| 查看: 316 | 回复: 0 | ||
lmb147铜虫 (正式写手)
|
[求助]
翻译
|
|
8.3.3.2 Number of Data Points. At least four data points shall be taken for each value of tf,i. For the case with a fixed-mount test apparatus, two of the four data points shall be taken during the time period preceding solar noon and the other two shall be taken in the period following solar noon, the specific periods being chosen so that the data points represent times symmetrical to solar noon. This requirement is made so that any transient effects that may be present will not bias the test results when they are used for design purposes. The requirement for obtaining data points equally divided between morning and afternoon is not mandatory when tesing with an altazimuth mount. All test data shall be reported in addition to the fitted curve (see Section 9) so that any difference in efficiency due solely to the operating temperature level of the collector can be discerned in the test report. The curve shall be established by data points that represent efficiency values determined by integrating the data over a time period equal to the time constant, or five minutes, whichever is larger, as determined in accordance with Section 8.3.2. The integrated value of incident solar energy will be divided into the integrated value of energy obtained from the collector to obtain the efficiency value for that test period as described in Section 8.5. 8.3.3.3 Steady-State Conditions. In order to obtain steady-state or sufficiently good quasi-steady-state conditions for the solar collection process, the heat transfer fluid should be circulated through the collector |
» 猜你喜欢
评审有感
已经有11人回复
面上本子正文33页,违规吗?会被低分嘛?
已经有10人回复
国自然上会要求
已经有9人回复
博士申请
已经有5人回复
今年审到国自然15份,谈谈感受
已经有16人回复
上海大学实验技术岗位非升即走
已经有8人回复
考博自荐
已经有6人回复
青C资助名额大幅增加!
已经有16人回复
重磅!青年科学基金项目(C类)资助增幅预计超过50%
已经有10人回复
我在等一个没有答案的答案
已经有3人回复












回复此楼
30