| 查看: 1722 | 回复: 32 | ||||
| 【奖励】 本帖被评价27次,作者付晓强增加金币 20.4 个 | ||||
| 当前只显示满足指定条件的回帖,点击这里查看本话题的所有回帖 | ||||
[资源]
Engineering and Design Tunnel and Shaft In Rock------英文原版书
|
||||
|
Engineering and Design TUNNELS AND SHAFTS IN ROCK 1. Purpose. This manual was prepared by CECW-ED and CECW-EG and provides technical criteria and guidance for the planning, design, and construction of tunnels and shafts in rock for civil works projects. Specific areas covered include geological and geotechnical explorations required, construc- tion of tunnels and shafts, design considerations, geomechanical analysis, design of linings, and instrumentation and monitoring. 2. Applicability. This manual applies to all Headquarters, U.S. Army Corps of Engineers (HQUSACE) elements, major subordinate commands, districts, laboratories, and field-operating activi- ties having responsibilities for the design of civil works projects. FOR THE COMMANDER: OTIS WILLIAMS Colonel, Corps of Engineers Chief of Staff |
» 本帖附件资源列表
-
欢迎监督和反馈:小木虫仅提供交流平台,不对该内容负责。
本内容由用户自主发布,如果其内容涉及到知识产权问题,其责任在于用户本人,如对版权有异议,请联系邮箱:xiaomuchong@tal.com - 附件 1 : Engineering_and_Design_Tunnel_and_Shaft_In_Rock.pdf
2014-09-22 08:29:32, 8.42 M
» 收录本帖的淘帖专辑推荐
jianzhu | 程序语言算法分析 |
» 猜你喜欢
全日制(定向)博士
已经有5人回复
假如你的研究生提出不合理要求
已经有10人回复
萌生出自己或许不适合搞科研的想法,现在跑or等等看?
已经有4人回复
Materials Today Chemistry审稿周期
已经有4人回复
参与限项
已经有3人回复
实验室接单子
已经有4人回复
对氯苯硼酸纯化
已经有3人回复
求助:我三月中下旬出站,青基依托单位怎么办?
已经有12人回复
所感
已经有4人回复
要不要辞职读博?
已经有7人回复
» 本主题相关价值贴推荐,对您同样有帮助:
30楼2016-12-29 00:32:19
11楼2015-04-15 12:11:09
简单回复
班若鹰2楼
2014-09-22 08:34
回复
五星好评 顶一下,感谢分享!
rockcity3楼
2014-09-23 07:33
回复
五星好评 顶一下,感谢分享!
civilp4楼
2014-09-23 13:54
回复
三星好评 顶一下,感谢分享!
2014-09-25 00:47
回复
五星好评 顶一下,感谢分享!
2014-09-25 04:57
回复
五星好评 顶一下,感谢分享!
civilp7楼
2014-09-26 09:17
回复
顶一下,感谢分享!
春风20148楼
2014-10-17 21:47
回复
五星好评 顶一下,感谢分享!
2014-12-21 18:57
回复
五星好评 顶一下,感谢分享!
liuwf369710楼
2015-03-04 14:44
回复
三星好评 顶一下,感谢分享!
lecl12楼
2015-05-28 11:00
回复
五星好评 顶一下,感谢分享!
fanjunwei14楼
2015-06-17 13:20
回复
三星好评 顶一下,感谢分享!












回复此楼