| 查看: 507 | 回复: 3 | |||
| 当前主题已经存档。 | |||
firsttaojun木虫 (小有名气)
|
[交流]
请高手帮忙用英语描述一下北京地铁线路图
|
||
|
http://image.baidu.com/i?ct=5033 ... r=&ic=0&s=0 请英语高手帮忙用英语描述一下这张北京地铁线路图,谢谢了 |
» 猜你喜欢
现代”学阀”该如何界定
已经有12人回复
国社科系统bug了,是不是要放榜了?
已经有10人回复
课题组招2027级博士 上海工程技术大学 激光智能制造方向
已经有4人回复
上海工程技术大学 激光智能制造课题组 2027级博士研究生招生
已经有3人回复
上海工程技术大学激光智能制造课题组|2027级博士研究生招生公告
已经有11人回复
我的奶奶
已经有3人回复
firsttaojun
木虫 (小有名气)
- 应助: 0 (幼儿园)
- 金币: 4277.1
- 散金: 21
- 红花: 1
- 帖子: 192
- 在线: 214.6小时
- 虫号: 866496
- 注册: 2009-10-09
- 性别: GG
- 专业: 工程热物理与能源利用
2楼2009-12-28 15:09:17
ysk0321
铁杆木虫 (知名作家)
养猪专业户
- 应助: 4 (幼儿园)
- 金币: 36716.3
- 散金: 3616
- 红花: 3
- 帖子: 7799
- 在线: 1424小时
- 虫号: 721115
- 注册: 2009-03-12
- 性别: GG
- 专业: 化学工程及工业化学

3楼2009-12-28 16:18:43
sixmonths
铁杆木虫 (著名写手)
清歌一曲月如霜
- 应助: 0 (幼儿园)
- 贵宾: 0.96
- 金币: 5630.8
- 红花: 5
- 沙发: 3
- 帖子: 2704
- 在线: 137.3小时
- 虫号: 666458
- 注册: 2008-12-02
- 专业: 临床与咨询心理学
★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★
firsttaojun(金币+20,VIP+0):我找了好久都没找到,不错,全都给你了,谢啦 12-29 08:08
firsttaojun(金币+20,VIP+0):我找了好久都没找到,不错,全都给你了,谢啦 12-29 08:08
|
Beijing's subway lines generally follow the checkerboard layout of the city. Most lines run parallel or perpendicular to each other and intersect at right angles. Line 1, a straight east-west line underneath Chang'an Avenue, which bisects the city through Tiananmen Square. Line 1 connects major commercial centres, Xidan, Wangfujing, Dongdan and the Beijing CBD. Line 2, a rectangular loop line, traces the Ming-era city wall that once surrounded the inner city, and stops at 11 of the wall's former gates (ending in men), now busy intersections, as well as the Beijing Railway Station. Line 4, a mainly north-south line running west of central Beijing with stops at the Summer Palace, Old Summer Palace, Peking and Renmin Universities, Zhongguancun Technology Park, the National Library, Beijing Zoo, Xidan and Beijing South Railway Station. Line 5, a straight north-south line just east of the city centre. It passes the Temple of Earth, Lama Temple and the Temple of Heaven. Line 10, a near-figure-of-7 shaped route to the north and east of Line 2. It follows the Yuan-era city wall in the north, passing just south of the Olympic Green. At the Sanyuanqiao, northeast of the city, Line 10 turns straight south and follows the eastern 3rd Ring Road through the embassy district and Beijing CBD. Olympic Branch Line (Line 8 Phase I) extends north off Line 10 with three stops in the Olympic Green. Line 13 arcs across suburbs north of the city and channels commuters to Xizhimen and Dongzhimen, at the northwest and northeast corners of Line 2. Line Batong extends Line 1 eastward from Sihui to suburban Tongzhou District. The Airport Line connects the Beijing Capital International Airport, 27 km northeast of the city, with Line 10 at Sanyuanqiao and Lines 2 and 13 at Dongzhimen. http://en.wikipedia.org/wiki/Beijing_Subway |

4楼2009-12-28 18:22:40










回复此楼