| ²é¿´: 228 | »Ø¸´: 0 | ||
bity324Òø³æ (ÕýʽдÊÖ)
|
[ÇóÖú]
·Ò뼸¾ä»°
|
|
1.Uless otherwise noted,clearing dimensions are at each 31m station point along the centerline, beginning dimensions at the green are from the green center point, regandless of the distance from the previous station point/dimension. 2. Unless of otherwise directed by the designer or project engineer, all topsoil within the confines of the earthwork operations of the golf course shall be stripped to a depth as specified in the technical specifications, stockpiled and the replaced following the final approval of the golf course features. 3. Ideally, topsoil stockpiles should be located out of the way of golf holes.Howerer, if this is not possible, stockpiles shall be placed in areas: 1)not requiring cut, 2) not irrigation, 3)not to interfere with the construciton of golf features such as tees, greens and bunkers, and 4) not to interfere with the visibility of the overall golf hole inhibiting the designers ability to evaluate the progress of the work. |
» ²ÂÄãϲ»¶
313Çóµ÷¼Á
ÒѾÓÐ3È˻ظ´
310Çóµ÷¼Á
ÒѾÓÐ12È˻ظ´
290Çóµ÷¼Á
ÒѾÓÐ7È˻ظ´
µçÆø×¨Ë¶320Çóµ÷¼Á
ÒѾÓÐ5È˻ظ´
Ò»Ö¾Ô¸Î÷±±¹¤Òµ´óѧ289 085602
ÒѾÓÐ33È˻ظ´
Ò»Ö¾Ô¸¹þ¹¤´ó 085600 277 12²Ä¿Æ»ùÇóµ÷¼Á
ÒѾÓÐ24È˻ظ´
268·Ö085602»¯Ñ§¹¤³Ìµ÷¼Á
ÒѾÓÐ28È˻ظ´
»¯Ñ§¹¤³Ìµ÷¼Á289
ÒѾÓÐ50È˻ظ´
Çóµ÷¼Á£¬262»úеר˶
ÒѾÓÐ8È˻ظ´
305Çóµ÷¼Á
ÒѾÓÐ6È˻ظ´













»Ø¸´´ËÂ¥