| 查看: 269 | 回复: 0 | ||
[求助]
翻译几句话
|
|
1.Uless otherwise noted,clearing dimensions are at each 31m station point along the centerline, beginning dimensions at the green are from the green center point, regandless of the distance from the previous station point/dimension. 2. Unless of otherwise directed by the designer or project engineer, all topsoil within the confines of the earthwork operations of the golf course shall be stripped to a depth as specified in the technical specifications, stockpiled and the replaced following the final approval of the golf course features. 3. Ideally, topsoil stockpiles should be located out of the way of golf holes.Howerer, if this is not possible, stockpiles shall be placed in areas: 1)not requiring cut, 2) not irrigation, 3)not to interfere with the construciton of golf features such as tees, greens and bunkers, and 4) not to interfere with the visibility of the overall golf hole inhibiting the designers ability to evaluate the progress of the work. |
» 猜你喜欢
售SCI一区T0P文章,我:8.O.55.1.O.5.4,科目全,可+急
已经有4人回复
售SCI-T0P文章,我:8O.5.5.1.O.54,科目齐全,可+急
已经有3人回复
售SCI文章,我:8O.5.5.1O.54,科目全,可十急
已经有3人回复
售SCI一区T0P文章,我:8.O.55.1.O.5.4,科目全,可+急
已经有3人回复
售SCI一区T0P文章,我:8O.55.1.O.54,科目全,可伽急
已经有5人回复
售SCI一区T0P文章,我:8.O55.1.O.54,科目全,可十急
已经有5人回复
售SCI一区T0P文章,我:8.O.55.1.O.5.4,科目全,可+急
已经有4人回复
售SCI一区T0P文章,我:8.O55.1.O.54,科目全,可十急
已经有4人回复
售SCI一区T0P文章,我:8.O.55.1.O.5.4,科目全,可+急
已经有4人回复
售SCI一区文章,我:8.O.551.O.5.4,科目全,可伽急
已经有4人回复










回复此楼