| 查看: 244 | 回复: 0 | ||
[求助]
翻译几句话
|
|
1.Uless otherwise noted,clearing dimensions are at each 31m station point along the centerline, beginning dimensions at the green are from the green center point, regandless of the distance from the previous station point/dimension. 2. Unless of otherwise directed by the designer or project engineer, all topsoil within the confines of the earthwork operations of the golf course shall be stripped to a depth as specified in the technical specifications, stockpiled and the replaced following the final approval of the golf course features. 3. Ideally, topsoil stockpiles should be located out of the way of golf holes.Howerer, if this is not possible, stockpiles shall be placed in areas: 1)not requiring cut, 2) not irrigation, 3)not to interfere with the construciton of golf features such as tees, greens and bunkers, and 4) not to interfere with the visibility of the overall golf hole inhibiting the designers ability to evaluate the progress of the work. |
» 猜你喜欢
E口会评
已经有6人回复
不要再数国自然申请书的 filecode 的分隔符个数了
已经有18人回复
轴手性化合物的确定
已经有5人回复
MSER送审了还被拒稿
已经有6人回复
内心匮乏
已经有7人回复
明天E口面上会评
已经有8人回复
祈祷青基必中
已经有16人回复
生命口会评
已经有12人回复
27届辽宁大学应届毕业生申博
已经有3人回复
关于如何从代码看上不上会
已经有23人回复











回复此楼