| 查看: 248 | 回复: 0 | ||
[求助]
翻译几句话
|
|
1.Uless otherwise noted,clearing dimensions are at each 31m station point along the centerline, beginning dimensions at the green are from the green center point, regandless of the distance from the previous station point/dimension. 2. Unless of otherwise directed by the designer or project engineer, all topsoil within the confines of the earthwork operations of the golf course shall be stripped to a depth as specified in the technical specifications, stockpiled and the replaced following the final approval of the golf course features. 3. Ideally, topsoil stockpiles should be located out of the way of golf holes.Howerer, if this is not possible, stockpiles shall be placed in areas: 1)not requiring cut, 2) not irrigation, 3)not to interfere with the construciton of golf features such as tees, greens and bunkers, and 4) not to interfere with the visibility of the overall golf hole inhibiting the designers ability to evaluate the progress of the work. |
» 猜你喜欢
一个有机合成实验室都需要哪些设备?
已经有11人回复
影响面上的因素
已经有5人回复
求各位大神看下
已经有23人回复
面上再次挂了,太难了,躺也躺不了,倦也卷不过,小学校之殇!
已经有30人回复
2027年申博
已经有4人回复
好消息?这个有何含义???
已经有10人回复
咨询面上基金
已经有4人回复
8月时间戳变的,举个手。玩一下,释放压力
已经有10人回复
【2027博士申请】纳米药物递送方向
已经有4人回复
UV压敏胶开发
已经有7人回复










回复此楼