| 查看: 265 | 回复: 0 | ||
[求助]
翻译几句话
|
|
1.Uless otherwise noted,clearing dimensions are at each 31m station point along the centerline, beginning dimensions at the green are from the green center point, regandless of the distance from the previous station point/dimension. 2. Unless of otherwise directed by the designer or project engineer, all topsoil within the confines of the earthwork operations of the golf course shall be stripped to a depth as specified in the technical specifications, stockpiled and the replaced following the final approval of the golf course features. 3. Ideally, topsoil stockpiles should be located out of the way of golf holes.Howerer, if this is not possible, stockpiles shall be placed in areas: 1)not requiring cut, 2) not irrigation, 3)not to interfere with the construciton of golf features such as tees, greens and bunkers, and 4) not to interfere with the visibility of the overall golf hole inhibiting the designers ability to evaluate the progress of the work. |
» 猜你喜欢
青基如何破局
已经有4人回复
基金不中,共勉
已经有8人回复
基金未中,这种答复是模板吗?
已经有5人回复
为什么资助数各大高校都创新高,自己申请怎么就这么难
已经有5人回复
有多少人是今天查系统知道结果的?
已经有17人回复
导师吐槽:我怎么摊上了这么个极品研究生!
已经有5人回复
怎么看青基中了没有啊
已经有5人回复
梦想
已经有3人回复
面上合作单位盖章
已经有3人回复
看板上这么多中的,有点像50人群里49个人都是骗子的那种感觉……
已经有5人回复









回复此楼