24小时热门版块排行榜    

查看: 651  |  回复: 3

ywjlah

金虫 (小有名气)

[求助] AMR.807-809检索了没有?

帮忙查一下如下论文是否检索:
Advanced Materials Research Vols. 807-809 (2013) pp 2299-2303

Advanced Materials Research Vols. 807-809 (2013) pp 2304-2308
回复此楼
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

tianzhisun

木虫 (正式写手)

大棚郭冬临

【答案】应助回帖

★ ★ ★ ★ ★
ywjlah: 金币+5 2013-11-14 22:38:24
No results were found.
  Use Edit to modify your search

均未检索。
PS:下次最好附上标题
归隐山林
2楼2013-11-13 18:51:30
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

wenhexing

新虫 (小有名气)

1. Add to selected records Accession number:  20134516956148

  Title:  Numerical analysis on ground pressure feature in fully mechanized coal face
  Authors:  Yu, Wei Jian1, 2 ; Feng, Tao1; Guo, Gang Ye2  
  Author affiliation:  1 School of Resources and Safety Engineering, Central South University, Changsha 410083, China  
   2 Hunan Key Laboratory of Safe Mining Techniques of Coal Mines, Hunan University of Science and Technology, Xiangtan 411201, China  
  Source title:  Advanced Materials Research
  Abbreviated source title:  Adv. Mater. Res.
  Volume:  807-809
  Monograph title:  Environmental Protection and Resources Exploitation
  Issue date:  2013
  Publication year:  2013
  Pages:  2299-2303
  Language:  English
  ISSN:  10226680  
  ISBN-13:  9783037858622  
  Document type:  Conference article (CA)
  Conference name:  2013 International Conference on Advances in Energy and Environmental Science, ICAEES 2013
  Conference date:  July 30, 2013 - July 31, 2013
  Conference location:  Guangzhou, China
  Conference code:  100432  
  Publisher:  Trans Tech Publications Ltd, Kreuzstrasse 10, Zurich-Durnten, CH-8635, Switzerland
  Abstract:  Base on the fully mechanized coal face of 8113 (1) in LaoYingSan mine, numerical analysis method was applied to analyze the ground pressure feature, FLAC software is carried out to set up numerical model, and offer numerical procedure. The mining abutment pressure distribute form and its partition in front of fully mechanized working face. All four different mining height (2.6m, 2.8m, 3.0m, 3.2m) was respectively calculated. In addition, the influence of mining speed to mining abutment pressure and intervals is analyzed, four different mining distance (20m, 30m, 40m, 50m) selected separately. Afterwards, the different solution analyzed respectively, these results show that the mining abutment pressure distribution form in front of fully mechanized working face essentially identical, they including the stress increasing zones, the stress decreasing zones and the initial rock stress stable field. The influence of mining pace to wall rock looseness range greater than mining height. © (2013) Trans Tech Publications, Switzerland.
  Number of references:  3
  Main heading:  Numerical analysis  
  Controlled terms:  Abutments (bridge)  -  Coal  
  Uncontrolled terms:  Abutment pressures  -  Coal mining  -  Fully mechanized coal faces  -  Fully-mechanized working faces  -  Ground pressure  -  Mining heights  -  Numerical procedures  -  Stable fields  
  Classification code:  401.1 Bridges -  524 Solid Fuels -  921.6 Numerical Methods
3楼2013-11-17 10:50:05
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

wenhexing

新虫 (小有名气)

Accession number:  20134516956149

  Title:  Law of ground subsidence and strata movement caused by backfill mining of under three coal
  Authors:  Yu, Wei Jian1, 2 ; Feng, Tao1; Chen, Xin Yuan2  
  Author affiliation:  1 School of Resources and Safety Engineering, Central South University, Changsha 410083, China  
   2 Hunan Key Laboratory of Safe Mining Techniques of Coal Mines, Hunan University of Science and Technology, Xiangtan 411201, China  
  Source title:  Advanced Materials Research
  Abbreviated source title:  Adv. Mater. Res.
  Volume:  807-809
  Monograph title:  Environmental Protection and Resources Exploitation
  Issue date:  2013
  Publication year:  2013
  Pages:  2304-2308
  Language:  English
  ISSN:  10226680  
  ISBN-13:  9783037858622  
  Document type:  Conference article (CA)
  Conference name:  2013 International Conference on Advances in Energy and Environmental Science, ICAEES 2013
  Conference date:  July 30, 2013 - July 31, 2013
  Conference location:  Guangzhou, China
  Conference code:  100432  
  Publisher:  Trans Tech Publications Ltd, Kreuzstrasse 10, Zurich-Durnten, CH-8635, Switzerland
  Abstract:  Taking 24 mining area of Zhouyuanshan mine as the research object, analysis on law of ground subsidence and strata movement caused by backfill mining of under three coal is carried on by using numerical simulation method. A three-dimensional numerical model is established by using FLAC 3D software. To analyze the computational scheme of remain wide coal pillar and gradually to finish backfill mining, results showed that the maximal subsidence displacement value is 30.8mm along the coal strike and the subsidence displacement value is 32.1mm along the coal seam inclination; In addition, computational scheme of backfill mining with narrow coal pillar is analyzed, results showed that the filling body plays a stronger supporting role for the roof strata, to fully mobilize the bearing capacity of filling body, forming a relatively coordinated bearing system of backfill body + coal pillar + overlying strata © (2013) Trans Tech Publications, Switzerland.
  Number of references:  3
  Main heading:  Room and pillar mining  
  Controlled terms:  Coal  -  Coal deposits  -  Numerical analysis  -  Numerical models  -  Subsidence  -  Three dimensional  
  Uncontrolled terms:  Backfill minings  -  Computational schemes  -  Displacement value  -  Narrow coal pillars  -  Numerical simulation method  -  Overlying strata  -  Three-dimensional numerical modeling  -  Waterbodies  
  Classification code:  921.6 Numerical Methods -  921 Mathematics -  902.1 Engineering Graphics -  524 Solid Fuels -  503 Mines and Mining, Coal -  502.1 Mine and Quarry Operations -  482 Mineralogy
  DOI:  10.4028/www.scientific.net/AMR.807-809.2304
  Database:  Compendex
   Compilation and indexing terms, © 2013 Elsevier Inc.
4楼2013-11-17 10:51:13
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
相关版块跳转 我要订阅楼主 ywjlah 的主题更新
信息提示
请填处理意见