24小时热门版块排行榜    

查看: 764  |  回复: 5

abrahamking

金虫 (正式写手)

[交流] On the PLC foreign literature?

Introduction
PLC-Programmable Logic Controllers are widely used in recent years the field of industrial control Such as metallurgy, steel, production lines, etc Its main feature is its stable performance, high control precision and easy maintenance. With PC connection, compiled in the production process according to the corresponding program will convert digital signals into analog signal input commands output instructions to control the implementation of components to achieve automatic control purposes. Currently, the main aspects of the music program-controlled fountain imported lighting console and its matching control decoder, once the failure is not easy to repair, the price is more expensive. Using PLC technology, you can use an ordinary PC to replace imported lighting control, easy maintenance, low cost PLC article on how to use music technology to analyze the problem of program-controlled fountain.
PLC's programmable fountain
Fountain is the use of the work produced by the pump pressure, nozzle jet out from the water column, the number of pumps in accordance with a certain type, location, installation, combining different types of nozzles, can have a variety of flower. We can each pump as a working point, programming, the module through the PLC to control each point, that is, through the implementation of the loop on each pump, or gear engagement control, to control the pump The purpose of the work of the state.
To demonstrate the artistic fountain, usually accompanied by a corresponding track, according to the rhythm of the selected track speed, cadence, the preparation of the appropriate pump control procedures to reflect the music's meaning. The most important aspect is the time synchronization, the music is about playing time based on rhythm and sense of music divided into several time periods, the preparation of the corresponding time period in each of the pumps, lighting control program, the precision adjustment of track time and PLC accuracy of programming the same time, but at the same time period, water pumps and lighting same working hours as a subroutine to achieve synchronization in the visual viewing.
At night with lights to enhance the fountain of viewing, optional programmable control of the LED lighting, through the RS485 interface access control, to be completed by their centralized control. According to the light color, light floral point of view, music tracks for the preparation of procedures, working hours have lights and music, pump time synchronization, the principle and the control of pumps on the same principle, will not repeat them here.
Implementation steps       
Pump control
According to the model pump, flower shape and distribution of the location, the uniform numbers, and the number of points with the number-one correspondence PLC module, the pump will be the same flower formation, flower-shaped water pump for each work order, work (as a whole or separately ) for permutations and combinations, preparation of the corresponding subroutines and numbered, giving the corresponding number of working hours to control the pump working hours, working hours type of sustainable, can also be stopped, the performance of both static and dynamic form of
In addition, by adding the drive to track the performance of a flower-shaped soft, add the beauty of the fountain. Between the PLC and inverter in the corresponding equivalent between the PLC's digital signal is converted to analog converter controls the pump speed signal, the dynamic work of pump status, and then flower the shape of the requirements of its permutations and combinations, preparation of subroutine and the corresponding number.
Lighting control
According to the color of light (preferably choose red, yellow, and blue primary colors), the installation location, radiation angle, the lighting state of the permutations and combinations of work, preparation of the corresponding routines, giving the corresponding number of working hours, time and type of flower-shaped water pump , values consistent with the color can be the same, you can also reflect the dynamic inconsistency can also be a two or a superposition of three colors to produce other different colors, rich colors of light.
Time synchronization
This is the entire music program-controlled fountain control the most important and most critical part, because the music program-controlled fountain show the overall effect of the coordinated directly with the time synchronization has a very close relationship, if time synchronization is different, it will lead to music, floral and lighting are not a whole, viewing greatly reduced, so this link is the core link.
"Time synchronization" here includes the three levels of time. First, is the precision of music playback time and the PLC control program consistent with the precision of time, and while the relationship between the two start and stop; Second, according to the rhythm of music tracks, the momentum of the play by length of time, with the corresponding pumps, lights the continuing work of the subroutine the same length of time, that is, the pump light to flower and produce the music and change tracks, or watch when there will be music, flower-shaped and light three close enough relationship between, there is a feeling out of touch dissonant; Third, at the same time period, flower-shaped water pump and lighting the work routine time, consistent with persistent or intermittent, the time to consider the specific values of human persistence of vision time, this flower-shaped water pump and lighting will form a whole, both start and end, uniform, flower-shaped one on one program and lighting program can also be many to many, rich ornamental effect.
Using Windows Media Player ActiveX provides interface can directly control the software (such as Siemens WinCC) call the player to play music, and also by the location of the current music. Has been playing music, and current information can be convenient to achieve integration through the program each time the song of the need to show a variety of fountain patterns. For example, select a time segment here, in the music section of an integer multiple of the basic length of time a small fountain on the pre-establishment of basic good action, when the late preparation of the overall pattern will be more easy to manage.
Music selections, PLC establishment of control procedures
Select the rhythm of music selections should change significantly, the momentum of the track cadence, no significant difference as far as possible not to select the rhythm, the momentum of change is not prominent in the track that would make the process of the preparation of the larger pattern of problems, but also may lead to the fountain The overall effect is not obvious.
Once the music track selected, we must play by the time period, according to rhythm, musical divide, can also be divided using professional music software and recording a good time has been divided. This process is repeated scrutiny, to ensure the accuracy of division of time in order to finally be able to get better overall results. Then, according to a good time has been prepared by the procedure, the selected program when the paragraph with the performance of music content, momentum and emotional harmony, fully embodies the results. Subroutine approach taken here to complete the whole effect of the first song of the flower, in the preparation of the whole pattern when the first song is just the basic movements in a predetermined arrangement on the basis of, modify, track corresponding action spectrum more efficiently. Thus, in the beginning of each time section, only this time with the music turned the basic pattern of routine action (including pumps and lighting program), so relatively easy to do music, fountains, lighting, closely.
Debugging
Programming is completed, the work of making work PLC interface (with remote performance of the current state of the fountain), you can see the entire piece of music in all of the programs of all time period and at the same time period, the pumps on and off and the light action spectrum and demonstrate the implementation of the various components of each moment of the execution state, so you can see results in the field by viewing, recording the feelings of others asked to record the part that needs to be adjusted, modified action spectrum of the corresponding program content, change the order of the corresponding subroutine call, so that the fountains and lights and music with the better.
Sound output
Directly to the computer's sound card to output the audio signal mixer access and power amplifier, equalizer, Compression and other audio equipment in series, the last speaker output from the music scene.
PLC configuration
Control points can be determined according to PLC hardware configuration.
Fountain water pump station according to the overall number, 1 pump contactor control module on the PLC corresponding to a digital output point, an inverter controlled pump module on the PLC corresponding to an analog output point, a separate control group LED lights corresponding to a digital output point, according to their total number to configure the PLC's hardware. Such as PLC use 32 point digital output modules, by calculating the type of module will be able to get the required amount.
According to the specific work environment, and may need to select the appropriate lightning protection equipment, to complete the system protection.
回复此楼

» 猜你喜欢

相信自己,一定是最棒的!
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

小木虫: 沙发+1,金币+0.5, 恭喜抢个沙发,再给个红包
2楼2012-04-21 09:26:54
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

小木虫: 金币+0.2, 抢了个小板凳,给个红包
3楼2012-04-21 09:27:00
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

curton

主管区长 (文坛精英)

Hello Kitty

优秀区长优秀区长优秀区长优秀区长优秀版主优秀版主


why do you post this?
4楼2012-04-21 09:30:07
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

abrahamking

金虫 (正式写手)

引用回帖:
4楼: Originally posted by curton at 2012-04-21 09:30:07:

why do you post this?



why,you don't now。

相信自己,一定是最棒的!
5楼2012-04-21 09:33:12
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
6楼2012-05-01 10:29:32
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
相关版块跳转 我要订阅楼主 abrahamking 的主题更新
普通表情 高级回复 (可上传附件)
信息提示
请填处理意见