| 查看: 259 | 回复: 3 | ||
| 【奖励】 本帖被评价3次,作者关键先生增加金币 2.5 个 | ||
| 当前主题已经存档。 | ||
[资源]
Guidelines for Improving Plant Reliability Through Data Collection and Analysis
|
||
|
Guidelines for Improving Plant Reliability Through Data Collection and Analysis (Guidelines) By Center for Chemical Process Safety (CCPS) Publisher: Wiley-AIChE Number Of Pages: 193 Publication Date: 1998-06-15 ISBN-10 / ASIN: 081690751X ISBN-13 / EAN: 9780816907519 Binding: Hardcover Written by reliability data experts, the book gives plant managers and supervisors the guidance they need to collect, and use with confidence, process equipment reliability data for risk-based decisions. Focusing on the process industries, it provides the protocol and techniques to collect and organize high quality plant performance, maintenance, and repair data from your own operations, and includes methods and examples on how the data can be converted into useful information for engineering, maintenance, safety, and loss prevention. This data can be used for: facility reliability/availability assessments; making decisions on the need for redundant systems; improving equipment designs; selecting the best equipment for specific tasks; estimating required work force; benchmarking current efforts both frequency and time; integrating predictive and preventive maintenance effort; integrating shutdowns with production needs; quantifying risks; and minimizing human reliability issues. http://mihd.net/zpfnck http://www.mediafire.com/?0d1d9mycgwx http://rapidshare.com/files/78864076/GIPR081690751X.rar.html |
» 猜你喜欢
售SCI一区文章,我:8 O5 51O 54,科目齐全,可+急
已经有4人回复
版面费该交吗
已经有8人回复
售SCI一区文章,我:8 O5 51O 54,科目齐全,可+急
已经有5人回复
售SCI一区文章,我:8 O5 51O 54,科目齐全,可+急
已经有3人回复
基金正文30页指的是报告正文还是整个申请书
已经有6人回复
面上可以超过30页吧?
已经有4人回复
过年走亲戚时感受到了所开私家车的鄙视链
已经有12人回复
为什么中国大学教授们水了那么多所谓的顶会顶刊,但还是做不出宇树机器人?
已经有5人回复
售SCI一区文章,我:8 O5 51O 54,科目齐全,可+急
已经有4人回复
售SCI一区文章,我:8 O5 51O 54,科目齐全,可+急
已经有6人回复
2楼2007-12-26 22:56:03













回复此楼