| 查看: 380 | 回复: 0 | ||
| 当前主题已经存档。 | ||
[资源]
【资源】aspen in plant cost estimator(厂内成本估算)
|
||
|
Aspen In-Plant Cost Estimator厂内成本估算 (formerly Aspen Icarus Project Manager项目管理) 有关其厂内成本估算能的介绍 已经中文标注,详见附件、免费提供,呵呵 下面是预览: Integrating economic evaluation and project management for total optimization Aspen In-Plant Cost Estimator is a powerful tool for in-plant capital and maintenance projects. By integrating the project economic capabilities of the Aspen Icarus technology with the industry-leading project management capabilities of Primavera Project Planner®, Aspen In-Plant Cost Estimator enables companies to optimize the constraints约束of quality, time, and cost simultaneously 质量,时间和费用. Aspen In-Plant Cost Estimator is a core 核心element of AspenTech’s aspenONE™ Process Engineering applications. Features • Aspen In-Plant Cost Estimator focuses on small capital and maintenance projects where an existing process or facility infrastructure is in place and not required as part of the project scope or schedule. Aspen In-Plant Cost Estimator provides the following capabilities: • Primavera Project Planne项目规划r®: Includes an embedded嵌入link to the Primavera Project Planner (P3) to generate a logic-driven CPM construction schedule complete with activities, durations, manpower, and costs活动,持续时间,人力和费用within P3. Each activity is linked to predecessors and successors, and is loaded with resources (costs, effort hours, crew mixes). • User Data Access: Aspen In-Plant Cost Estimator can link to any customer data source for unit cost data and supports all data that can be converted to a dbx format. • Aspen Icarus Technology – Aspen In-Plant Cost Estimator is based on the same technology used in both Aspen Process Economic Analyzer and Aspen Capital Cost Estimator. Aspen Icarus technology is the industry standard for project and process evaluation. Unlike other solutions, the technology does not rely on capacity-factored curves for equipment pricing, nor does it rely on factors to estimate installation quantities and installed cost from bare equipment. It follows a unique approach where equipment, with associated plant bulks, is represented by comprehensive, design-based installation models. Benefits Aspen In-Plant Cost Estimator has provided benefits across a broad range of industries, including refining, petrochemical, chemical, specialty chemical, pulp and paper, mining & minerals, pharmaceutical. and food and beverage industries. Benefits include: Develop detailed designs, estimates, and schedules from minimal project outlines设计,概算,计划最小项目概述 Optimize quality, time, and cost for a project优化质量,时间和费用的项目 Export to Aspen Capital Cost Estimator to provide detailed cost adjustments, etc. 导出到Aspen资本成本估算模块,提供详细的费用调整等 |
» 猜你喜欢
体制内长辈说体制内绝大部分一辈子在底层,如同你们一样大部分普通教师忙且收入低
已经有10人回复
过年走亲戚时感受到了所开私家车的鄙视链
已经有9人回复
今年春晚有几个节目很不错,点赞!
已经有10人回复
情人节自我反思:在爱情中有过遗憾吗?
已经有10人回复
基金正文30页指的是报告正文还是整个申请书
已经有5人回复













回复此楼