| 查看: 297 | 回复: 0 | ||
lmb147铜虫 (正式写手)
|
[求助]
翻译
|
|
8.3.3.2 Number of Data Points. At least four data points shall be taken for each value of tf,i. For the case with a fixed-mount test apparatus, two of the four data points shall be taken during the time period preceding solar noon and the other two shall be taken in the period following solar noon, the specific periods being chosen so that the data points represent times symmetrical to solar noon. This requirement is made so that any transient effects that may be present will not bias the test results when they are used for design purposes. The requirement for obtaining data points equally divided between morning and afternoon is not mandatory when tesing with an altazimuth mount. All test data shall be reported in addition to the fitted curve (see Section 9) so that any difference in efficiency due solely to the operating temperature level of the collector can be discerned in the test report. The curve shall be established by data points that represent efficiency values determined by integrating the data over a time period equal to the time constant, or five minutes, whichever is larger, as determined in accordance with Section 8.3.2. The integrated value of incident solar energy will be divided into the integrated value of energy obtained from the collector to obtain the efficiency value for that test period as described in Section 8.5. 8.3.3.3 Steady-State Conditions. In order to obtain steady-state or sufficiently good quasi-steady-state conditions for the solar collection process, the heat transfer fluid should be circulated through the collector |
» 猜你喜欢
一志愿北交大材料工程总分358求调剂
已经有6人回复
312求调剂
已经有7人回复
材料334求调剂
已经有19人回复
生物与医药273求调剂
已经有6人回复
301求调剂
已经有10人回复
专硕0854初试考材科基,求调剂
已经有5人回复
0703化学
已经有15人回复
0703调剂,一志愿天津大学319分
已经有9人回复
085600材料与化工301分求调剂院校
已经有10人回复
求调剂
已经有8人回复














回复此楼
10