| 查看: 234 | 回复: 0 | ||
[求助]
翻译几句话
|
|
1.Uless otherwise noted,clearing dimensions are at each 31m station point along the centerline, beginning dimensions at the green are from the green center point, regandless of the distance from the previous station point/dimension. 2. Unless of otherwise directed by the designer or project engineer, all topsoil within the confines of the earthwork operations of the golf course shall be stripped to a depth as specified in the technical specifications, stockpiled and the replaced following the final approval of the golf course features. 3. Ideally, topsoil stockpiles should be located out of the way of golf holes.Howerer, if this is not possible, stockpiles shall be placed in areas: 1)not requiring cut, 2) not irrigation, 3)not to interfere with the construciton of golf features such as tees, greens and bunkers, and 4) not to interfere with the visibility of the overall golf hole inhibiting the designers ability to evaluate the progress of the work. |
» 猜你喜欢
评审感受-评审感受-评审感受
已经有11人回复
26年申博自荐-计算机视觉
已经有5人回复
窗边初夏的小雨
已经有9人回复
导师各种操作恶心咋办
已经有12人回复
现在不知道怎么办,感觉很痛苦
已经有5人回复
生物学博士
已经有6人回复
护理论文 晋升
已经有3人回复
2026年申博-电池方向
已经有11人回复
2026博士申请求助
已经有5人回复
研究生做的很差,你们会让毕业吗?
已经有11人回复












回复此楼