09
- רҵ: ±¬Õ¨Óë³å»÷¶¯Á¦Ñ§
5Â¥2008-06-06 17:07:22
qqcor
½ð³æ (ÕýʽдÊÖ)
Ì«Ñô
- Ó¦Öú: 0 (Ó×¶ùÔ°)
- ½ð±Ò: 472.5
- É¢½ð: 20
- Ìû×Ó: 544
- ÔÚÏß: 22.2Сʱ
- ³æºÅ: 530167
- ×¢²á: 2008-03-21
- ÐÔ±ð: GG
- רҵ: É«Æ×·ÖÎö
| The electrical power system and national economy various departments have the very close relationship, but will often break down each kind in the electrical power system movement, majority for short trouble. The short trouble has the very big harm to electrical power system's normal operation and the electrical equipment, will cause the personnel casualty. In order to guarantee that the safe power supply and system's normal operation, has the different type in the electrical power system Chinese dress the current protection. In the common electrical power system, mainly uses the belt time limit the current protection and the instantaneous movement electricity speed of flow breaks the protection. This article has analyzed the electrical power system commonly used belt time limit current protection and the instantaneous movement electricity speed of flow breaks the protection the composition and the basic principle, completes the protection the installation and the verification. In view of it the question which exists in the installation verification, proposed the compound voltage block system current protection plan, has satisfied the electrical power system current protection sensitivity request. Using the method of symmetrical components to has when the asymmetrical short trouble the three-phase voltage, the electric current change situation carries on the mathematical analysis computation, the composition whole set compound voltage block system current protection, the design protection circuit and the spring control mechanism high pressure circuit breaker's control circuit, and examines the negative sequence voltage using the matlab software simulation single-phase short trouble. Key word: Electrical power system Is asymmetrical short-circuits Crosses the current protection Compound voltage matlab simulation |

2Â¥2008-06-05 21:58:24
lhzm-114
Ìú³æ (³õÈëÎÄ̳)
- Ó¦Öú: 0 (Ó×¶ùÔ°)
- ½ð±Ò: 20
- Ìû×Ó: 36
- ÔÚÏß: 3.8Сʱ
- ³æºÅ: 569755
- ×¢²á: 2008-06-06
|
Power system and national economic departments have very close relations, but in the power system will happen from time to time in the operation of various failures, most of which are short-circuit fault. Fault on the power system and the normal operation of electrical equipment have great harm, or even cause casualties. In order to guarantee the safety of the power supply system and the normal operation of the power system with different types of overcurrent protection devices. In general the power system, used mainly with the time limits of the current protection and instantaneous action to protect the current speed off. This paper analyses the power system with time limits commonly used over-current protection and instantaneous action of the current speed off the protection of the basic principles of composition and complete protection of the setting and checking. In its setting against the problems that exist in check, by blocking the voltage of the current protection programme to meet the power system protection sensitivity over current requirements. Use of symmetrical component of the asymmetric fault occurred when the three-phase voltage, current situation in mathematical analysis, the composition of the entire complex voltage atresia overcurrent protection devices, circuit design protection agencies and spring manipulation of the high-voltage control circuit breaker, use matlab software simulation single-phase fault detection and negative sequence voltage. Key words: asymmetric power system short-circuit voltage of the current protection matlab Simulation |

3Â¥2008-06-06 08:37:55
telev
ͳæ (³õÈëÎÄ̳)
- Ó¦Öú: 0 (Ó×¶ùÔ°)
- ½ð±Ò: 88
- Ìû×Ó: 4
- ÔÚÏß:
- ³æºÅ: 416082
- ×¢²á: 2007-06-29
- ÐÔ±ð: GG
- רҵ: µçÆø¹¤³Ì¼°Æä×Ô¶¯»¯
4Â¥2008-06-06 16:27:51














»Ø¸´´ËÂ¥