| 查看: 221 | 回复: 0 | ||
[求助]
翻译几句话
|
|
1.Uless otherwise noted,clearing dimensions are at each 31m station point along the centerline, beginning dimensions at the green are from the green center point, regandless of the distance from the previous station point/dimension. 2. Unless of otherwise directed by the designer or project engineer, all topsoil within the confines of the earthwork operations of the golf course shall be stripped to a depth as specified in the technical specifications, stockpiled and the replaced following the final approval of the golf course features. 3. Ideally, topsoil stockpiles should be located out of the way of golf holes.Howerer, if this is not possible, stockpiles shall be placed in areas: 1)not requiring cut, 2) not irrigation, 3)not to interfere with the construciton of golf features such as tees, greens and bunkers, and 4) not to interfere with the visibility of the overall golf hole inhibiting the designers ability to evaluate the progress of the work. |
» 猜你喜欢
294求调剂材料与化工专硕
已经有10人回复
288求调剂
已经有6人回复
287求调剂
已经有4人回复
招收调剂硕士
已经有7人回复
085601材料工程专硕求调剂
已经有8人回复
一志愿武汉理工材料工程专硕调剂
已经有3人回复
【考研调剂】化学专业 281分,一志愿四川大学,诚心求调剂
已经有3人回复
281求调剂(0805)
已经有19人回复
材料考研调剂
已经有3人回复
346求调剂[0856]
已经有6人回复













回复此楼