24小时热门版块排行榜    

查看: 1735  |  回复: 8
本帖产生 1 个 翻译EPI ,点击这里进行查看
当前只显示满足指定条件的回帖,点击这里查看本话题的所有回帖

十一月臭盆

新虫 (初入文坛)

[求助] 求英译汉翻译 急用的

7.
Review on the design and construction of a large wastewater treatment plant

Abstract: The largest municipal wastewater treatment plant (WWIP) in the Netherlands is the WWTP Houtrust in The Hague. This plant with a capacity of 1 100 000 population equivalents will occupy an area of merely five ha. Due to the limited area the plant is built in three successive phases as an extension of the existing primary sedimentation plant. This paper focuses on the design and construction of the secondary wastewater treatment and sludge handling. The UNOX system, developed by Union Carbide and later by Linde, one of the advanced treatment systems with adequate full scale experience, was chosen. This system uses pure oxygen to aerate and therefore operates on activated sludge with extremely good settling properties. Construction of the extensions of the existing sedimentation plant with the UNOX system started in 1986 and was expected to be completed at the end of 1988.

8.
Foundation construction within wastewater-treatment plant

Abstract: The entire foundation design and construction histories of a project built inside an existing wastewater-treatment plant are described. The foundation type decision process, based on the subsurface conditions, the existing structure's performance, and the proposed facility's constraints are outlined. In addition, the foundation construction histories, including foundation specifications, construction dewatering and monitoring, pile-load-test results and production pile driving records, are summarized. Weak soils existed to significant depths over the entire site as did a high ground-water table. Since the elevations of the bases of the structures varied significantly, it was also cost effective to vary foundation type depending upon the estimated load-carrying capacity of the soil at the base of the proposed foundations. Consideration also had to be given to the possibility of detrimental total and differential settlements as a result of dewatering as well as differences in foundation type between existing and proposed structures. This project demonstrated that a properly designed and adequately executed foundation construction program can effectively eliminate the need for expensive underpinning of nearby existing facilities. And, pile load test is a reliable tool to establish the driving criteria, to confirm the design assumptions, and to economize the required pile length. (3 refs.)

9.
Yannawa wastewater treatment plant (Bangkok, Thailand): Design, construction and operation

Abstract: Yannawa. Wastewater Treatment plant (Phase 1) serves a population equivalent of 500,000 and is located on a restricted site within the city of Bangkok, Thailand. Secondary treatment is based on the CASS? sequencing batch reactor (SBR) process and the plant is one of the largest multi-storey SBRs in the world. The limitation of available site area, the ground conditions and the characteristics of the wastewater to be treated set a series of challenges for the designers, contractors and commissioning and operational staff. This paper briefly describes the collection system, the process selection and the treatment streams of the wastewater treatment plant. The SBR secondary treatment plant is described in more detail. The problems that arose during commissioning and operation and the solutions made possible by the use of an SBR type of process are discussed. Details of plant performance during performance testing and during the first three years of plant operation are provided. ? Earth Tech Engineering Ltd 2004. (6 refs.)
真的很着急  那位高手能帮帮忙啊  谢谢了

[ Last edited by 十一月臭盆 on 2012-4-14 at 11:20 ]

» 猜你喜欢

已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

浪情无情

银虫 (正式写手)

【答案】应助回帖

★ ★ ★ ★ ★ ★ ★
十一月臭盆: 金币+7, 翻译EPI+1, 有帮助, 谢谢 2012-04-14 15:52:21
9. .Yannawa 污水处理厂(曼谷,泰国)的设计、结构及运行
摘要:Yannawa 污水处理厂是一家能处理相当于500000人口排放污水的污水处理厂,该厂坐落在泰国曼谷城一个有限的区域。2级污水处理建于CASS序列组反应器(SBR)程序基础上,Yannawa 污水处理厂是世界最大的多层序列组反应器(SBRs)的污水处理厂之一。受区域内可用面积的局限,以及地面条件和所处理的污水特性,该厂设计人员、承建商以及试车和操作人员都曾面临着各种各样的挑战。本文概括性叙述了该污水处理厂的收集系统、选择程序及污水处理机组,详细地介绍SBR 2级处理设备,对试运转和运转以及使用SBR类型的程序待解决的问题进行了讨论。提供了设备测试及运转的开始3年中的详细性能参数。Earth Tech Engineering Ltd(全球工程技术有限公司) 2004. (参考6.)
蛀住小木虫,腐其肉,朽其骨!
8楼2012-04-14 15:30:39
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
查看全部 9 个回答

浪情无情

银虫 (正式写手)

【答案】应助回帖


Mally89: 金币+1, 感谢应助!~欢迎常来!~好运!~\(^o^)/~ 2012-04-14 12:50:42
7.《污水处理厂的设计结构研究进展》
摘要:荷兰最大的城市污水处理厂是位于海牙的WWTP Houtrust.该厂具有处理相当于100000人口排放废水的能力,占地仅5公顷。受地域限制,该厂仅建有三级连续的处理设施,用作现存的污水初期沉降处理厂的后续处理设施。本文主要叙述2级污水及淤泥处理设施的设计与构造。使用Union Carbide及后来的Linde公司开发的一种经过了充分实践的先进处理系统——UNOX系统。该系统通过加入纯氧,使活性污泥具有相当不错的沉淀性质。1986年开始建造使用该UNOX系统的污水沉降处理厂后续处理设施,并预计到1988年底完成。
蛀住小木虫,腐其肉,朽其骨!
2楼2012-04-14 12:48:18
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

十一月臭盆

新虫 (初入文坛)

引用回帖:
2楼: Originally posted by 浪情无情 at 2012-04-14 12:48:18:
7.《污水处理厂的设计结构研究进展》
摘要:荷兰最大的城市污水处理厂是位于海牙的WWTP Houtrust.该厂具有处理相当于100000人口排放废水的能力,占地仅5公顷。受地域限制,该厂仅建有三级连续的处理设施,用作现 ...

谢谢啊    非常感谢
3楼2012-04-14 13:58:54
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖

十一月臭盆

新虫 (初入文坛)

引用回帖:
2楼: Originally posted by 浪情无情 at 2012-04-14 12:48:18:
7.《污水处理厂的设计结构研究进展》
摘要:荷兰最大的城市污水处理厂是位于海牙的WWTP Houtrust.该厂具有处理相当于100000人口排放废水的能力,占地仅5公顷。受地域限制,该厂仅建有三级连续的处理设施,用作现 ...

能帮忙翻译一下8和9 吗?谢谢了
4楼2012-04-14 14:01:48
已阅   回复此楼   关注TA 给TA发消息 送TA红花 TA的回帖
最具人气热帖推荐 [查看全部] 作者 回/看 最后发表
[考研] 08工科 320总分 求调剂 +5 梨花珞晚风 2026-03-17 5/250 2026-03-18 14:49 by haxia
[考研] 一志愿985,本科211,0817化学工程与技术319求调剂 +6 Liwangman 2026-03-15 6/300 2026-03-18 13:21 by 尽舜尧1
[考研] 288求调剂,一志愿华南理工大学071005 +4 ioodiiij 2026-03-17 4/200 2026-03-18 12:36 by Linda Hu
[考研] 【0703化学调剂】-一志愿华中师范大学-六级475 +6 Becho359 2026-03-11 6/300 2026-03-18 12:09 by djl2006
[考研] 0703化学求调剂 总分331 +3 ZY-05 2026-03-13 3/150 2026-03-18 10:58 by macy2011
[考研] 材料,纺织,生物(0856、0710),化学招生啦 +3 Eember. 2026-03-17 9/450 2026-03-18 10:28 by Eember.
[考研] 一志愿中国海洋大学,生物学,301分,求调剂 +3 1孙悟空 2026-03-17 3/150 2026-03-18 10:28 by macy2011
[考研] 268求调剂 +7 好运连绵不绝 2026-03-12 8/400 2026-03-17 20:28 by xilongliang
[考研] 一志愿苏州大学材料工程(085601)专硕有科研经历三项国奖两个实用型专利一项省级立项 +6 大火山小火山 2026-03-16 8/400 2026-03-17 15:05 by 无懈可击111
[考研] 267一志愿南京工业大学0817化工求调剂 +6 SUICHILD 2026-03-12 6/300 2026-03-17 09:24 by 雾散后相遇lc
[考研] 304求调剂 +4 ahbd 2026-03-14 4/200 2026-03-16 16:48 by 我的船我的海
[考研] 070300化学学硕求调剂 +6 太想进步了0608 2026-03-16 6/300 2026-03-16 16:13 by kykm678
[考研] 283求调剂 +10 小楼。 2026-03-12 14/700 2026-03-16 16:08 by 13811244083
[考研] 中科院材料273求调剂 +4 yzydy 2026-03-15 4/200 2026-03-16 15:59 by Gaodh_82
[考研] 求老师收留调剂 +4 jiang姜66 2026-03-14 5/250 2026-03-15 20:11 by Winj1e
[考研] 0856专硕279求调剂 +5 加油加油!? 2026-03-15 5/250 2026-03-15 11:58 by 2020015
[考研] 288求调剂 +4 奇点0314 2026-03-14 4/200 2026-03-14 23:04 by JourneyLucky
[考研] 材料与化工求调剂一志愿 985 总分 295 +8 dream…… 2026-03-12 8/400 2026-03-13 22:17 by 星空星月
[考研] 四川大学085601材料工程专硕 初试294求调剂 +4 祝我们好在冬天 2026-03-11 4/200 2026-03-13 21:39 by peike
[考研] 材料专硕350 求调剂 +4 王金科 2026-03-12 4/200 2026-03-13 16:02 by ruiyingmiao
信息提示
请填处理意见